← Back
BuildNYC
School or academy
German School Brooklyn
760 STERLING PLACE · BIN 3428802
💬 Discuss this project
2022Year Built
4Stories
W3Building Class
R6AZoning
138,029 sfGross Floor Area
0Units
LL97 Covered0 Active ViolationsFDNY Report ↗
School or academy · Owner of record: German School Brooklyn · 15,660 sf lot · 8.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGerman School Brooklyn88p · 4 filings · 17 docs
Floor 4German School Brooklyn61p · 1 filing · 10 docs
Floor 3German School Brooklyn87p · 3 filings · 10 docs
Floor 2German School Brooklyn87p · 3 filings · 10 docs
Floor 1German School Brooklyn96p · 5 filings · 10 docs
MezzanineGerman School Brooklyn25p · 2 filings · 18 docs
Site & exteriorGerman School Brooklyn17p · 6 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
German School Brooklyn3607/08/2026
116-126 Rogers Ave803/21/2026
Carmel Christian School103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/23/2020$7.1M—Private party → German School Brooklyn$195/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Studio Parallel511/16/2022
Tan Engineering710/19/2022
KZ Engineering607/07/2022
Active Design Group Engineering201/20/2021
Awz Engineering109/22/2020
Ashraf106/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants603/21/2026
JMV Associates3003/21/2026
KD Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Newgrange Construction CoScaffold603/21/2026
CS BridgeScaffold507/08/2026
Newgrange Construction CoGeneral Contractor407/08/2026
Studio ParallelGeneral Contractor403/22/2026
Raptor MechanicalPlumbing307/08/2026
Alba ServicesScaffold203/21/2026
P & D MechanicalFire Protection207/08/2026
Tuxedo Electrical ContractingElectrical103/22/2026
Star Electrical ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tan Engineering1291510/19/2022
Bureau Veritas Na6902307/02/2020
Building Lifecycle
All (165)Filed (22)Permit Issued (15)Signed Off (7)Violation (12)Inspection (7)Objection (72)Special Inspection (30)
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/2024
Violation issued (FDNY_NOV, closed)
12/18/2023
Violation issued (FDNY_NOV, closed)
09/27/2023
Signed off — Alteration
B00385185-I1
09/27/2023
Signed off — Alteration
B00385184-I1
09/18/2023
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00684170-I1
09/18/2023
Signed off — Alteration
Installation of temporary chute per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00686249-I1
09/18/2023
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00684171-I1
02/13/2023
Signed off — Alteration
STRUCTURAL WORK.
B00343430-I1
12/29/2022
Special inspection requirement — Public Assembly Emergency Lighting
PHILIP RESCINITI
12/19/2022
Objection resolved — Addressed
12/09/2022
Objection resolved — Addressed
11/30/2022
Objection resolved — Addressed
11/24/2022
Objection raised — Structural
11/24/2022
Objection raised — Structural
11/24/2022
Objection raised — Structural
11/16/2022
Filed — No Work
B00349732-P2
11/15/2022
Special inspection requirement — Public Assembly Emergency Lighting
PHILIP RESCINITI
11/09/2022
Violation issued (FDNY_NOV, closed)
11/09/2022
Special inspection requirement — Standpipe Systems
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — HVAC and service water heating system controls
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — HVAC and service water heating equipment
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
11/09/2022
Special inspection requirement — Sprinkler Systems
IBRAHIM MOURAD
10/27/2022
Objection resolved — Addressed
10/20/2022
Objection raised — Scope
10/19/2022
Filed — Alteration
ALLNEW PLUMBING AND SPRINKLER AND STORM WATER RETENTION PER DRAWINGS.
B00343478-P5
10/17/2022
Special inspection requirement — Maintenance information
Roger Tan
10/17/2022
Special inspection requirement — HVAC and service water heating system controls
Roger Tan
10/17/2022
Special inspection requirement — Fire-Resistance Rated Construction
Roger Tan
10/17/2022
Special inspection requirement — Standpipe Systems
Roger Tan
10/17/2022
Special inspection requirement — Sprinkler Systems
Roger Tan
10/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
10/17/2022
Special inspection requirement — HVAC and service water heating equipment
Roger Tan
10/13/2022
Signed off — Alteration
B00353114-I1
10/04/2022
Objection resolved — Addressed
09/29/2022
Objection raised — Scope
09/23/2022
Filed — Alteration
ALLNEW PLUMBING AND SPRINKLER AND STORM WATER RETENTION PER DRAWINGS.
