J.h.s. 259 William Mckinley
7305 FORT HAMILTON PARKWAY · Dyker Heights · BIN 3148031
💬 Discuss this project
1935Year Built
4Stories
W1Building Class
R5BZoning
175,500 sfGross Floor Area
1Units
LL97 Covered3 Active Violations 0 unresolved · 3 paperwork only 12 likely answered 2 old, status unconfirmed ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 89,684 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSupplemental cooling systems for 3rd and 4th floor gymnasium1 filing · 4 docs
Floor 4New York City Public School11p · 3 filings · 20 docs
Floor 3New York City Public School7p · 4 filings · 19 docs
Floor 2Plumbing work for eye wash7p · 1 filing · 20 docs
Floor 1Plumbing work for eye wash7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority14304/09/2026
NYC Department of Education203/22/2026
New York City Public School103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Strategic Design Architects303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arora ConstructionGeneral Contractor804/09/2026
Charan Electrical Enterp'sElectrical103/22/2026
Falcon Electrical ContractingElectrical103/22/2026
A & S ElectricElectrical103/22/2026
Pacific Electrical ContractingElectrical103/22/2026
A&H Express Plumbing & HeatingPlumbing107/08/2026
Gemini Electric CoElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins400101/30/2026
Twin Peaks317505/22/2025
JPC Logistics Dba JPCL EN351110/26/2023
Building Lifecycle
All (128)Filed (14)Permit Issued (5)Violation (60)Inspection (2)Objection (17)Special Inspection (30)
05/11/2026
Violation issued (ECB, open)
Construction
02/23/2026
Objection resolved — Addressed
02/12/2026
Objection raised — Other
01/30/2026
Filed — Alteration
RENOVATE EXISTING LIBRARY ROOM 315 - REPLACE EXISTING SUSPENDED CEILING - REPLACE LIGHTING FIXTURES - NO CHANGE IN USE - NO CHANGE IN OCCUPANCY - NO CHANGE IN EGRESS - NO CHANGE IN VENTILATION
B01350817-I1
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
01/23/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
01/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
NELSON LOPEZ
01/23/2026
Special inspection requirement — Lighting controls
NELSON LOPEZ
01/23/2026
Special inspection requirement — Maintenance information
NELSON LOPEZ
01/23/2026
Special inspection requirement — Interior lighting power
NELSON LOPEZ
01/12/2026
Violation issued (FDNY_NOV, closed)
07/16/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/01/2025
Objection resolved — Addressed
06/08/2025
Objection raised — Other
06/06/2025
Violation issued (ECB, open)
Construction
06/06/2025
Violation issued (ECB, closed)
Construction
05/22/2025
Filed — Alteration
REPLACE EXISTING SINKS, ACID NEUTRALIZATION CANISTER, FAUCETS, VALVES AND ASSOCIATED PIPING IN LABS #434, #436 & #438. REMOVE AND CAP GAS PIPING AND ASSOCIATED VALVES IN LABS #434 & #438 UP TO BASEMENT.
B00896797-P8
05/21/2025
Objection resolved — Addressed
05/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
05/19/2025
Objection raised — Admin
05/13/2025
Permit issued — General Construction
B00896797-S1-GC
05/13/2025
Permit issued — General Construction
B00896797-S3-GC
05/12/2025
Filed — Alteration
Installation of supplemental cooling in third and fourth floor Gymnasiums with wall mounted evaporators and condensers.
B01211666-I1
04/16/2025
Special inspection requirement — Mechanical Systems
04/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
04/16/2025
Special inspection requirement — Final
04/16/2025
Special inspection requirement — Post-installed Anchors
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/16/2025
Special inspection requirement — Maintenance information
04/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
04/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
08/28/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/23/2024
Filed — Alteration
REPLACE EXISTING SINKS, ACID NEUTRALIZATION CANISTER, FAUCETS, VALVES AND ASSOCIATED PIPING IN LABS #434, #436 & #438. REMOVE AND CAP GAS PIPING AND ASSOCIATED VALVES IN LABS #434 & #438 UP TO BASEMENT.
B00896797-P7
07/22/2024
Permit issued — General Construction
B00896797-S3-GC
07/22/2024
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
07/22/2024
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
07/22/2024
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
07/11/2024
Permit issued — Plumbing
B00896797-I1-PL
06/26/2024
Permit issued — General Construction
B00896797-S1-GC
06/25/2024
Filed — Alteration
REPLACE EXISTING SINKS, ACID NEUTRALIZATION CANISTER, FAUCETS, VALVES AND ASSOCIATED PIPING IN LABS #434, #436 & #438. REMOVE AND CAP GAS PIPING AND ASSOCIATED VALVES IN LABS #434 & #438 UP TO BASEMENT.
