| Owner | Filings | Most Recent |
|---|---|---|
| APTPE | 22 | 09/13/2026 |
| CROWN 730 INVEST | 308 | 07/10/2026 |
| GENERAL GROW PROPERTIES C/O STAR | 27 | 07/08/2026 |
| BROOKFIELD PROPERTIES | 10 | 07/08/2026 |
| AMAN NEW YORK | 13 | 04/09/2026 |
| FOSTER LOMAS ARCHITECTS LTD | 5 | 03/22/2026 |
| PCCM MANAGEMENT CORP. | 5 | 03/22/2026 |
| BROOKFIELD | 3 | 03/22/2026 |
| MRA ENGINEERING P.C. | 1 | 03/22/2026 |
| EBRO DIQUE GROUP | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| CES ENGINEERING LLC | 12 | 08/07/2026 |
| GRADE ARCHITECTURE + INTERIOR DESIG | 4 | 08/07/2026 |
| FIVE PHASE ENGINEERING, PLLC | 1 | 05/19/2026 |
| ABS ENGINEERING, PLLC | 3 | 05/18/2026 |
| M. ZIEMKE ARCHITECTURE, PC | 1 | 05/18/2026 |
| COLLECTIF ENGINEERING PLLC | 6 | 05/07/2026 |
| ROSINI ENGINEERING, PC | 15 | 03/12/2026 |
| SAWICKITARELLA ARCHITECTURE+DESIGN | 1 | 03/11/2026 |
| SOCOTEC, INC. | 3 | 12/22/2025 |
| COLBERG ARCHITECTURE | 2 | 10/29/2025 |
| HD GROUP | 3 | 08/27/2025 |
| ANZ CONSULTING ENGINEERING, PLLC | 4 | 07/23/2025 |
| CRISTOF EIGELBERGER | 3 | 05/27/2025 |
| HANINGTON ENGINEERING CONSULTANTS | 7 | 05/23/2025 |
| KIT MIDDLETON ARCHITECT P.C. | 2 | 05/08/2025 |
| WSP | 1 | 05/08/2025 |
| HANINGTON ENGINEERING CONSUL, LLC | 3 | 03/14/2025 |
| YUN ARCHITECTURE LLC | 1 | 08/05/2024 |
| POTENTIAL ENGINEERING P.C. | 9 | 04/11/2024 |
| MURRAY ENGINEERING PC | 1 | 04/11/2024 |
| THOMAS W HUT ARCHITECT PLLC | 4 | 01/30/2024 |
| SILMAN | 5 | 01/23/2024 |
| TPD ARCHITECTURE, PLLC | 1 | 01/22/2024 |
| SHAABAN ENGINEERING, LLC | 3 | 11/20/2023 |
| ZABIK-TURNER ENGINEERING | 2 | 04/06/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| GILLMAN CONSULTING | 90 | 03/21/2026 |
| CODE | 30 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 40 | 03/21/2026 |
| ARISTAR GROUP | 6 | 03/21/2026 |
| RIZZO GROUP | 35 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 4 | 03/21/2026 |
| SKYLINE ACCESS | 1 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 3 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STARR INDUSTRIES LLC | General Contractor | 30 | 07/08/2026 |
| SILVERLINING INTERIORS | General Contractor | 19 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 15 | 07/08/2026 |
| KG SPRINKLER CORP | Fire Protection | 14 | 09/18/2026 |
| TOP ROCK DEVELOPMENT AND | General Contractor | 13 | 07/08/2026 |
| UNIVERSAL BUILD SUPP LLC | General Contractor | 13 | 07/08/2026 |
| DONATO PLUMBING, INC | Plumbing | 12 | 09/18/2026 |
| REGAL RECONSTRUCTION CORP. | General Contractor | 12 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 10 | 07/08/2026 |
| MICHILLI INC | General Contractor | 10 | 07/08/2026 |
| NORWOOD DESIGN& BUILD INC | General Contractor | 9 | 09/25/2026 |
| REIS EY, INC | General Contractor | 8 | 07/08/2026 |
| DICKINSON CAMERON CONSTRUCTION | General Contractor | 7 | 07/08/2026 |
| SHAWMUT WOODWORKING & SUPPLY | General Contractor | 6 | 07/08/2026 |
| PREFERRED SPKLR AND MECH | Fire Protection | 6 | 07/08/2026 |
| TREDENT CONTRACTING SERVI | General Contractor | 6 | 04/09/2026 |
| SDC LLC | General Contractor | 5 | 04/09/2026 |
| SWING STAGING LLC | General Contractor | 5 | 04/09/2026 |
| EBRO DIQUE GROUP, LLC | General Contractor | 4 | 07/08/2026 |
| JJ MATTHEWS INC | General Contractor | 4 | 03/21/2026 |
| PCCM MANAGEMENT CORP | General Contractor | 3 | 03/21/2026 |
| PACE PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 2 | 07/08/2026 |
| WALSH, LINDA | Electrical | 2 | 03/21/2026 |
