← Back
One family attached or semi-detached
76-02 PENELOPE AVENUE
QUEENS · Middle Village · BIN 4069659
💬 Discuss this project
1945Year Built
2Stories
A5Building Class
R4BZoning
1,633 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
One family attached or semi-detached · 1,350 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 7 docs
Floor 11p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/22/2020$695K—— → —$426/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAMANN ENGINEERING, PLLC412/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WK RENOVATION CORPGeneral Contractor303/21/2026
SUPERB PLUMBING & HEATINGPlumbing307/08/2026
P & Z ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAMANN ENGINEERING, PLLC4949412/30/2022
Building Lifecycle
All (40)Filed (4)Permit Issued (4)Signed Off (2)Violation (3)Inspection (2)Objection (12)Special Inspection (13)
08/20/2024
Signed off — Alteration
RENOVATION OF 1 FAMILY HOUSE ON THE LEVEL OF THE 1ST FLOOR, INSTALLATION OF THE NEW METAL STAIRS TO THE 2ND FLOOR, INSTALLATION OF THE NEW PARTITIONS IN THE BASEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00663450-I1
08/20/2024
Signed off — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. REPLACE A GAS METER WITH NEW CLASS 250. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00663452-I1
03/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/31/2023
Permit issued — Plumbing
Q00663452-I1-PL
12/30/2022
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. REPLACE A GAS METER WITH NEW CLASS 250. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00663452-P1
12/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
12/05/2022
Objection resolved — Addressed
09/21/2022
Permit issued — Mechanical Systems
Q00663450-I1-GC-CX
07/28/2022
Objection raised — Zoning
07/26/2022
Filed — Alteration
RENOVATION OF 1 FAMILY HOUSE ON THE LEVEL OF THE 1ST FLOOR, INSTALLATION OF THE NEW METAL STAIRS TO THE 2ND FLOOR, INSTALLATION OF THE NEW PARTITIONS IN THE BASEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00663450-P1
06/21/2022
Special inspection requirement — Mechanical Systems
CARL HAMANN
06/21/2022
Special inspection requirement — Energy Code Compliance Inspections
CARL HAMANN
06/21/2022
Special inspection requirement — Final
CARL HAMANN
06/21/2022
Special inspection requirement — Fenestration areas
CARL HAMANN
06/21/2022
Special inspection requirement — Fenestration air leakage
CARL HAMANN
06/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
06/21/2022
Special inspection requirement — Interior lighting power
CARL HAMANN
06/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
CARL HAMANN
06/21/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CARL HAMANN
06/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
06/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
06/21/2022
Special inspection requirement — Air barrier - visual inspection
CARL HAMANN
04/22/2022
Permit issued — Plumbing
Q00663452-I1-PL
04/01/2022
Permit issued — Plumbing
Q00663452-I1-PL
03/30/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2022
Objection raised — Scope
02/28/2022
Objection resolved — Addressed
02/09/2022
Objection raised — Zoning
02/09/2022
Objection resolved — Addressed
02/09/2022
Objection raised — Fire_Protection
02/09/2022
Objection resolved — Addressed
02/09/2022
Objection raised — Other
02/09/2022
Objection resolved — Addressed
02/09/2022
Objection raised — Zoning
02/09/2022
Objection resolved — Addressed
02/03/2022
Filed — Alteration
RENOVATION OF 1 FAMILY HOUSE ON THE LEVEL OF THE 1ST FLOOR, INSTALLATION OF THE NEW METAL STAIRS TO THE 2ND FLOOR, INSTALLATION OF THE NEW PARTITIONS IN THE BASEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00663450-I1
02/03/2022
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. REPLACE A GAS METER WITH NEW CLASS 250. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00663452-I1
01/06/2022
Violation issued (ECB, closed)
Construction
01/06/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSUPERB PLUMBING & HEATING08/31/2023
DOB NOWMechanical SystemsSigned-offWK RENOVATION CORP09/21/2022
DOB NOWPlumbingSigned-offSUPERB PLUMBING & HEATING04/22/2022
DOB NOWPlumbingSigned-offSUPERB PLUMBING & HEATING04/01/2022
1 project · most recent 06/17/2024
General Wiring
FiledStatusContractorScope
06/17/2024CompleteP & Z ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
12/07/2022Fire-Resistant Penetrations and JointsCARL HAMANNspecial
06/21/2022Mechanical SystemsCARL HAMANNspecial
06/21/2022Energy Code Compliance InspectionsCARL HAMANNprogress
06/21/2022FinalCARL HAMANNprogress
06/21/2022Fenestration areasCARL HAMANNenergy_progress
06/21/2022Fenestration air leakageCARL HAMANNenergy_progress
06/21/2022Fire-Resistant Penetrations and JointsCARL HAMANNspecial
06/21/2022Interior lighting powerCARL HAMANNenergy_progress
06/21/2022HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
06/21/2022Fenestration and door U-factor and product ratingsCARL HAMANNenergy_progress
06/21/2022HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
06/21/2022HVAC-R and service water heating equipmentCARL HAMANNenergy_progress
06/21/2022Air barrier - visual inspectionCARL HAMANNenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00663452-P1Request digital key ↗
08/26/2026Q00663452-I1Request digital key ↗
08/15/2026Q00663450-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00663450-I1Open ↗
08/13/2026Q00663452-P1Open ↗
08/13/2026Q00663450-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00663450-P1Open ↗
09/01/2026Q00663450-P1Open ↗
09/01/2026Q00663450-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q00663452-P1Open ↗
09/01/2026Q00663450-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/14/2026Q00663450-I1Open ↗
08/13/2026Q00663452-P1Open ↗
08/13/2026Q00663452-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00663450-I1Open ↗