← Back
Over six families without stores
73 SOUTH 9 STREET
BROOKLYN · Williamsburg · BIN 3059578
💬 Discuss this project
1910Year Built
4Stories
C1Building Class
R6Zoning
6,638 sfGross Floor Area
7Units
Rent Stabilized7 Open Violations 6 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: LOS SURES TPT YR15 HOUSING DEVELOPMENT F UND CORPOR · 3,990 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction38p · 2 filings · 20 docs
Floor 4Under Construction30p · 1 filing · 20 docs
Floor 3Under Construction30p · 1 filing · 20 docs
Floor 2Under Construction31p · 1 filing · 20 docs
Floor 1Under Construction36p · 2 filings · 20 docs
CellarUnder Construction33p · 1 filing · 20 docs
Sub-BasementUnder Construction30p · 1 filing · 20 docs
Site & exterior9p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOUTHSIDE UNITED-LOS SURES MANAGEME2107/08/2026
RELIABLE ENTERPRISES607/08/2026
MSR CONSTRUCTION CORP503/22/2026
RENNON CONSTRUCTION407/08/2026
NYC DEPT OF HOUSING PERSERVATIO203/21/2026
HPD203/21/2026
LOS SURES TPT YR15 HOUSING DEVELOPMENT F UND CORPOR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VICTOR M. MORALES, ARCHITECT1106/25/2025
RIGID STRUCTURAL DESIGN, LLC103/17/2025
MJE PROFESSIONAL SERVICES111/12/2024
ASHRAF CORP105/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ERIC RAMOS RODRIGUEZ CONSULTING1103/21/2026
RENNON CONSTRUCTION103/21/2026
Rigid Structural Design, LLC403/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. CONSTRUCTION CORPGeneral Contractor507/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor307/08/2026
MSR CONSTRUCTION CORPGeneral Contractor203/21/2026
AURA PLUMBING INCPlumbing207/02/2026
RENNON CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803706/24/2025
URBAN INTEGRATIONS LLC7993103/21/2025
VICTOR MORALES, ARCHITECT8475107/10/2024
Building Lifecycle
All (125)Filed (15)Permit Issued (12)Signed Off (3)Violation (47)Objection (18)Special Inspection (30)
06/30/2026
Permit issued — Plumbing
B00945712-S1-PL
05/05/2026
Violation issued (HPD, closed)
A
03/03/2026
Permit issued — Mechanical Systems
B00945712-S2-MS
03/03/2026
Permit issued — General Construction
B00945712-I1-GC
01/30/2026
Permit issued — Mechanical Systems
B00945712-S2-MS
11/14/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01139765-I1
11/13/2025
Signed off — Alteration
INSTALLATION OF 105' NEW SIDEWALKSHED AT 73 SOUTH 9TH ST, AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00738828-I1
10/15/2025
Permit issued — Sidewalk Shed
B01139765-I1-SH
09/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
09/02/2025
Objection resolved — Addressed
08/25/2025
Permit issued — General Construction
B00945712-I1-GC
07/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
07/31/2025
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
07/31/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
07/31/2025
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
07/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
07/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
07/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
07/24/2025
Signed off — Alteration
B01195422-I1
07/22/2025
Objection resolved — Addressed
07/11/2025
Objection raised — Scope
07/11/2025
Objection resolved — Addressed
07/11/2025
Objection raised — Scope
07/11/2025
Objection resolved — Addressed
07/11/2025
Objection resolved — Addressed
07/09/2025
Objection raised — Cost
07/09/2025
Objection raised — Scope
07/08/2025
Violation issued (HPD, open)
B
07/08/2025
Violation issued (HPD, open)
C
07/08/2025
Violation issued (HPD, closed)
B
07/08/2025
Violation issued (HPD, closed)
C
07/08/2025
Violation issued (HPD, open)
B
07/08/2025
Violation issued (HPD, open)
B
07/08/2025
Violation issued (HPD, open)
B
07/08/2025
Violation issued (HPD, open)
C
07/08/2025
Violation issued (HPD, closed)
A
07/08/2025
Objection raised — Scope
07/08/2025
Objection resolved — Addressed
07/07/2025
Objection raised — Fire_Protection
06/25/2025
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at gas ranges. Replace existing roof drain and existing plumbing piping insulation.
B00945712-P7
06/24/2025
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at gas ranges. Replace existing roof drain and existing plumbing piping insulation.