| JKT CONSTRUCTION INC | General Contractor | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ALAN MARGOLIN & ASSOC | 423 | 6 | 08/07/2026 |
| CROSSCHECK INSPECTION SER | 544 | 8 | 05/07/2026 |
| ROSINI ENGINEERING, PC | 3282 | 6 | 03/12/2026 |
| SKYLINE ENGINEERING, PLLC | 267 | 36 | 02/26/2026 |
| SOCOTEC, INC. | 301 | 2 | 12/22/2025 |
| IMPACT CONCRETE & CONTROL | 864 | 1 | 08/27/2025 |
| SPECIAL TESTING & CONSULT | 1688 | 6 | 05/27/2025 |
| RYAN SPECIAL ENGINEERING | 2018 | 2 | 05/08/2025 |
| AMERICAN CONSTRUCTION TES | 9731 | 1 | 05/08/2025 |
| COASTAL CONSTRUCTION SERV | 3827 | 12 | 03/19/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | LTB MECHANICAL CORP | 09/24/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 09/17/2026 |
| DOB NOW | Structural | Permit Issued | HIGHLINE CONSTRUCTION GR | 09/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | KG SPRINKLER CORP | 09/17/2026 |
| DOB NOW | General Construction | Permit Issued | HIGHLINE CONSTRUCTION GR | 09/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | KG SPRINKLER CORP | 07/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | KG SPRINKLER CORP | 06/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | REIS EY, INC | 06/09/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 06/04/2026 |
| DOB NOW | General Construction | Permit Issued | KA&C MECH LLC | 05/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | NORWOOD DESIGN& BUILD INC | 05/12/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 05/05/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 04/24/2026 |
| DOB NOW | General Construction | Permit Issued | SILVERLINING INTERIORS | 04/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SILVERLINING INTERIORS | 04/21/2026 |
| DOB NOW | Sprinklers | Permit Issued | METRO FIRE PROT HLDG CORP | 03/19/2026 |
| DOB NOW | Plumbing | Permit Issued | A PLUS PLUMBING CORP | 03/19/2026 |
| DOB NOW | General Construction | Permit Issued | JKT CONSTRUCTION INC | 03/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JKT CONSTRUCTION INC | 03/17/2026 |
| DOB NOW | General Construction | Permit Issued | SILVERLINING INTERIORS | 12/16/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SILVERLINING INTERIORS | 12/15/2025 |
| DOB NOW | General Construction | Permit Issued | REIS EY, INC | 12/15/2025 |
| DOB NOW | Sprinklers | Permit Issued | H M SPRINKLER INC | 10/15/2025 |
| DOB NOW | Structural | Signed-off | SDC LLC | 10/03/2025 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 09/26/2025 |
| DOB NOW | General Construction | Signed-off | TREDENT CONTRACTING SERVI | 09/18/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TREDENT CONTRACTING SERVI | 08/27/2025 |
| DOB NOW | Plumbing | Permit Issued | HENRY MYERS P & H, INC | 08/12/2025 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 08/11/2025 |
| DOB NOW | Sprinklers | Permit Issued | H M SPRINKLER INC | 07/09/2025 |
| DOB NOW | General Construction | Permit Issued | NORWOOD DESIGN& BUILD INC | 06/23/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | SKYLINE RESTORATION INC | 06/13/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | NORWOOD DESIGN& BUILD INC | 06/11/2025 |
| DOB NOW | Structural | Permit Issued | NORWOOD DESIGN& BUILD INC | 06/11/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 06/11/2025 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 06/09/2025 |
| DOB NOW | Sprinklers | Permit Issued | H M SPRINKLER INC | 06/09/2025 |
| DOB NOW | Structural | Signed-off | SDC LLC | 06/06/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | REIS EY, INC | 06/02/2025 |