B00896797-P5
06/25/2024
Filed — Alteration
REPLACE EXISTING SINKS, ACID NEUTRALIZATION CANISTER, FAUCETS, VALVES AND ASSOCIATED PIPING IN LABS #434, #436 & #438. REMOVE AND CAP GAS PIPING AND ASSOCIATED VALVES IN LABS #434 & #438 UP TO BASEMENT.
B00896797-P4
06/25/2024
Filed — Alteration
REPLACE EXISTING SINKS, ACID NEUTRALIZATION CANISTER, FAUCETS, VALVES AND ASSOCIATED PIPING IN LABS #434, #436 & #438. REMOVE AND CAP GAS PIPING AND ASSOCIATED VALVES IN LABS #434 & #438 UP TO BASEMENT.
B00896797-P6
06/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
06/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
06/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
06/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
06/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
03/12/2024
Violation issued (FDNY_NOV, closed)
11/13/2023
Objection resolved — Addressed
11/13/2023
Objection resolved — Addressed
11/13/2023
Objection resolved — Addressed
11/09/2023
Objection raised — Other
11/09/2023
Objection raised — Other
11/09/2023
Objection raised — Other
11/08/2023
Objection raised — Other
11/03/2023
Filed — Alteration
REPLACE EXISTING SINKS, ACID NEUTRALIZATION CANISTER, FAUCETS, VALVES AND ASSOCIATED PIPING IN LABS #434, #436 & #438. REMOVE AND CAP GAS PIPING AND ASSOCIATED VALVES IN LABS #434 & #438 UP TO BASEMENT.
B00896797-P3
11/03/2023
Filed — Alteration
REPLACE EXISTING SINKS, ACID NEUTRALIZATION CANISTER, FAUCETS, VALVES AND ASSOCIATED PIPING IN LABS #434, #436 & #438. REMOVE AND CAP GAS PIPING AND ASSOCIATED VALVES IN LABS #434 & #438 UP TO BASEMENT.
B00896797-P2
11/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedArora Construction05/13/2025
DOB NOWGeneral ConstructionPermit IssuedArora Construction05/13/2025
DOB NOWGeneral ConstructionPermit IssuedArora Construction07/22/2024
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating07/11/2024
DOB NOWGeneral ConstructionPermit IssuedArora Construction06/26/2024
BISOTISSUEDUniversal Construction RE05/03/2024
BISMHISSUEDACS System Associates04/24/2024
BISMHISSUEDACS System Associates04/10/2024
BISPLISSUEDForsythe P&H04/03/2024
BISMHISSUEDIndependent Temperature03/25/2024
BISMHISSUEDIndependent Temperature03/25/2024
BISOTISSUEDIndependent Temperature03/25/2024
BISOTISSUEDIndependent Temperature03/25/2024
BISOTISSUEDIndependent Temperature03/25/2024
BISMHISSUEDACS System Associates04/26/2023
BISPLISSUEDForsythe P&H03/24/2023
BISOTISSUEDIndependent Temperature03/24/2023
BISOTISSUEDIndependent Temperature03/24/2023
BISMHISSUEDIndependent Temperature03/24/2023
BISOTISSUEDIndependent Temperature03/24/2023
BISMHISSUEDIndependent Temperature03/24/2023
BISBLISSUEDForsythe P&H05/24/2022
BISBLISSUEDForsythe P&H05/13/2022
BISMHISSUEDACS System Associates05/09/2022
BISPLISSUEDForsythe P&H03/29/2022
BISMHISSUEDIndependent Temperature03/28/2022
BISOTISSUEDIndependent Temperature03/28/2022
BISOTISSUEDIndependent Temperature03/28/2022
BISOTRE-ISSUEDIndependent Temperature03/28/2022
BISOTRE-ISSUEDIndependent Temperature03/28/2022
BISPLISSUEDForsythe P&H04/07/2021
BISOTISSUEDIndependent Temperature03/24/2021
BISOTISSUEDIndependent Temperature03/24/2021
BISOTISSUEDIndependent Temperature03/24/2021
BISOTISSUEDIndependent Temperature03/24/2021
BISMHISSUEDIndependent Temperature03/24/2021
BISOTISSUEDUniversal Construction RE03/10/2021
BISEQISSUEDIndependent Temperature01/14/2021
BISEQISSUEDIndependent Temperature06/08/2020
BISMHISSUEDACS System Associates06/02/2020
+ 15 more permits on file
2 projects · most recent 05/12/2025
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/12/2025——Air Conditioning Systems
Cooling
Fujitsu ASUB36TLAV-1 36,000 BTU · Fan Coil Indoor ×18
Fujitsu AOU120RLAVL 120,000 BTU · Condensing Unit ×6
10/26/2023——Heating and Air Conditioning Systems
Heat / Cool
Fujitsu ASUB36TLAV1 34,000 BTU · Fan Coil Indoor ×18
AOU120RLAVL 120,000 BTU · Condensing Unit ×6
1 project · most recent 05/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/22/2025Permit IssuedA&H Express Plumbing & HeatingGas, Water/Sanitary
17 projects · most recent 06/25/2025
General Wiring
FiledStatusContractorScope
06/25/2025CompleteEverest Electric—
06/20/2025CompleteEverest Electric—
06/18/2024Permit IssuedA & S ElectricGeneral Wiring
06/18/2024CompleteMNBC ElectricalGeneral Wiring
