← Back
BuildNYC
BROOKLYN
749 53RD STREET
BROOKLYN · BIN 3430477
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
2 Active Violations ▸
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction139p · 1 filing · 20 docs
BulkheadUnder Construction5p · 1 filing · 20 docs
Floor 4Under Construction137p · 1 filing · 20 docs
Floor 3Under Construction140p · 1 filing · 20 docs
Floor 2Under Construction140p · 1 filing · 20 docs
Floor 1Heavy duty sidewalk shed installationUnder Construction197p · 2 filings · 20 docs
CellarUnder Construction134p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shedUnder Construction133p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Safe-Shield Enterprises106/02/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Associates1001/22/2026
Ashraf107/02/2025
Just Consulting Engineering107/26/2022
Mohammad Ahead, PE103/07/2022
5D Architecture & Engineering106/01/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynamic Plumbing & SprinklerFire Protection209/30/2026
Safe-Sheild EnterpriseScaffold106/02/2026
Rock E Small Plumbing & HeatingPlumbing106/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD Testing & Inspection S7010901/22/2026
Building Lifecycle
All (101)Filed (12)Permit Issued (21)Signed Off (5)Violation (3)Inspection (8)Objection (22)Special Inspection (30)
10/12/2026
Permit issued — Plumbing
B00626808-S2-EW-SP
09/29/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
09/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/10/2026
Signed off — New Building
Plumbing and Sprinkler job in-conjunction with New Building
B00626808-S1
04/08/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/26/2026
Signed off — Alteration
B00766592-I1
03/26/2026
Permit issued — Structural
B00626808-I1-MS
03/03/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/03/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/10/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/02/2026
Signed off — Alteration
B01250780-I1
01/24/2026
Violation issued (ECB, closed)
Construction
01/23/2026
Permit issued — Curb Cut
B00626808-S1-CC
01/23/2026
Special inspection requirement — Final
XIUCHENG LI
01/23/2026
Special inspection requirement — Protection of exposed foundation insulation
XIUCHENG LI
01/23/2026
Special inspection requirement — Masonry
XIUCHENG LI
01/23/2026
Special inspection requirement — Concrete - Cast-In-Place
XIUCHENG LI
01/23/2026
Special inspection requirement — Fenestration areas
XIUCHENG LI
01/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
01/23/2026
Special inspection requirement — Shutoff dampers
XIUCHENG LI
01/23/2026
Special inspection requirement — Mechanical Systems
XIUCHENG LI
01/23/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
XIUCHENG LI
01/23/2026
Special inspection requirement — Smoke Control Systems Testing
XIUCHENG LI
01/23/2026
Special inspection requirement — Preliminary
XIUCHENG LI
01/23/2026
Special inspection requirement — Air barrier - visual inspection
XIUCHENG LI
01/23/2026
Special inspection requirement — Air barrier — testing
XIUCHENG LI
01/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
01/23/2026
Special inspection requirement — Structural Cold-Formed Steel
XIUCHENG LI
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
01/23/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIUCHENG LI
01/23/2026
Special inspection requirement — Subgrade Inspections
XIUCHENG LI
01/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
XIUCHENG LI
01/23/2026
Special inspection requirement — Post-installed Anchors
XIUCHENG LI
01/23/2026
Special inspection requirement — Heating Systems
XIUCHENG LI
01/23/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIUCHENG LI
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
01/23/2026
Special inspection requirement — Footing and Foundation
XIUCHENG LI
01/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
01/23/2026
Special inspection requirement — Insulation placement and R values
XIUCHENG LI
01/23/2026
Special inspection requirement — Metering
XIUCHENG LI
01/23/2026
Special inspection requirement — Maintenance information
XIUCHENG LI
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
01/23/2026
Special inspection requirement — Interior lighting power
XIUCHENG LI
01/22/2026
Filed — New Building
Plumbing and Sprinkler job in-conjunction with New Building
B00626808-P6
01/07/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
01/05/2026
Objection raised — Scope
12/29/2025
Objection raised — Scope
12/29/2025
Objection resolved — Addressed
12/29/2025
Objection raised — Scope
12/24/2025
Filed — New Building
Plumbing and Sprinkler job in-conjunction with New Building
B00626808-P2
12/23/2025
Filed — New Building
Plumbing and Sprinkler job in-conjunction with New Building
B00626808-P3
11/18/2025
Permit issued — Sprinklers
B00626808-S2-EW-SP
10/09/2025
Permit issued — Earth Work
B00626808-I1-GC-CX
07/07/2025
Permit issued — Plumbing
B00626808-S2-PL
07/07/2025
Permit issued — Sidewalk Shed
B01250780-I1-SH
07/02/2025
Filed — Alteration
B01250780-I1
06/06/2025
Permit issued — Construction Fence
B00766592-I1-FN
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDynamic Plumbing & Sprinkler10/12/2026
DOB NOWStructuralPermit IssuedJJK Building Consulting03/26/2026
DOB NOWCurb CutSigned-offJJK Building Consulting01/23/2026
DOB NOWSprinklersSigned-offCitywide Plumbing, Heating & Sprinkler11/18/2025
DOB NOWEarth WorkPermit IssuedJJK Building Consulting10/09/2025
