← Back
QUEENS
75-05 DOUGLASTON PARKWAY
QUEENS · BIN 4557769
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
3 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof8p · 3 filings · 20 docs
Floor 24p · 1 filing · 16 docs
Floor 15p · 1 filing · 16 docs
Cellar5p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEPARTMENT OF DESIGN CONSTRUCTION3107/08/2026
NYC DEPARTMENT OF SANITATION1107/08/2026
DISTRICT 13203/22/2026
NYC DEPT OF DESIGN CONSTRUCTIO703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC105/08/2024
WALTER T. GORMAN, P.E., P.C.111/22/2023
SHL ENGINEERING P.C.211/25/2022
AECOM406/08/2022
RLM ENGINEERING PLLC505/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
P WOLFE CONSULTANTS803/21/2026
WALTER T GORMAN PE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE FRANKLIN COMANY CONT*General Contractor1007/08/2026
RICHARDS P AND H CO, INCPlumbing407/08/2026
GEMSTAR CONSTRUCTION CORP.General Contractor307/08/2026
P & M ELECT'L CONTR. CORPElectrical103/22/2026
BOILERMATIC WELDING INDUSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746105/08/2024
TECTONIC ENGINEERING CONS106511/22/2023
SHL ENGINEERING, P.C.6109111/25/2022
RLM ENGINEERING PLLC6913505/19/2022
Building Lifecycle
All (86)Filed (13)Permit Issued (16)Signed Off (10)Violation (3)Inspection (10)Objection (4)Special Inspection (30)
12/04/2025
Violation issued (ECB, open)
Construction
12/04/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/10/2025
Violation issued (ECB, open)
Construction
01/22/2025
Signed off — Alteration
Q00742626-I1
11/26/2024
Signed off — Alteration
ALLEY POND COMFORT STATION: EMPTY PURGE, CLEAN, & DISPOSE OF ONE (1) 1,0800-GALON UST & ASSOCIATED PIPING & LEAK DETECTION SYSTEM COMPONENTS. INSTALL ONE (1) 1,000-GALON B5/B20 BIOFUEL UST, & ALL ASSOCIATED PIPING AND LEAK DETECTION SYSTEM.
Q00745516-I1
11/26/2024
Signed off — Alteration
Q00745526-I1
11/21/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/23/2024
Signed off — Alteration
Q00734423-I1
08/19/2024
Signed off — Alteration
INSTALLATION OF OIL-FIRED HVAC UNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01041524-I1
08/11/2024
Permit issued — General Construction
Q00734423-I1-ST
08/09/2024
Permit issued — Structural
Q00734423-I1-GC
08/01/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/28/2024
Permit issued — Mechanical Systems
Q01041524-I1-MS
05/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
05/08/2024
Filed — Alteration
INSTALLATION OF OIL-FIRED HVAC UNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01041524-I1
05/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
05/08/2024
Special inspection requirement — Maintenance information
Stephen Shishko
05/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
05/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
04/25/2024
Special inspection requirement — Final
Stephen Shishko
04/25/2024
Special inspection requirement — Mechanical Systems
Stephen Shishko
01/24/2024
Signed off — Alteration
Propose to file for support of excavation. No change to use, egress or occupancy.
Q00965415-I1
01/09/2024
Permit issued — Boiler Equipment
Q00745526-I1-BE
12/06/2023
Permit issued — Support of Excavation
Q00965415-I1-SE
11/22/2023
Filed — Alteration
Propose to file for support of excavation. No change to use, egress or occupancy.