B00343478-P4
09/01/2022
Filed — Alteration
ALLNEW PLUMBING AND SPRINKLER AND STORM WATER RETENTION PER DRAWINGS.
B00343478-P3
08/30/2022
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
08/23/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/23/2022
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/19/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/19/2022
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/19/2022
Objection raised — Scope
08/19/2022
Objection resolved — Addressed
08/19/2022
Special inspection requirement — Final
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Heating Systems
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Mechanical Systems
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP RESCINITI
08/19/2022
Special inspection requirement — HVAC insulation and sealing
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Shutoff dampers
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Electrical motors
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Duct leakage testing
PHILIP RESCINITI
08/19/2022
Special inspection requirement — HVAC and service water heating system controls
PHILIP RESCINITI
08/19/2022
Special inspection requirement — Maintenance information
PHILIP RESCINITI
08/19/2022
Special inspection requirement — HVAC and service water heating equipment
PHILIP RESCINITI
08/15/2022
Filed — Alteration
NEW INSTALLATION OF HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS.
B00342446-P1
Latest 60 of 165 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedP & D Mechanical08/12/2022
DOB NOWPlumbingSigned-offRaptor Mechanical05/23/2022
DOB NOWMechanical SystemsSigned-offNewgrange Construction Co04/29/2022
DOB NOWStructuralSigned-offNewgrange Construction Co04/27/2022
DOB NOWSprinklersPermit IssuedP & D Mechanical03/01/2022
DOB NOWSidewalk ShedSigned-offCS Bridge02/28/2022
DOB NOWProtection and Mechanical MethodsSigned-offCS Bridge02/25/2022
DOB NOWSupported ScaffoldSigned-offCS Bridge02/24/2022
DOB NOWConstruction FenceSigned-offNewgrange Construction Co01/25/2022
DOB NOWSidewalk ShedSigned-offCS Bridge08/09/2021
DOB NOWPlumbingSigned-offRaptor Mechanical07/15/2021
DOB NOWPlumbingSigned-offRaptor Mechanical03/08/2021
DOB NOWPlumbingSigned-offDW Plumbing02/08/2021
DOB NOWConstruction FenceSigned-offNewgrange Construction Co12/17/2020
DOB NOWConstruction FenceSigned-offAlba Services12/02/2020
BIS—ISSUEDNewgrange Construction Co12/15/2022
BISEQISSUEDCS Bridge09/01/2022
BIS—ISSUEDNewgrange Construction Co12/14/2021
BIS—ISSUEDNewgrange Construction Co12/14/2021
BIS—ISSUEDNewgrange Construction Co09/30/2021
BISOTISSUEDBrooklyn Solarworks09/17/2021
BISEQISSUEDCS Bridge09/01/2021
BIS—ISSUEDNewgrange Construction Co01/26/2021
BIS—ISSUEDNewgrange Construction Co01/21/2021
BISOTISSUEDNewgrange Construction Co12/16/2020
BISOTISSUEDNewgrange Construction Co10/13/2020
BISEQISSUEDCS Bridge09/22/2020
1 project · most recent 08/15/2022
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/15/2022Signed-offNewgrange Construction CoHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric TPLFY-P036EM140B 40,000 BTU · Vrf Indoor ×70
TPLFY-P024EM140B 40,000 BTU · Vrf Indoor ×40
PLFY-P12NFMU-E 13,500 BTU · Vrf Indoor ×20
TPKFY-P012LM140A 13,500 BTU · Vrf Indoor ×10
TPEFY-P036MA143B 42,000 BTU · Vrf Indoor ×5
TPEFY-P048MA143 54,000 BTU · Vrf Indoor ×5
TPEFY-P048MA143B 54,000 BTU · Vrf Indoor ×5
TPEFY-P48MA143 54,000 BTU · Vrf Indoor ×5
TPKA-0A0241KA70A 24,000 BTU ×5
TPKFY-P012HM142B 13,500 BTU · Vrf Indoor ×5
TPLFY-P012FM140 13,500 BTU · Vrf Indoor ×5
TPLFY-P012FM14B 13,500 BTU · Vrf Indoor ×5
Ventilation
Mitsubishi Electric TUMYH-0481AK41NA 54,000 BTU · Condensing Unit ×15
TURYH-0963AN40AN 215,000 BTU · Vrf Outdoor ×10
TRUYA-0121KA70NA 13,600 BTU · Condensing Unit ×5
TRUYA-0241Ha70NA 24,000 BTU · Condensing Unit ×5
TUMYH-H0361AK41NA 42,000 BTU · Vrf Outdoor ×5
TURYH-U963AN40AN 215,000 BTU · Vrf Outdoor ×5
Trane OAK/NREV5 337,000 BTU · Rooftop Unit ×5
OANE420D3C1B400LR 391,200 BTU · Rooftop Unit ×5
WSH240E3R0D1706C0A 247,700 BTU · Rooftop Unit ×5
1 project · most recent 10/19/2022
FiledStatusContractorScope
10/19/2022Permit IssuedCMP Piping722 heads, 4 outlets
1 project · most recent 10/19/2022
Storm Water/Sanitary
FiledStatusContractorScope
10/19/2022Signed-offRaptor MechanicalStorm, Water/Sanitary
5 projects · most recent 12/06/2022
General Wiring
FiledStatusContractorScope
12/06/2022CompleteBrookyln Solarworks—
07/13/2022Permit IssuedAll State Electric CnstctGeneral Wiring
06/09/2022CompleteTuxedo Electrical Contracting—
02/23/2021Permit IssuedAll State Electric Cnstct1 meters, 1 new_meters