| DOB NOW | General Construction | Signed-off | SDC LLC | 05/23/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/19/2026 | Permit Issued | LTB MECHANICAL CORP | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric PUY-AK36NL 36,000 BTU · Condensing Unit ×1 |
| 05/07/2026 | Permit Issued | SILVERLINING INTERIORS | Others, Ventilation Systems | Ventilation Iec CPY-04 386 CFM · Fan Coil Indoor ×1 CPY-06 481 CFM · Fan Coil Indoor ×1 CPY-08 600 CFM · Fan Coil Indoor ×1 CPY-10 757 CFM · Fan Coil Indoor ×1 |
| 03/12/2026 | Permit Issued | JKT CONSTRUCTION INC | Air Conditioning Systems | Cooling Climatemaster MODEL #TC-072 6 tons · Wshp ×3 MODEL #TC-024 2 tons · Wshp ×2 MODEL #TC-018 600 CFM · Wshp ×1 MODEL #TC-096 8 tons · Wshp ×1 MODEL# TC-096 8 tons · Wshp ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2026 | Permit Issued | KG SPRINKLER CORP | Sprinkler System |
| 05/19/2026 | Permit Issued | KG SPRINKLER CORP | Sprinkler System |
| 05/07/2026 | — | — | 24 heads |
| 03/11/2026 | Permit Issued | METRO FIRE PROT HLDG CORP | 161 heads |
| 07/23/2025 | Permit Issued | KG SPRINKLER CORP | Sprinkler System |
| 01/30/2023 | Permit Issued | KG SPRINKLER CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2026 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 05/19/2026 | Permit Issued | DONATO PLUMBING, INC | Gas, Storm, Water/Sanitary |
| 05/07/2026 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 03/11/2026 | Permit Issued | A PLUS PLUMBING CORP | Water/Sanitary |
| 07/23/2025 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 05/27/2025 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 05/08/2025 | Signed-off | DONATO PLUMBING, INC | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/18/2026 | Permit Issued | ECO ELECTRICAL SERVCS LLC | — |
| 03/10/2026 | Permit Issued | JANON ELECTRIC CORP | General Wiring |
| 07/09/2025 | Permit Issued | EMPIRE STATE ELECTL CORP | — |
| 07/09/2025 | Permit Issued | EMPIRE STATE ELECTL CORP | General Wiring |
| 06/19/2025 | Complete | BIGMAN BROS., INC. | General Wiring, Lighting |
| 06/12/2025 | Complete | APOLLO ELECTRIC INC. | General Wiring |
| 05/08/2025 | Permit Issued | APOLLO ELECTRIC INC. | — |
| 04/04/2025 | Complete | APS ELECTRIC INC | General Wiring |
| 07/12/2024 | Permit Issued | WARREN OSTROFF ELEC., INC | General Wiring |
| 06/10/2024 | Permit Issued | WARREN OSTROFF ELEC., INC | — |
| 05/24/2024 | Permit Issued | WARREN OSTROFF ELEC., INC | General Wiring |
| 05/13/2024 | Permit Issued | WARREN OSTROFF ELEC., INC | — |
| 02/14/2024 | Complete | KONSKER ELECTRIC CORP. | General Wiring |
| 11/02/2023 | Complete | OPTIMAL ELECTRIC, INC | General Wiring |
| 10/31/2023 | Complete | DAL ELECTRICAL CORP. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/19/2026 | Permit Issued | LTB MECHANICAL CORP | Steel, Concrete |
| 07/23/2025 | Permit Issued | NORWOOD DESIGN& BUILD INC | Steel, Concrete |
| 05/08/2025 | Signed-off | SDC LLC | 1 scope_items |
| 07/28/2022 | Permit Issued | SHAWMUT WOODWORKING & SUP | 2 scope_items |
| 03/15/2022 | Permit Issued | SHAWMUT WOODWORKING & SUP | Steel, Concrete |
| 01/21/2022 | — | — | Steel, Concrete |
| 01/05/2022 | — | — | Steel, Concrete |
| 12/13/2021 | — | — | Steel |
| 11/19/2021 | — | — | Steel, Masonry |
| — | — | — | Steel, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/21/2019 | — | — | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/13/2025 | Permit Issued | SKYLINE ACCESS LLC | — |