Q00965415-I1
11/21/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
11/21/2023
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
10/06/2023
Permit issued — General Construction
Q00745516-I1-GC-CX
04/21/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/18/2023
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q08036741-I1
03/18/2023
Signed off — Alteration
SUPPORT OF EXCAVATON AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY - ALLEY POND NATURE BUILDING
Q08042457-I1
02/13/2023
Permit issued — Boiler Equipment
Q00742626-I1-BE
01/13/2023
Permit issued — Construction Fence
Q08036741-I1-FN
01/13/2023
Permit issued — Support of Excavation
Q08042457-I1-SE
01/09/2023
Permit issued — General Construction
Q00734423-I1-GC
12/28/2022
Permit issued — General Construction
Q00734423-I1-GC
11/30/2022
Objection raised — Other
11/30/2022
Objection resolved — Addressed
11/25/2022
Filed — Alteration
SUPPORT OF EXCAVATON AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY - ALLEY POND NATURE BUILDING
Q08042457-I1
11/18/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
STEPHEN LAWNICZAK
11/18/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
STEPHEN LAWNICZAK
11/18/2022
Special inspection requirement — Subgrade Inspections
STEPHEN LAWNICZAK
11/15/2022
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q08036741-I1
08/30/2022
Signed off — Alteration
Q00594772-I1
08/16/2022
Signed off — Alteration
Filing for the installation of two new exhaust fans on the roof and breeching in the cellar, and one combustion intake fan in the boiler room to two boilers & one hot water heater in cellar as per plans filed herewith.
Q00624476-I1
06/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/13/2022
Objection raised — Admin
06/13/2022
Objection resolved — Addressed
06/08/2022
Filed — Alteration
ALLEY POND COMFORT STATION: EMPTY PURGE, CLEAN, & DISPOSE OF ONE (1) 1,0800-GALON UST & ASSOCIATED PIPING & LEAK DETECTION SYSTEM COMPONENTS. INSTALL ONE (1) 1,000-GALON B5/B20 BIOFUEL UST, & ALL ASSOCIATED PIPING AND LEAK DETECTION SYSTEM.
Q00745516-I1
06/08/2022
Filed — Alteration
Q00734423-I1
06/07/2022
Filed — Alteration
Q00742626-I1
06/07/2022
Filed — Alteration
Q00745526-I1
05/25/2022
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
05/25/2022
Special inspection requirement — Final
GEORGE GHEBRYAL
05/25/2022
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
05/25/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
GEORGE GHEBRYAL
05/25/2022
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
05/20/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
GEORGE GHEBRYAL
05/19/2022
Filed — Alteration
Replacing existing gas piping to new hot water heating boiler filed under Q00594772 in the cellar and replacing existing gas piping from cellar to roof as per plans filed herewith.
Q00594767-P2
05/09/2022
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTHE FRANKLIN COMANY CONT*08/11/2024
DOB NOWStructuralSigned-offTHE FRANKLIN COMANY CONT*08/09/2024
DOB NOWMechanical SystemsSigned-offTHE FRANKLIN COMANY CONT*05/28/2024
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING01/09/2024
DOB NOWSupport of ExcavationSigned-offGEMSTAR CONSTRUCTION CORP.12/06/2023
DOB NOWGeneral ConstructionSigned-offGEMSTAR CONSTRUCTION CORP.10/06/2023
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING02/13/2023
DOB NOWConstruction FenceSigned-offTHE FRANKLIN COMANY CONT*01/13/2023
DOB NOWSupport of ExcavationSigned-offTHE FRANKLIN COMANY CONT*01/13/2023
DOB NOWGeneral ConstructionSigned-offTHE FRANKLIN COMANY CONT*01/09/2023
DOB NOWGeneral ConstructionSigned-offTHE FRANKLIN COMANY CONT*12/28/2022
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC03/29/2022
DOB NOWBoiler EquipmentSigned-offRICHARDS P AND H CO, INC03/28/2022
DOB NOWBoiler EquipmentSigned-offRICHARDS P AND H CO, INC03/09/2022
DOB NOWMechanical SystemsSigned-offBOILERMATIC WELDING INDUS01/05/2022
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC09/30/2021
BISOTISSUEDPAPITTO CONSTRUCTION CO I07/28/2011
BISOTISSUEDPAPITTO CONSTRUCTION CO I06/14/2011
BISOTISSUEDGLASS ARMOR OF NEW YORK I03/21/2007
1 project · most recent 05/19/2022
Gas
FiledStatusContractorScope
05/19/2022Permit IssuedRICHARDS P AND H CO, INCGas
2 projects · most recent 02/13/2025
General Wiring
FiledStatusContractorScope
02/13/2025CompleteP & M ELECT'L CONTR. CORPGeneral Wiring
