← Back
QUEENS
73-09 67 DRIVE
QUEENS · BIN 4623520
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Roof4p · 2 filings · 20 docs
Floor 33p · 3 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 17 docs
Cellar7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J SQUARE ARCHITECT DPC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J SQUARE ARCHITECTURE DPC1101/10/2025
LUNA ENGINEERING INC.105/16/2022
MADRIAGA ENGINEERING P.C.206/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JP GENERAL CONTRACTING &General Contractor1307/08/2026
ADRIANO PLMBG & HTG CORPPlumbing807/08/2026
ADRIANO PLUMBING HEATINPlumbing403/22/2026
ZAHIR SAKOORElectrical203/21/2026
ADRIANO PLUMBING & HEATINGFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CARUSONE & CHERRES ARCHIT6166601/10/2025
CITY-WIDE TESTING INC416401/10/2025
REGIONAL TESTING CORP.394211/06/2024
Building Lifecycle
All (67)Filed (14)Permit Issued (10)Signed Off (5)Inspection (7)Objection (3)Special Inspection (28)
05/19/2026
Signed off — Alteration
HEREWITH FILING FOR FOUNDATION IN CONJUNCTION WITH NB 440663872
Q00781822-I1
12/03/2025
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB 440663872
Q00857944-I1
12/02/2025
Signed off — Alteration
FILING FOR SPRINKLER WORK IN CONJUNCTION WITH NB APPLICATION 440663872
Q00903820-I1
07/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/19/2025
Signed off — Alteration
FILING FENCE IN CONJUNCTION WITH NB APPLICATION 440663872 AND ALT 1 Q00503667
Q00505218-I1
01/10/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB 440663872
Q00857944-P3
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JORGE CHERRES
01/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ELIAS RASABI
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JORGE CHERRES
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN PETER PORRETTO
01/10/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ELIAS RASABI
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN PETER PORRETTO
01/10/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ELIAS RASABI
01/10/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ELIAS RASABI
11/25/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB 440663872
Q00857944-P2
11/25/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ELIAS RASABI
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JORGE CHERRES
11/25/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ELIAS RASABI
11/25/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN PETER PORRETTO
11/23/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
11/15/2024
Permit issued — Plumbing
Q00857944-I1-PL
11/15/2024
Permit issued — Sprinklers
Q00903820-I1-EW-SP
11/06/2024
Filed — Alteration
FILING FOR SPRINKLER WORK IN CONJUNCTION WITH NB APPLICATION 440663872
Q00903820-P1
11/06/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB 440663872
Q00857944-P1
11/06/2024
Special inspection requirement — Sprinkler Systems
Paul Raymond
07/26/2024
Permit issued — Construction Fence
Q00505218-I1-FN
06/07/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/16/2024
Permit issued — Plumbing
Q00857944-I1-PL
04/16/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/19/2023
Permit issued — Sprinklers
Q00903820-I1-EW-SP
07/13/2023
Filed — Alteration
FILING FOR SPRINKLER WORK IN CONJUNCTION WITH NB APPLICATION 440663872
Q00903820-I1
04/12/2023
Permit issued — Plumbing
Q00857944-I1-PL
04/11/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB 440663872
Q00857944-I1
02/22/2023
Permit issued — Construction Fence
Q00505218-I1-FN
11/17/2022
Signed off — Alteration
HEREWITH FILING SOE IN CONJUNCTION WITH NB APPLICATION 440663872
Q00733687-I1
09/01/2022
Permit issued — Foundation
Q00781822-I1-FO
08/23/2022
Filed — Alteration
HEREWITH FILING FOR FOUNDATION IN CONJUNCTION WITH NB 440663872
Q00781822-P1
07/26/2022
Filed — Alteration
HEREWITH FILING FOR FOUNDATION IN CONJUNCTION WITH NB 440663872
Q00781822-I1
05/25/2022
Permit issued — Support of Excavation
Q00733687-I1-SE
05/16/2022
Filed — Alteration
HEREWITH FILING SOE IN CONJUNCTION WITH NB APPLICATION 440663872
Q00733687-I1
05/09/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JORGE CHERRES
05/09/2022
Special inspection requirement — Final
JOHN PETER PORRETTO
05/09/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JORGE CHERRES
05/09/2022
Special inspection requirement — Subgrade Inspections
JORGE CHERRES
03/18/2022
Permit issued — Construction Fence
Q00505218-I1-FN
03/07/2022
Filed — Alteration
FILING FENCE IN CONJUNCTION WITH NB APPLICATION 440663872 AND ALT 1 Q00503667
Q00505218-P1
07/09/2021
Objection raised — Other
06/28/2021
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB 440663872
Q00525234-S1
06/24/2021
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH NB 440663872
Q00525234-I1
06/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/24/2021
Special inspection requirement — Post-installed Anchors
06/24/2021
Special inspection requirement — Sprinkler Systems
06/18/2021
Objection raised — Other
06/18/2021
Objection resolved — Resolved
05/19/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/19/2021
Special inspection requirement — Maintenance information
05/19/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP11/15/2024
DOB NOWSprinklersSigned-offADRIANO PLUMBING & HEATIN11/15/2024
DOB NOWConstruction FenceSigned-offJP GENERAL CONTRACTING &07/26/2024
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP04/16/2024
DOB NOWSprinklersSigned-offADRIANO PLUMBING & HEATIN07/19/2023
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP04/12/2023