09/02/2020CompleteNash Electric Services—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/30/2022Pass-Final SD - Fire PumpPassView ↗
08/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/23/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/19/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/19/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/14/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
12/29/2022Public Assembly Emergency LightingPHILIP RESCINITIprogress
11/15/2022Public Assembly Emergency LightingPHILIP RESCINITIprogress
11/09/2022Standpipe SystemsIBRAHIM MOURADspecial
11/09/2022HVAC and service water heating system controls IBRAHIM MOURADenergy_progress
11/09/2022Maintenance informationIBRAHIM MOURADenergy_progress
11/09/2022HVAC and service water heating equipment IBRAHIM MOURADenergy_progress
11/09/2022Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
11/09/2022Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
11/09/2022Sprinkler SystemsIBRAHIM MOURADspecial
10/17/2022Maintenance informationRoger Tanenergy_progress
10/17/2022HVAC and service water heating system controls Roger Tanenergy_progress
10/17/2022Fire-Resistance Rated ConstructionRoger Tanprogress
10/17/2022Standpipe SystemsRoger Tanspecial
10/17/2022Sprinkler SystemsRoger Tanspecial
10/17/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
10/17/2022HVAC and service water heating equipment Roger Tanenergy_progress
08/19/2022FinalPHILIP RESCINITIprogress
08/19/2022Heating SystemsPHILIP RESCINITIspecial
08/19/2022Mechanical SystemsPHILIP RESCINITIspecial
08/19/2022Fire-Resistant Penetrations and JointsPHILIP RESCINITIspecial
08/19/2022HVAC insulation and sealing PHILIP RESCINITIenergy_progress
08/19/2022Shutoff dampersPHILIP RESCINITIenergy_progress
08/19/2022Electrical motorsPHILIP RESCINITIenergy_progress
08/19/2022Duct leakage testing PHILIP RESCINITIenergy_progress
08/19/2022HVAC and service water heating system controls PHILIP RESCINITIenergy_progress
Latest 25 of 58.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
German School BrooklynEducationEntire building
Project B00684171 Alteration · LOC Issued · 02/25/2022
Project B00684170 Alteration · LOC Issued · 02/24/2022
Project B00686249 Alteration · LOC Issued · 02/24/2022
Project B00353276 Alteration · Permit Entire · 09/22/2020
Project B00385184 Alteration · LOC Issued · 08/31/2020
Project B00385185 Alteration · LOC Issued · 08/31/2020
Project B00343478 Alteration · Permit Entire · 07/02/2020
Project B00353114 Alteration · LOC Issued · 06/18/2020
Project B00343430 Alteration · LOC Issued · 05/12/2020
Project B00342446 Alteration · Permit Entire · 04/27/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 371 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch - Plumbing6
09/02/2026B00353276-I1Request digital key ↗
08/29/2026B00343478-I1Request digital key ↗
08/29/2026B00343478-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
08/29/2026B00343478-I1Request digital key ↗
08/29/2026B00343478-P3Request digital key ↗
08/15/2026B00343478-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
08/29/2026B00343478-P3Request digital key ↗
08/29/2026B00343478-I1Request digital key ↗
08/15/2026B00343478-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly5
08/15/2026B00349519-I1Request digital key ↗
08/15/2026B00349732-I1Request digital key ↗
08/15/2026B00349519-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch4
08/31/2026B00686249-I1Request digital key ↗
08/31/2026B00684170-I1Request digital key ↗
08/31/2026B00684171-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00342446-I1Request digital key ↗
08/14/2026B00342446-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/15/2026B00343430-I1Request digital key ↗
08/14/2026B00343430-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00385185-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00353114-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00385184-I1Request digital key ↗
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION40
04/06/2023322087004Open ↗
02/28/2023322087004Open ↗
02/03/2023322043757Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION11
09/30/2021322043757Open ↗
09/17/2021340817833Open ↗
02/17/2021322043757Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
11/17/2020322043757Open ↗
09/14/2020322043757Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/26/2020322043757Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/06/2023322043757Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/08/2021322043757Open ↗
▸Seals & Professional Certifications81
▸DOB NOWProgress Inspector Seal & Signature32
09/27/2026B00343430-I1Open ↗
