← Back
Elevator cooperative
7201 4 AVENUE
BROOKLYN · BIN 3147385
💬 Discuss this project
1924Year Built
6Stories
D4Building Class
R7BZoning
84,000 sfGross Floor Area
86Units
LL97 CoveredRent Stabilized19 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: 7201 OWNERS CORP · 23,370 sf lot · 3.59 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Roof1p · 1 filing · 3 docs
Floor 65p · 3 filings · 20 docs
Floor 5
Floor 4
Floor 31p · 1 filing · 10 docs
Floor 2
Floor 11p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPLINE NYC CONTRACTING507/08/2026
MASTER CONSTRUCTION407/08/2026
AMS CONTRACTOR507/08/2026
JABCO MANAGEMENT303/22/2026
7201 OWNERS2503/22/2026
7201 OWNERS COPR103/22/2026
7201 OWNER CORP103/22/2026
METRO CONTRACTING INC303/21/2026
FIRST SERVICE RESIDENTIAL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI207/22/2024
ASR ENGINEERING PC306/11/2023
MARK VETTER ARCHITECTURE502/24/2022
AZIMUTH ENGINEERING108/10/2021
SYED ENGINEERING, P.C.106/12/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING1003/21/2026
RIZZO GROUP203/21/2026
ECDESIGN STUDIO403/21/2026
ADVANCED BUILDERS SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
RAMAPO COMMUNICATION CORPGeneral Contractor303/21/2026
G & J PLMBNG AND HTG INCPlumbing207/08/2026
AMS CONTRACTOR INCGeneral Contractor207/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor207/08/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
MASTER CONSTRUCTION CO INCGeneral Contractor107/08/2026
SYED-NAQVI ALTAFElectrical103/21/2026
MICHAEL ADANUNCIOElectrical103/21/2026
ARROW CONSTRUCTION CONSULTANTSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394102/28/2024
ASR ENGINEERING PC8404106/06/2023
SYED ENGINEERING, P.C.7054106/06/2023
EK ENGINEERING, P.C.6883202/24/2022
JEREMY K MCKEON, P.E.7263108/10/2021
Building Lifecycle
All (109)Filed (12)Permit Issued (10)Signed Off (4)Violation (60)Inspection (7)Objection (6)Special Inspection (10)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, open)
B
02/02/2025
Violation issued (HPD, closed)
C
02/02/2025
Violation issued (HPD, closed)
C
02/02/2025
Violation issued (HPD, closed)
C
02/02/2025
Violation issued (HPD, open)
A
02/02/2025
Violation issued (HPD, open)
A
02/02/2025
Violation issued (HPD, closed)
C
02/02/2025
Violation issued (HPD, open)
A
02/02/2025
Violation issued (HPD, open)
A
07/24/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT #F7 ON 6th FLOOR WITH GENERAL CONSTRUCTION: REPAINTING WALL, CEILING AND RESURFACE FLOOR AS PER PLAN;NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01010300-I1
07/23/2024
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
07/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
FARHAD BASSIRI-TEHRANI
07/22/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT #F7 ON 6th FLOOR WITH GENERAL CONSTRUCTION: REPAINTING WALL, CEILING AND RESURFACE FLOOR AS PER PLAN;NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01010300-P1
05/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/04/2024
Permit issued — General Construction
B01010300-I1-GC
02/28/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENT #F7 ON 6th FLOOR WITH GENERAL CONSTRUCTION: REPAINTING WALL, CEILING AND RESURFACE FLOOR AS PER PLAN;NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01010300-I1
10/24/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/29/2023
Violation issued (HPD, open)
C
09/29/2023
Violation issued (HPD, closed)
C
09/29/2023
Violation issued (HPD, open)
C
09/29/2023
Violation issued (HPD, open)
B
09/29/2023
Violation issued (HPD, open)
B
08/09/2023
Violation issued (HPD, closed)
C
08/09/2023
Violation issued (HPD, closed)
C
08/09/2023
Violation issued (HPD, open)
B
08/09/2023
Violation issued (HPD, open)
A
08/09/2023
Violation issued (HPD, closed)
C
07/18/2023
Signed off — Alteration
B00885612-I1
06/13/2023
Permit issued — Supported Scaffold
B00887124-I1-SF
06/11/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00887124-I1
06/10/2023
Permit issued — General Construction
B00885612-I1-GC
06/06/2023
Filed — Alteration
B00885612-I1
05/30/2023
Permit issued — Sidewalk Shed
B00881725-I1-SH
05/29/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00881725-I1
04/10/2023
Violation issued (HPD, closed)
B
01/22/2023
Violation issued (HPD, closed)
B
01/22/2023
Violation issued (HPD, closed)
C
01/19/2023
Violation issued (ECB, closed)
Elevators
01/11/2023
Violation issued (ECB, closed)
Elevators
09/30/2022
Permit issued — Antenna
B00562958-I1-AN
07/14/2022
Signed off — Alteration
INSTALLATION OF NEW VENT FOR DRYER & RELOCATION OF BATHROOM VENT. THERE IS NO CHANGE IN SUE, OCCUPANCY OR MEANS OF EGRESS.
