School or academy
German School Brooklyn
116 ROGERS AVENUE · BIN 3428802
💬 Discuss this project
2022Year Built
4Stories
W3Building Class
R6AZoning
138,029 sfGross Floor Area
0Units
LL97 Covered0 Open ViolationsFDNY Report ↗
School or academy · Owner of record: GERMAN SCHOOL BROOKLYN · 15,660 sf lot · 8.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof36p · 2 filings · 20 docs
Floor 434p · 1 filing · 20 docs
Floor 337p · 2 filings · 20 docs
Floor 238p · 2 filings · 20 docs
Floor 141p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GERMAN SCHOOL BROOKLYN3607/08/2026
NEWGRANGE CONSTRUCTION COMPANY1107/08/2026
ALBA SERVICES INC903/22/2026
CARMEL CHRISTIAN SCHOOL103/21/2026
116-126 ROGERS AVE803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/23/2020$7.1M—Private party → GERMAN SCHOOL BROOKLYN— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO PARALLEL LLC511/16/2022
TAN ENGINEERING PC710/19/2022
KZ ENGINEERING, P.C607/07/2022
ACTIVE DESIGN GROUP ENGINEERING201/20/2021
AWZ ENGINEERING, INC.109/22/2020
ASHRAF CORP106/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS603/21/2026
JMV ASSOCIATES3003/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEWGRANGE CONSTRUCTION COGeneral Contractor1007/08/2026
CS BRIDGE CORPGeneral Contractor507/08/2026
STUDIO PARALLELGeneral Contractor403/22/2026
RAPTOR MECHANICAL,INCPlumbing307/08/2026
ALBA SERVICES INCGeneral Contractor203/21/2026
P & D MECHANICAL CORPFire Protection207/08/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
MP & L METAL INCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAN ENGINEERING, P.C.1291510/19/2022
BUREAU VERITAS NA6902307/02/2020
Building Lifecycle
All (167)Filed (22)Permit Issued (14)Signed Off (7)Violation (12)Inspection (10)Objection (72)Special Inspection (30)
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/2024
Violation issued (FDNY_NOV, closed)
12/18/2023
Violation issued (FDNY_NOV, closed)
09/27/2023
Signed off — Alteration
B00385185-I1
09/27/2023
Signed off — Alteration
B00385184-I1
09/18/2023
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00684170-I1
09/18/2023
Signed off — Alteration
Installation of temporary chute per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00686249-I1
09/18/2023
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00684171-I1
02/17/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
02/17/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/15/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/13/2023
Signed off — Alteration
STRUCTURAL WORK.
B00343430-I1
12/29/2022
Special inspection requirement — Public Assembly Emergency Lighting
PHILIP RESCINITI
12/19/2022
Objection resolved — Addressed
12/09/2022
Objection resolved — Addressed
11/30/2022
Objection resolved — Addressed
11/24/2022
Objection raised — Structural
11/24/2022
Objection raised — Structural
11/24/2022
Objection raised — Structural
11/16/2022
Filed — No Work
B00349732-P2
11/15/2022
Special inspection requirement — Public Assembly Emergency Lighting
PHILIP RESCINITI
11/09/2022
Violation issued (FDNY_NOV, closed)
11/09/2022
Special inspection requirement — Standpipe Systems
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — HVAC and service water heating system controls
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — HVAC and service water heating equipment
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — Sprinkler Systems
IBRAHIM MOURAD
10/27/2022
Objection resolved — Addressed
10/20/2022
Objection raised — Scope
10/19/2022
Filed — Alteration
ALLNEW PLUMBING AND SPRINKLER AND STORM WATER RETENTION PER DRAWINGS.
B00343478-P5
10/17/2022
Special inspection requirement — Maintenance information
Roger Tan
10/17/2022
Special inspection requirement — HVAC and service water heating system controls
Roger Tan
10/17/2022
Special inspection requirement — Fire-Resistance Rated Construction
Roger Tan
10/17/2022
Special inspection requirement — Standpipe Systems
Roger Tan
10/17/2022
Special inspection requirement — Sprinkler Systems
Roger Tan
10/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
10/17/2022
Special inspection requirement — HVAC and service water heating equipment
Roger Tan
10/13/2022
Signed off — Alteration
B00353114-I1
10/04/2022
Objection resolved — Addressed
09/29/2022
Objection raised — Scope
09/23/2022
Filed — Alteration
ALLNEW PLUMBING AND SPRINKLER AND STORM WATER RETENTION PER DRAWINGS.