05/15/2023CompleteCharan Electrical Enterp's—
05/12/2023CompleteGemini Electric Co—
04/24/2023CompleteGemini Electric Co—
04/13/2023Permit IssuedA & S ElectricGeneral Wiring
09/22/2022Permit IssuedA & S ElectricGeneral Wiring
12/10/2021CompleteAbm Electric—
01/23/2020CompletePacific Electrical ContractingGeneral Wiring
08/07/2019Permit IssuedA & S ElectricGeneral Wiring
06/03/2019CompleteCharan Electrical Enterp's—
11/05/2018CompleteCharan Electrical Enterp'sGeneral Wiring
05/30/2018CompleteFalcon Electrical Contracting—
1 project · most recent 01/30/2026
FiledStatusContractorScope
01/30/2026——1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/16/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/28/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
01/23/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
01/23/2026Post-installed AnchorsNELSON LOPEZspecial
01/23/2026Energy Code Compliance InspectionsNELSON LOPEZprogress
01/23/2026Fire-Resistance Rated ConstructionNELSON LOPEZprogress
01/23/2026Lighting controlsNELSON LOPEZenergy_progress
01/23/2026Maintenance informationNELSON LOPEZenergy_progress
01/23/2026Interior lighting powerNELSON LOPEZenergy_progress
05/21/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
04/16/2025Mechanical Systems—special
04/16/2025HVAC-R and service water heating system controls—energy_progress
04/16/2025Energy Code Compliance Inspections—progress
04/16/2025Final—progress
04/16/2025Post-installed Anchors—special
04/16/2025Fire-Resistant Penetrations and Joints—special
04/16/2025Maintenance information—energy_progress
04/16/2025HVAC-R and service water piping design and insulation—energy_progress
04/16/2025HVAC-R and service water heating equipment—energy_progress
07/22/2024Interior lighting powerMIKHAIL ZEYGMANenergy_progress
07/22/2024Lighting controlsMIKHAIL ZEYGMANenergy_progress
07/22/2024Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
06/25/2024Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
06/25/2024Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
06/24/2024Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
06/24/2024Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
06/24/2024Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
Latest 25 of 40.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New York City Public SchoolEducationFloors 3, 4
Project B01211666 Alteration · Approved · 05/12/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/26/2026B00953882-I1Request digital key ↗
08/24/2026B00896797-P4Request digital key ↗
08/24/2026B00896797-P5Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
11/27/2009320095990Open ↗
09/05/2008310017969Open ↗
09/11/2007310017969Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/24/2026B00896797-P3Open ↗
08/24/2026B00896797-P4Open ↗
08/24/2026B00896797-P5Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/29/2026B00896797-P6Open ↗
09/19/2026B00896797-P7Open ↗
09/19/2026B00896797-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/29/2026B00896797-P6Open ↗
08/27/2026B00896797-P8Open ↗
08/26/2026B00896797-P4Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/27/2009320095990Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
09/20/2022302573748Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
11/27/2009320095990Open ↗
09/11/2007310017969Open ↗
09/11/2007310017969Open ↗
▸Approvals, Objections & Sign-offs32
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/24/2026B00896797-P4Open ↗
08/24/2026B00896797-P5Open ↗
08/24/2026B00896797-P6Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
08/13/2026B00896797-P4Open ↗
08/13/2026B00896797-P1Open ↗
08/13/2026B01211666-I1Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
11/27/2009320095990Open ↗
09/11/2007310017969Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026B00896797-S3Open ↗
08/13/2026B01350817-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/27/2009320095990Open ↗
▸Filing & Intake Forms4
▸DOB NOWAI1 Form3
08/13/2026B00896797-S1Open ↗
08/13/2026B00896797-P1Open ↗
08/13/2026B00896797-P6Open ↗
▸BISEFILING COVER SHEET1
11/27/2009320095990Open ↗
▸Other Documents13
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal13
08/13/2026B00896797-P7Open ↗
08/13/2026B00896797-S1Open ↗
08/13/2026B00896797-S3Open ↗
Showing 3 of 13 on file for this type