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating07/07/2025
DOB NOWSidewalk ShedSigned-offSafe-Sheild Enterprise07/07/2025
DOB NOWConstruction FenceSigned-offJJK Building Consulting06/06/2025
DOB NOWSupport of ExcavationPermit IssuedJJK Building Consulting12/19/2024
DOB NOWSupport of ExcavationPermit IssuedJJK Building Consulting10/15/2024
DOB NOWEarth WorkPermit IssuedJJK Building Consulting10/15/2024
DOB NOWConstruction FenceSigned-offJJK Building Consulting05/07/2024
DOB NOWGeneral ConstructionPermit IssuedJJK Building Consulting11/13/2023
DOB NOWSupport of ExcavationPermit IssuedJJK Building Consulting11/02/2023
DOB NOWSupport of ExcavationPermit IssuedJJK Building Consulting05/11/2023
DOB NOWGeneral ConstructionPermit IssuedJJK Building Consulting05/10/2023
DOB NOWConstruction FenceSigned-offJJK Building Consulting05/04/2023
DOB NOWConstruction FenceSigned-offSplen Construction07/27/2022
DOB NOWSidewalk ShedSigned-offJasco03/08/2022
DOB NOWConstruction FenceSigned-offJJK Building Consulting10/25/2021
DOB NOWConstruction FenceSigned-offJJK Building Consulting06/03/2021
1 project · most recent 01/22/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/22/2026Permit IssuedJJK Building ConsultingAir Conditioning Systems, Heating Systems
Cooling
Gree LIV12HP230V1R32AH 12,000 BTU · Split System ×145
MUL30HP230V1R32AO 30,000 BTU · Condensing Unit ×60
Mitsubishi Electric SEZ-KD12NA4R1.TH 13,600 BTU · Split System ×31
MXZ-4C36NAHZ 45,000 BTU · Condensing Unit ×10
Heating
A.O. Smith GDV-50 100,000 BTU · Water Heater ×60
1 project · most recent 01/22/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/22/2026Signed-offRock E Small Plumbing & HeatingStorm, Water/Sanitary
3 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026CompleteAL-Lectric Elect'l ContractingGeneral Wiring
06/30/2025CompleteAL-Lectric Elect'l Contracting—
03/11/2022Permit IssuedRichard Neu—
1 project · most recent 01/22/2026
Concrete
FiledStatusContractorScope
01/22/2026Signed-offThe Plumbing and SprinklerConcrete
1 project · most recent 01/22/2026
Earthwork
FiledStatusContractorScope
01/22/2026Signed-offThe Plumbing and SprinklerEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/29/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
09/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/08/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/03/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/03/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/03/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/10/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
01/23/2026Lighting controlsXIUCHENG LIenergy_progress
01/23/2026Fenestration and door U-factor and product ratingsXIUCHENG LIenergy_progress
01/23/2026Fenestration air leakageXIUCHENG LIenergy_progress
01/23/2026Exterior lighting powerXIUCHENG LIenergy_progress
01/23/2026Interior lighting powerXIUCHENG LIenergy_progress
01/23/2026Protection of exposed foundation insulationXIUCHENG LIenergy_progress
01/23/2026HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
01/23/2026HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
01/23/2026HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
01/23/2026Lighting in dwelling unitsXIUCHENG LIenergy_progress
01/23/2026Air barrier — testing XIUCHENG LIenergy_progress
01/23/2026Maintenance informationXIUCHENG LIenergy_progress
01/23/2026MeteringXIUCHENG LIenergy_progress
01/23/2026Fenestration areasXIUCHENG LIenergy_progress
01/23/2026Air barrier - visual inspectionXIUCHENG LIenergy_progress
01/23/2026Insulation placement and R valuesXIUCHENG LIenergy_progress
01/23/2026Fire-Resistance Rated ConstructionXIUCHENG LIprogress
01/23/2026PreliminaryXIUCHENG LIprogress
01/23/2026Footing and FoundationXIUCHENG LIprogress
01/23/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
01/23/2026FinalXIUCHENG LIprogress
01/23/2026Concrete - Cast-In-PlaceXIUCHENG LIspecial
01/23/2026Smoke Control Systems TestingXIUCHENG LIspecial
01/23/2026Excavations - Sheeting, Shoring, and BracingXIUCHENG LIspecial
01/23/2026Heating SystemsXIUCHENG LIspecial
Latest 25 of 150.
▾Documents — 253 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/01/2026B00503032-I1Request digital key ↗
08/31/2026B00691795-I1Request digital key ↗
08/29/2026B00766592-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZoning Exhibit form (1-5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/23/2026B00626808-I1Open ↗
▸Seals & Professional Certifications195
▸DOB NOWProgress Inspector Seal & Signature112
09/02/2026B00626808-I1Open ↗
09/02/2026B00626808-I1Open ↗
09/02/2026B00626808-I1Open ↗
Showing 3 of 112 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature69
09/02/2026B00626808-I1Open ↗
09/02/2026B00626808-I1Open ↗
09/02/2026B00626808-I1Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/29/2026B00766592-I1Open ↗
08/23/2026B00626808-P5Open ↗
08/23/2026B00626808-P2Open ↗
Showing 3 of 14 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist6
08/23/2026B00626808-P4Open ↗
08/23/2026B00626808-P1Open ↗
08/23/2026B00626808-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/23/2026B00626808-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/23/2026B00626808-I1Open ↗
▸Other Documents16
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/23/2026B00626808-P5Open ↗
08/23/2026B00626808-P4Open ↗
08/23/2026B00626808-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFinal Survey1
08/23/2026B00626808-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type