B00945712-P8
06/24/2025
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at gas ranges. Replace existing roof drain and existing plumbing piping insulation.
B00945712-P6
06/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
06/19/2025
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
06/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/19/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
06/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
06/19/2025
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
06/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
06/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/10/2025
Violation issued (HPD, closed)
A
03/24/2025
Permit issued — Suspended Scaffold
B01198055-I1-SC
03/21/2025
Filed — Alteration
B01198055-I1
03/18/2025
Permit issued — Protection and Mechanical Methods
B01195422-I1-PMM
03/17/2025
Filed — Alteration
B01195422-I1
02/07/2025
Permit issued — Plumbing
B00945712-S1-PL
11/13/2024
Permit issued — Sidewalk Shed
B01139765-I1-SH
11/12/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01139765-I1
09/23/2024
Permit issued — General Construction
B00945712-I1-GC
09/13/2024
Filed — Alteration
Application filed herewith to replace existing bathroom & kitchen plumbing fixtures with new. Provide new gas flex-connections at gas ranges. Replace existing roof drain and existing plumbing piping insulation.
B00945712-P5
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC06/30/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. CONSTRUCTION CORP03/03/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP03/03/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. CONSTRUCTION CORP01/30/2026
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC10/15/2025
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP08/25/2025
DOB NOWSuspended ScaffoldPermit IssuedMSR CONSTRUCTION CORP03/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offMSR CONSTRUCTION CORP03/18/2025
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC02/07/2025
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC11/13/2024
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP09/23/2024
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP05/20/2022
BISSPISSUEDIZI PLBG & HTG SERVICES LTD06/05/2003
BISPLISSUEDIZI PLBG & HTG SERVICES LTD04/01/2003
BISEQISSUEDJTG & SONS SCAFFOLDING CO INC07/31/2002
BIS—ISSUEDA.A.D. CONSTRUCTION CORP07/08/2002
BISOTISSUEDCONCORD PARK DEVELOPMENT09/01/1999
BISEQISSUEDD/B/A B & A GENERAL CONST. CO01/08/1999
1 project · most recent 06/25/2025
Gas Water/Sanitary
FiledStatusContractorScope
06/25/2025Permit IssuedAURA PLUMBING INCGas, Water/Sanitary
3 projects · most recent 08/06/2026
FiledStatusContractorScope
08/06/2026CompleteTECHNO-VOLT ELEC, INC—
11/14/2024Permit IssuedRICHARD NEU—
05/18/2022Permit IssuedHIGH QUALITY ELECTRIC OF—
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
09/09/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
07/31/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
07/31/2025Mechanical SystemsSAMI HAJJAR P.Especial
07/31/2025FinalSAMI HAJJAR P.Eprogress
07/31/2025Shutoff dampersSAMI HAJJAR P.Eenergy_progress
07/31/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
07/31/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
07/31/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
06/19/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
06/19/2025Mechanical SystemsSAMI HAJJAR P.Especial
06/19/2025Tenant Protection Plan Compliance—special
06/19/2025FinalSAMI HAJJAR P.Eprogress
06/19/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
06/19/2025Shutoff dampersSAMI HAJJAR P.Eenergy_progress
06/19/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
06/19/2025Tenant Protection Plan Compliance—special
09/11/2024Tenant Protection Plan Compliance—special
09/11/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/11/2024MasonrySAMI HAJJAR P.Especial
09/11/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
09/11/2024FinalSAMI HAJJAR P.Eprogress
09/11/2024Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
09/11/2024Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
09/11/2024Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
09/11/2024Tenant Protection Plan Compliance—special
Latest 25 of 40.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/29/2026B00738828-I1Request digital key ↗
08/23/2026B01139765-I1Request digital key ↗
08/22/2026B01195422-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/22/2026B01195422-I1Open ↗
08/21/2026B00945712-P1Open ↗
08/21/2026B00945712-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026B00945712-P5Open ↗
08/27/2026B00945712-P5Open ↗
08/25/2026B00945712-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026B00945712-P5Open ↗
08/25/2026B00945712-S2Open ↗
08/25/2026B00945712-S2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/21/2026B00945712-S2Open ↗
08/21/2026B00945712-S1Open ↗
08/21/2026B00945712-P6Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/22/2026B01195422-I1Open ↗
08/21/2026B00945712-P1Open ↗
08/21/2026B00945712-S1Open ↗
Showing 3 of 13 on file for this type
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026B01198055-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01198055-I1Open ↗