B00343478-P4
09/01/2022
Filed — Alteration
ALLNEW PLUMBING AND SPRINKLER AND STORM WATER RETENTION PER DRAWINGS.
B00343478-P3
08/30/2022
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
08/23/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/23/2022
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/19/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/19/2022
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/19/2022
Objection raised — Scope
08/19/2022
Objection resolved — Addressed
08/19/2022
Special inspection requirement — Final
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Heating Systems
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Mechanical Systems
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP RESCINITI
08/19/2022
Special inspection requirement — HVAC insulation and sealing
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Shutoff dampers
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Electrical motors
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Duct leakage testing
PHILIP RESCINITI
08/19/2022
Special inspection requirement — HVAC and service water heating system controls
PHILIP RESCINITI
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedP & D MECHANICAL CORP08/12/2022
DOB NOWPlumbingSigned-offRAPTOR MECHANICAL, INC05/23/2022
DOB NOWMechanical SystemsSigned-offNEWGRANGE CONSTRUCTION CO04/29/2022
DOB NOWStructuralSigned-offNEWGRANGE CONSTRUCTION CO04/27/2022
DOB NOWSprinklersPermit IssuedP & D MECHANICAL CORP03/01/2022
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP02/28/2022
DOB NOWProtection and Mechanical MethodsSigned-offCS BRIDGE CORP02/25/2022
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP02/24/2022
DOB NOWConstruction FenceSigned-offNEWGRANGE CONSTRUCTION CO01/25/2022
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP08/09/2021
DOB NOWStandpipeSigned-offRAPTOR MECHANICAL, INC07/15/2021
DOB NOWStandpipeSigned-offRAPTOR MECHANICAL, INC03/08/2021
DOB NOWConstruction FenceSigned-offNEWGRANGE CONSTRUCTION CO12/17/2020
DOB NOWConstruction FenceSigned-offALBA SERVICES INC12/02/2020
BIS—ISSUEDNEWGRANGE CONSTRUCTION CO12/15/2022
BISEQISSUEDCS BRIDGE CORP09/01/2022
BIS—ISSUEDNEWGRANGE CONSTRUCTION CO12/14/2021
BIS—ISSUEDNEWGRANGE CONSTRUCTION CO12/14/2021
BIS—ISSUEDNEWGRANGE CONSTRUCTION CO09/30/2021
BISOTISSUEDBROOKLYN SOLARWORKS LLC09/17/2021
BISEQISSUEDCS BRIDGE CORP09/01/2021
BIS—ISSUEDNEWGRANGE CONSTRUCTION CO01/26/2021
BIS—ISSUEDNEWGRANGE CONSTRUCTION CO01/21/2021
BISOTISSUEDNEWGRANGE CONSTRUCTION CO12/16/2020
BISOTISSUEDNEWGRANGE CONSTRUCTION CO10/13/2020
BISEQISSUEDCS BRIDGE CORP09/22/2020
1 project · most recent 08/15/2022
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/15/2022Signed-offNEWGRANGE CONSTRUCTION COHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric TPLFY-P036EM140B 40,000 BTU · Vrf Indoor ×70
TPLFY-P024EM140B 40,000 BTU · Vrf Indoor ×40
PLFY-P12NFMU-E 13,500 BTU · Vrf Indoor ×20
TPKFY-P012LM140A 13,500 BTU · Vrf Indoor ×10
TPEFY-P036MA143B 42,000 BTU · Vrf Indoor ×5
TPEFY-P048MA143 54,000 BTU · Vrf Indoor ×5
TPEFY-P048MA143B 54,000 BTU · Vrf Indoor ×5
TPEFY-P48MA143 54,000 BTU · Vrf Indoor ×5
TPKA-0A0241KA70A 24,000 BTU ×5