03/06/2023CompleteTHE FRANKLIN CO. CONT.INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/21/2024Pass-Final Boiler Equipment InspectionPassView ↗
08/01/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/21/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/27/2022Pass-Final Boiler Equipment InspectionPassView ↗
04/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/08/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/01/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/20/2021Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
05/28/2024HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
05/08/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
05/08/2024Maintenance informationStephen Shishkoenergy_progress
05/08/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
05/08/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
04/25/2024FinalStephen Shishkoprogress
04/25/2024Mechanical SystemsStephen Shishkospecial
11/21/2023Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
11/21/2023Subgrade InspectionsGEORGE GHEBRYALspecial
11/18/2022Excavations - Sheeting, Shoring, and BracingSTEPHEN LAWNICZAKspecial
11/18/2022Structural Stability – Alterations of existing buildingsSTEPHEN LAWNICZAKspecial
11/18/2022Subgrade InspectionsSTEPHEN LAWNICZAKspecial
05/25/2022Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
05/25/2022FinalGEORGE GHEBRYALprogress
05/25/2022Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
05/25/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsGEORGE GHEBRYALspecial
05/25/2022Subgrade InspectionsGEORGE GHEBRYALspecial
05/20/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsGEORGE GHEBRYALspecial
05/09/2022Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
05/09/2022Subgrade InspectionsGEORGE GHEBRYALspecial
05/09/2022Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
05/09/2022FinalGEORGE GHEBRYALprogress
05/05/2022Fire-Resistant Penetrations and JointsRonald Merhigespecial
05/05/2022Energy Code Compliance InspectionsRonald Merhigeprogress
11/15/2021Ventilation and air distribution systemRonald Merhigeenergy_progress
Latest 25 of 30.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/27/2026Q00594767-P2Request digital key ↗
08/27/2026Q00594767-P1Request digital key ↗
08/27/2026Q00594767-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
06/07/2011420361888Open ↗
10/04/2010420234794Open ↗
▸BISWORK PERMIT APPLICATION2
08/02/2011420234794Open ↗
06/16/2011420361888Open ↗
▸Seals & Professional Certifications47
▸DOB NOWSpecial Inspector Seal & Signature14
09/30/2026Q00965415-I1Open ↗
09/23/2026Q00745526-I1Open ↗
09/23/2026Q00742626-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026Q00624476-I1Open ↗
09/01/2026Q00624476-I1Open ↗
09/01/2026Q00624476-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026Q00594767-P2Open ↗
08/27/2026Q00594767-P1Open ↗
08/27/2026Q00594767-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/01/2011420234794Open ↗
06/07/2011420361888Open ↗
10/04/2010420234794Open ↗
▸BISProfessional and Owner Certification (POC3)2
06/07/2011420361888Open ↗
06/07/2011420361888Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/07/2011420361888Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/07/2011420361888Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026Q00594767-P2Open ↗
08/27/2026Q00594767-P1Open ↗
08/27/2026Q00594767-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/04/2010420234794Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00624476-I1Open ↗
08/13/2026Q00594772-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
06/07/2011420361888Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00594772-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
08/02/2011420234794Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
08/02/2011420234794Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/26/2026Q00594772-I1Open ↗
08/13/2026Q00965415-I1Open ↗
08/13/2026Q00594767-P1Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
06/07/2011420361888Open ↗
08/06/2010420234794Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026Q00734423-I1Open ↗
08/13/2026Q00745516-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026Q00734423-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/07/2011420361888Open ↗
10/04/2010420234794Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/07/2011420361888Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00965415-I1Open ↗