B00450253-I1
07/14/2022
Signed off — Alteration
RENOVATION OF AN EXISTING RESIDENTIAL UNIT. NO CHANGE OF USE, OCCUPANCY OR MEANS OF EGRESS
B00428670-I1
03/07/2022
Special inspection requirement — Energy Code Compliance Inspections
Mark Vetter
03/07/2022
Special inspection requirement — HVAC insulation and sealing
Mark Vetter
03/02/2022
Objection resolved — Addressed
03/01/2022
Special inspection requirement — Mechanical Systems
EDWARD KAJA
03/01/2022
Special inspection requirement — Final
Mark Vetter
02/24/2022
Filed — Alteration
INSTALLATION OF NEW VENT FOR DRYER & RELOCATION OF BATHROOM VENT. THERE IS NO CHANGE IN SUE, OCCUPANCY OR MEANS OF EGRESS.
B00450253-P1
02/16/2022
Objection raised — Other
02/15/2022
Filed — Alteration
RENOVATION OF AN EXISTING RESIDENTIAL UNIT. NO CHANGE OF USE, OCCUPANCY OR MEANS OF EGRESS
B00428670-P2
02/14/2022
Special inspection requirement — Mechanical Systems
EDWARD KAJA
02/14/2022
Special inspection requirement — Final
Mark Vetter
02/10/2022
Special inspection requirement — HVAC insulation and sealing
Mark Vetter
02/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Mark Vetter
01/03/2022
Permit issued — Plumbing
B00428670-I1-PL
11/05/2021
Filed — Alteration
RENOVATION OF AN EXISTING RESIDENTIAL UNIT. NO CHANGE OF USE, OCCUPANCY OR MEANS OF EGRESS
B00428670-P1
10/12/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC03/04/2024
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC CONTRACTING06/13/2023
DOB NOWGeneral ConstructionSigned-offMASTER CONSTRUCTION CO INC06/10/2023
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING05/30/2023
DOB NOWAntennaPermit IssuedRAMAPO COMMUNICATION CORP09/30/2022
DOB NOWPlumbingSigned-offG & J PLMBNG AND HTG INC01/03/2022
DOB NOWPlumbingSigned-offG & J PLMBNG AND HTG INC07/19/2021
DOB NOWMechanical SystemsSigned-offARROW CONSTRUCTION CONSULTANTS07/13/2021
DOB NOWSidewalk ShedPermit IssuedAMS CONTRACTOR INC07/27/2020
DOB NOWSidewalk ShedPermit IssuedAMS CONTRACTOR INC06/12/2020
BISOTISSUEDLIBERTY CONSTRUCTION & RE12/16/2021
BISOTISSUEDARROW CONSTRUCTION CONSULTANTS07/08/2021
BISOTISSUEDARROW CONSTRUCTION CONSULTANTS05/14/2021
BISOTISSUEDBLUEROCK DEVELOPMENT & CO04/14/2017
BISEQISSUEDMETRO CONTRACTING NY, INC.07/16/2012
BISEQISSUEDMETRO CONTRACTING NY, INC.09/23/2011
BISEQISSUEDEVEREST SCAFFOLDING INC08/31/2010
BISFBISSUEDMETROPOLITAN HEAT & POWER CO12/10/1990
BISPLISSUEDJ JEKOWSKY & SONS12/05/1990
4 projects · most recent 05/31/2023
FiledStatusContractorScope
05/31/2023Permit IssuedRICHARD NEU—
06/14/2020Permit IssuedRICHARD NEU—
02/27/2019CompleteA #1 UNIVERSAL ELEC'L INC—
07/04/2018CompleteMICHAEL F. ADANUNCIO ELEC—
2 projects · most recent 06/11/2023
Scaffold Sidewalk Shed
FiledStatusContractorScope
06/11/2023Permit IssuedTOPLINE NYC CONTRACTINGScaffold
05/29/2023Permit IssuedTOPLINE NYC CONTRACTINGSidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/24/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/12/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/05/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/16/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/10/2021Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
07/23/2024FinalFARHAD BASSIRI-TEHRANIprogress
07/23/2024Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
03/07/2022Energy Code Compliance InspectionsMark Vetterprogress
03/07/2022HVAC insulation and sealing Mark Vetterenergy_progress
03/01/2022Mechanical SystemsEDWARD KAJAspecial
03/01/2022FinalMark Vetterprogress
02/14/2022Mechanical SystemsEDWARD KAJAspecial
02/14/2022FinalMark Vetterprogress
02/10/2022HVAC insulation and sealing Mark Vetterenergy_progress
02/10/2022Energy Code Compliance InspectionsMark Vetterprogress
▾Documents — 129 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch6
09/01/2026B00562958-I1Request digital key ↗
08/27/2026B00881725-I1Request digital key ↗
08/27/2026B00885612-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00428670-P1Request digital key ↗
08/15/2026B00428670-I1Request digital key ↗
08/15/2026B00428670-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00450253-I1Request digital key ↗