TPKFY-P012HM142B 13,500 BTU · Vrf Indoor ×5
TPLFY-P012FM140 13,500 BTU · Vrf Indoor ×5
TPLFY-P012FM14B 13,500 BTU · Vrf Indoor ×5
Ventilation
Mitsubishi Electric TUMYH-0481AK41NA 54,000 BTU · Condensing Unit ×15
TURYH-0963AN40AN 215,000 BTU · Vrf Outdoor ×10
TRUYA-0121KA70NA 13,600 BTU · Condensing Unit ×5
TRUYA-0241Ha70NA 24,000 BTU · Condensing Unit ×5
TUMYH-H0361AK41NA 42,000 BTU · Vrf Outdoor ×5
TURYH-U963AN40AN 215,000 BTU · Vrf Outdoor ×5
Trane OAK/NREV5 337,000 BTU · Rooftop Unit ×5
OANE420D3C1B400LR 391,200 BTU · Rooftop Unit ×5
WSH240E3R0D1706C0A 247,700 BTU · Rooftop Unit ×5
1 project · most recent 10/19/2022
FiledStatusContractorScope
10/19/2022Permit IssuedCMP PIPING INC722 heads, 4 outlets
1 project · most recent 10/19/2022
Storm Water/Sanitary
FiledStatusContractorScope
10/19/2022Signed-offRAPTOR MECHANICAL,INCStorm, Water/Sanitary
5 projects · most recent 12/06/2022
General Wiring
FiledStatusContractorScope
12/06/2022CompleteBROOKYLN SOLARWORKS, LLC—
07/13/2022Permit IssuedALL STATE ELEC CNSTCT LLCGeneral Wiring
06/09/2022CompleteTUXEDO ELEC'L CONTR'G INC—
02/23/2021Permit IssuedALL STATE ELEC CNSTCT LLC1 meters, 1 new_meters
09/02/2020CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
02/17/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
02/17/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/30/2022Pass-Final SD - Fire PumpPassView ↗
08/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/23/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/19/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/19/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
12/29/2022Public Assembly Emergency LightingPHILIP RESCINITIprogress
11/15/2022Public Assembly Emergency LightingPHILIP RESCINITIprogress
11/09/2022Standpipe SystemsIBRAHIM MOURADspecial
11/09/2022HVAC and service water heating system controls IBRAHIM MOURADenergy_progress
11/09/2022Maintenance informationIBRAHIM MOURADenergy_progress
11/09/2022HVAC and service water heating equipment IBRAHIM MOURADenergy_progress
11/09/2022Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
11/09/2022Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
11/09/2022Sprinkler SystemsIBRAHIM MOURADspecial
10/17/2022Maintenance informationRoger Tanenergy_progress
10/17/2022HVAC and service water heating system controls Roger Tanenergy_progress
10/17/2022Fire-Resistance Rated ConstructionRoger Tanprogress
10/17/2022Standpipe SystemsRoger Tanspecial
10/17/2022Sprinkler SystemsRoger Tanspecial
10/17/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
10/17/2022HVAC and service water heating equipment Roger Tanenergy_progress
08/19/2022FinalPHILIP RESCINITIprogress
08/19/2022Heating SystemsPHILIP RESCINITIspecial
08/19/2022Mechanical SystemsPHILIP RESCINITIspecial
08/19/2022Fire-Resistant Penetrations and JointsPHILIP RESCINITIspecial
08/19/2022HVAC insulation and sealing PHILIP RESCINITIenergy_progress
08/19/2022Shutoff dampersPHILIP RESCINITIenergy_progress
08/19/2022Electrical motorsPHILIP RESCINITIenergy_progress
08/19/2022Duct leakage testing PHILIP RESCINITIenergy_progress
08/19/2022HVAC and service water heating system controls PHILIP RESCINITIenergy_progress
Latest 25 of 58.