DOB NOWConstruction FenceSigned-offJP GENERAL CONTRACTING &02/22/2023
DOB NOWFoundationPermit IssuedJP GENERAL CONTRACTING &09/01/2022
DOB NOWSupport of ExcavationSigned-offJP GENERAL CONTRACTING &05/25/2022
DOB NOWConstruction FenceSigned-offJP GENERAL CONTRACTING &03/18/2022
BIS—ISSUEDJP GENERAL CONTRACTING &09/04/2024
BIS—ISSUEDJP GENERAL CONTRACTING &08/28/2023
BIS—ISSUEDJP GENERAL CONTRACTING &08/05/2022
BIS—ISSUEDJP GENERAL CONTRACTING &06/06/2022
1 project · most recent 06/28/2021
FiledStatusContractorScope
06/28/2021———
1 project · most recent 06/28/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/28/2021——Gas, Storm, Water/Sanitary
1 project · most recent 06/06/2025
General Wiring
FiledStatusContractorScope
06/06/2025CompleteSOLID STATE ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/23/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/07/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2024Pass-Final PL - UndergroundPassView ↗
02/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
01/10/2025Fire-Resistant Penetrations and JointsJORGE CHERRESspecial
01/10/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationELIAS RASABIspecial
01/10/2025Fire-Resistant Penetrations and JointsJORGE CHERRESspecial
01/10/2025Energy Code Compliance InspectionsJOHN PETER PORRETTOprogress
01/10/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesELIAS RASABIspecial
01/10/2025Energy Code Compliance InspectionsJOHN PETER PORRETTOprogress
01/10/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesELIAS RASABIspecial
01/10/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationELIAS RASABIspecial
11/25/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesELIAS RASABIspecial
11/25/2024Fire-Resistant Penetrations and JointsJORGE CHERRESspecial
11/25/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationELIAS RASABIspecial
11/25/2024Energy Code Compliance InspectionsJOHN PETER PORRETTOprogress
11/06/2024Sprinkler SystemsPaul Raymondspecial
05/09/2022Excavations - Sheeting, Shoring, and BracingJORGE CHERRESspecial
05/09/2022FinalJOHN PETER PORRETTOprogress
05/09/2022Subsurface Conditions – Fill Placement & In-Place DensityJORGE CHERRESspecial
05/09/2022Subgrade InspectionsJORGE CHERRESspecial
06/24/2021Fire-Resistant Penetrations and Joints—special
06/24/2021Post-installed Anchors—special
06/24/2021Sprinkler Systems—special
05/19/2021Subsurface Investigations (Borings/Test Pits)—special
05/19/2021Maintenance information—energy_progress
05/19/2021HVAC-R and service water piping design and insulation—energy_progress
05/19/2021HVAC-R and service water heating equipment—energy_progress
05/19/2021Fire-Resistant Penetrations and Joints—special
Latest 25 of 28.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026Q00525234-S1Request digital key ↗
08/26/2026Q00733687-I1Request digital key ↗
08/25/2026Q00781822-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
01/21/2025440663872Open ↗
11/07/2022440663872Open ↗
10/25/2021440663872Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
11/25/2024440672363Open ↗
▸BISWORK PERMIT APPLICATION1
06/22/2022440663872Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/04/2021440663872Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
11/04/2021440663872Open ↗
▸BISZONING DIAGRAM1
11/04/2021440663872Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/04/2021440663872Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026Q00525234-I1Open ↗
08/27/2026Q00525234-S1Open ↗
08/25/2026Q00781822-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026Q00857944-P2Open ↗
09/23/2026Q00857944-P2Open ↗
09/17/2026Q00857944-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026Q00857944-P2Open ↗
09/17/2026Q00857944-P3Open ↗
08/25/2026Q00857944-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
05/17/2021440672363Open ↗
02/23/2021440663872Open ↗
▸Trade Schedules & Equipment1
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
08/23/2021440663872Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/17/2022440663872Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/23/2022440663872Open ↗
09/22/2021440663872Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
05/31/2022440663872Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/04/2025440663872Open ↗
05/23/2022440663872Open ↗
05/23/2022440663872Open ↗
Showing 3 of 6 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
05/17/2022440663872Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/22/2022440663872Open ↗
▸BISSOIL REPORT1
08/23/2021440663872Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
06/22/2022440663872Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/17/2022440663872Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00525234-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
10/25/2021440663872Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
06/22/2022440663872Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
02/21/2025440663872Open ↗
11/10/2022440663872Open ↗
08/23/2021440663872Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/17/2021440672363Open ↗
02/23/2021440663872Open ↗
▸BISBOROUGH INTAKE FORM1
06/22/2022440663872Open ↗
▸Other Documents8
▸BISBPP - SUPPORTING DOCUMENTATION3
11/25/2024440672363Open ↗
11/25/2024440672363Open ↗
05/17/2021440672363Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
08/23/2021440663872Open ↗
04/15/2021440663872Open ↗
▸BISFIREPLACES1
05/31/2022440663872Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/23/2021440663872Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00733687-I1Open ↗