08/15/2026B00450253-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00356721-I1Request digital key ↗
▸Applications & Permits21
▸BISWORK PERMIT APPLICATION9
12/16/2021340780211Open ↗
07/09/2021340786956Open ↗
06/18/2021340786956Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
11/20/2021340780211Open ↗
01/12/2021340780211Open ↗
12/01/2020340780211Open ↗
Showing 3 of 8 on file for this type
▸BISLL114/19 PERMIT RESTRICTION3
05/04/2021340786956Open ↗
03/04/2021340786956Open ↗
01/12/2021340780211Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/26/2021340786956Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/01/2026B00450253-P1Open ↗
09/01/2026B00450253-I1Open ↗
09/01/2026B00428670-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B00428670-I1Open ↗
09/02/2026B00428670-I1Open ↗
09/01/2026B00450253-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/21/2017321556678Open ↗
09/27/2011320371799Open ↗
11/15/2010320237917Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/21/2017321556678Open ↗
09/27/2011320371799Open ↗
11/15/2010320237917Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00450253-I1Open ↗
09/01/2026B00450253-P1Open ↗
09/01/2026B01010300-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/14/2020340780211Open ↗
11/23/2020340786956Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/27/2011320371799Open ↗
11/12/2010320237917Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
11/25/2020340780211Open ↗
11/23/2020340786956Open ↗
▸BISProfessional and Owner Certification (POC3)1
08/31/2010320207343Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/24/2017321556678Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
11/12/2010320237917Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/24/2017321556678Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan4
09/01/2026B00428670-P1Open ↗
08/15/2026B00428670-I1Open ↗
08/15/2026B00428670-P2Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
01/12/2021340780211Open ↗
04/24/2017321556678Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
11/23/2020340786956Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00450253-P1Open ↗
09/01/2026B00450253-I1Open ↗
09/01/2026B00428670-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
02/16/2021340780211Open ↗
11/25/2020340780211Open ↗
11/23/2020340786956Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/31/2010320207343Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/12/2010320237917Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/21/2017321556678Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/23/2020340786956Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/27/2022340786956Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/23/2020340786956Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026B00428670-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY7
02/01/2022340786956Open ↗
01/27/2022340786956Open ↗
11/20/2021340780211Open ↗
Showing 3 of 7 on file for this type
▸BISHYDRO FLOW TEST LETTER1
11/12/2010320237917Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS3
09/27/2011320371799Open ↗
11/12/2010320237917Open ↗
08/31/2010320207343Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/25/2017321556678Open ↗
07/18/2012320371799Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/04/2022340786956Open ↗
01/31/2011320207343Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT6
01/27/2022340786956Open ↗
02/26/2021340786956Open ↗
02/22/2021340786956Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
01/12/2021340780211Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
12/16/2021340780211Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET3
04/24/2017321556678Open ↗
09/27/2011320371799Open ↗
11/15/2010320237917Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
11/30/2020340780211Open ↗
11/23/2020340786956Open ↗
08/31/2010320207343Open ↗
▸BISADDITIONAL INFORMATION2
02/17/2021340780211Open ↗
12/26/2020340786956Open ↗
▸BISBOROUGH INTAKE FORM2
06/18/2021340786956Open ↗
05/03/2021340786956Open ↗