▾Documents — 371 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch - Plumbing6
09/02/2026B00353276-I1Request digital key ↗
08/29/2026B00343478-I1Request digital key ↗
08/29/2026B00343478-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
08/29/2026B00343478-I1Request digital key ↗
08/29/2026B00343478-P3Request digital key ↗
08/15/2026B00343478-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/29/2026B00343478-P3Request digital key ↗
08/29/2026B00343478-I1Request digital key ↗
08/15/2026B00343478-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly5
08/15/2026B00349519-I1Request digital key ↗
08/15/2026B00349732-I1Request digital key ↗
08/15/2026B00349519-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch4
08/31/2026B00686249-I1Request digital key ↗
08/31/2026B00684170-I1Request digital key ↗
08/31/2026B00684171-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00342446-I1Request digital key ↗
08/14/2026B00342446-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/15/2026B00343430-I1Request digital key ↗
08/14/2026B00343430-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00385185-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00353114-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00385184-I1Request digital key ↗
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION40
04/06/2023322087004Open ↗
02/28/2023322087004Open ↗
02/03/2023322043757Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION11
09/30/2021322043757Open ↗
09/17/2021340817833Open ↗
02/17/2021322043757Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
11/17/2020322043757Open ↗
09/14/2020322043757Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/26/2020322043757Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/06/2023322043757Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/08/2021322043757Open ↗
▸Seals & Professional Certifications81
▸DOB NOWProgress Inspector Seal & Signature32
09/27/2026B00343430-I1Open ↗
09/02/2026B00349519-I1Open ↗
09/01/2026B00349732-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/31/2026B00684170-I1Open ↗
08/13/2026B00343478-P5Open ↗
08/13/2026B00349732-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/27/2026B00343430-I1Open ↗
08/27/2026B00343478-I1Open ↗
08/27/2026B00343478-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/11/2020322043757Open ↗
Showing 1 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/27/2021340817833Open ↗
09/22/2020340733781Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/22/2020340733781Open ↗
09/17/2020340766807Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/17/2020340766807Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment1
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/04/2022322043757Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST8
04/20/2021322087004Open ↗
04/19/2021322087004Open ↗
11/06/2020322043757Open ↗
Showing 3 of 8 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
08/02/2022340733781Open ↗
07/26/2022322043757Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/17/2020322043757Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
06/05/2023322043757Open ↗
04/20/2023340817833Open ↗
09/26/2022322043757Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/11/2020322043757Open ↗
Showing 1 of 2 on file for this type
▸BISSOLAR TAX ABATEMENT APPLICATION1
04/21/2023340817833Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/12/2022322043757Open ↗
▸BISFENESTRATION AREAS1
10/04/2022322043757Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/27/2021340817833Open ↗
▸BISTR8: PROVIDE INITIAL REPORT FOR METERING/ELECTRICAL ENERGY CONSUMPTION PRIOR TO NEXT TCO RENEWAL1
06/07/2023322043757Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/12/2022322043757Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/20/2022322043757Open ↗
▸BISELECTRIC MOTORS1
10/04/2022322043757Open ↗
▸BISLIGHTING CONTROLS1
12/12/2022322043757Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00342446-I1Open ↗
▸Inspections & Test Reports35
▸BISTECHNICAL REPORT: RESPONSIBILITY20
06/05/2023322043757Open ↗
04/20/2023340817833Open ↗
03/07/2023322043757Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
09/22/2020340733781Open ↗
Showing 1 of 3 on file for this type
▸BISSUBGRADE INSP / SOILS-SITE PREP2
08/02/2022340733781Open ↗
07/26/2022322043757Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY2
08/02/2022340733781Open ↗
07/26/2022322043757Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
03/05/2021322043757Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/03/2022322043757Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/03/2022322043757Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/26/2022322043757Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
07/26/2022322043757Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
07/26/2022322043757Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
12/13/2022322043757Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs52
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
08/31/2026B00684170-I1Open ↗
08/13/2026B00343478-P4Open ↗
08/13/2026B00343478-P5Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE16
02/03/2023322043757Open ↗
01/26/2023322043757Open ↗
01/13/2023322043757Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
04/21/2023340817833Open ↗
10/06/2022322043757Open ↗
10/06/2022322043757Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/19/2023340766807Open ↗
04/21/2023340817833Open ↗
08/03/2022340733781Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL1
08/02/2022340733781Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT5
04/20/2023340817833Open ↗
07/27/2021340817833Open ↗
09/22/2020340733781Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
09/30/2021322043757Open ↗
02/17/2021322043757Open ↗
01/26/2021322043757Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/28/2022340733781Open ↗
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION13
07/07/2023322087004Open ↗
04/13/2023322087004Open ↗
12/06/2022322043757Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
02/17/2021322043757Open ↗
01/19/2021322043757Open ↗
12/18/2020322043757Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/27/2021340817833Open ↗
09/22/2020340733781Open ↗
09/17/2020340766807Open ↗
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
09/16/2021340817833Open ↗
09/16/2021340817833Open ↗
09/16/2021340817833Open ↗
Showing 3 of 4 on file for this type
▸BISTCO - Supporting Documents2
03/03/2023322043757Open ↗
02/14/2023322043757Open ↗
▸DOB NOWAlternate Plan 12
08/15/2026B00349519-I1Open ↗
08/15/2026B00349519-P1Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
03/02/2023322043757Open ↗
▸BISMAINTENANCE INFORMATION1
11/28/2022322043757Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
10/04/2022322043757Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
11/16/2022322043757Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
10/04/2022322043757Open ↗