| 12/15/2023 | Permit Issued | STRUCTUAL PRESV SYSTEM | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/21/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/19/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/07/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/03/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/27/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 07/24/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 07/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/23/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/22/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/11/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/28/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/14/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/05/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/04/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/04/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/15/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/08/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/31/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/18/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/12/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/11/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/10/2026 | Post-installed Anchors | Young Suh | special |
| 08/10/2026 | Sprinkler Systems | Young Suh | special |
| 08/10/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 07/22/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 07/22/2026 | Post-installed Anchors | Young Suh | special |
| 07/22/2026 | Final | Young Suh | progress |
| 07/22/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 07/22/2026 | Sprinkler Systems | Young Suh | special |
| 05/08/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 05/08/2026 | Chimneys and vents | EUGENE BIFULCO | special |
| 05/08/2026 | Mechanical Systems | EUGENE BIFULCO | special |
| 05/08/2026 | Final | EUGENE BIFULCO | progress |
| 05/07/2026 | Chimneys and vents | EUGENE BIFULCO | special |
| 05/07/2026 | Final | EUGENE BIFULCO | progress |
| 05/07/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 05/07/2026 | Mechanical Systems | EUGENE BIFULCO | special |
| 05/06/2026 | Metering | Alex Schwartz | energy_progress |
| 05/06/2026 | Permanent certificate | Alex Schwartz | energy_progress |
| 05/06/2026 | Energy Code Compliance Inspections | Alex Schwartz | progress |
| 04/23/2026 | Mechanical Systems | Young Suh | special |
| 04/23/2026 | Final | Young Suh | progress |
| 04/13/2026 | Structural Steel - Details | — | special |
| 04/13/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 04/13/2026 | Concrete - Cast-In-Place | — | special |
| 04/13/2026 | Post-installed Anchors | — | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Fifth Avenue Fine Jewelry | Retail | Cellar, Ground, Floor 1, Mezzanine | Project M00996486 Project M08029746 |
| Chanel Fifth Avenue Fine Jewelry | Retail | Cellar, Floor 1 | Project M00834662 |
| Aman | Residential | Floor 21 | Project M00815394 |
| Chopard | Retail | Cellar, Floors 1–5, Mezzanine | Project M00755550 Project M00530918 Project M00532604 Project M00437232 Project M00437296 Project M00437378 Project M00446566 Project M00448251 |
| Mikimoto | Retail | Cellar, Floors 1–3, Mezzanine | Project M00460902 Project M00460991 Project M00461329 Project M00461374 Project M00461582 Project M00339467 Project M00339484 Project M00339478 Project M00312393 |
| C-Town Supermarket | Retail | Cellar, Floors 1, 2 | Project M00339164 |