09/02/2026B00349519-I1Open ↗
09/01/2026B00349732-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/31/2026B00684170-I1Open ↗
08/13/2026B00343478-P5Open ↗
08/13/2026B00349732-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/27/2026B00343430-I1Open ↗
08/27/2026B00343478-I1Open ↗
08/27/2026B00343478-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/11/2020322043757Open ↗
Showing 1 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/27/2021340817833Open ↗
09/22/2020340733781Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/22/2020340733781Open ↗
09/17/2020340766807Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/17/2020340766807Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment1
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/04/2022322043757Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST8
04/20/2021322087004Open ↗
04/19/2021322087004Open ↗
11/06/2020322043757Open ↗
Showing 3 of 8 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
08/02/2022340733781Open ↗
07/26/2022322043757Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/17/2020322043757Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
06/05/2023322043757Open ↗
04/20/2023340817833Open ↗
09/26/2022322043757Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/11/2020322043757Open ↗
Showing 1 of 2 on file for this type
▸BISSOLAR TAX ABATEMENT APPLICATION1
04/21/2023340817833Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/12/2022322043757Open ↗
▸BISFENESTRATION AREAS1
10/04/2022322043757Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/27/2021340817833Open ↗
▸BISTR8: PROVIDE INITIAL REPORT FOR METERING/ELECTRICAL ENERGY CONSUMPTION PRIOR TO NEXT TCO RENEWAL1
06/07/2023322043757Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/12/2022322043757Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/20/2022322043757Open ↗
▸BISELECTRIC MOTORS1
10/04/2022322043757Open ↗
▸BISLIGHTING CONTROLS1
12/12/2022322043757Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00342446-I1Open ↗
▸Inspections & Test Reports35
▸BISTECHNICAL REPORT: RESPONSIBILITY20
06/05/2023322043757Open ↗
04/20/2023340817833Open ↗
03/07/2023322043757Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
09/22/2020340733781Open ↗
Showing 1 of 3 on file for this type
▸BISSUBGRADE INSP / SOILS-SITE PREP2
08/02/2022340733781Open ↗
07/26/2022322043757Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY2
08/02/2022340733781Open ↗
07/26/2022322043757Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
03/05/2021322043757Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/03/2022322043757Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/03/2022322043757Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/26/2022322043757Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
07/26/2022322043757Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
07/26/2022322043757Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
12/13/2022322043757Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs52
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
08/31/2026B00684170-I1Open ↗
08/13/2026B00343478-P4Open ↗
08/13/2026B00343478-P5Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE16
02/03/2023322043757Open ↗
01/26/2023322043757Open ↗
01/13/2023322043757Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
04/21/2023340817833Open ↗
10/06/2022322043757Open ↗
10/06/2022322043757Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/19/2023340766807Open ↗
04/21/2023340817833Open ↗
08/03/2022340733781Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL1
08/02/2022340733781Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT5
04/20/2023340817833Open ↗
07/27/2021340817833Open ↗
09/22/2020340733781Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
09/30/2021322043757Open ↗
02/17/2021322043757Open ↗
01/26/2021322043757Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/28/2022340733781Open ↗
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION13
07/07/2023322087004Open ↗
04/13/2023322087004Open ↗
12/06/2022322043757Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
02/17/2021322043757Open ↗
01/19/2021322043757Open ↗
12/18/2020322043757Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/27/2021340817833Open ↗
09/22/2020340733781Open ↗
09/17/2020340766807Open ↗
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
09/16/2021340817833Open ↗
09/16/2021340817833Open ↗
09/16/2021340817833Open ↗
Showing 3 of 4 on file for this type
▸BISTCO - Supporting Documents2
03/03/2023322043757Open ↗
02/14/2023322043757Open ↗
▸DOB NOWAlternate Plan 12
08/15/2026B00349519-I1Open ↗
08/15/2026B00349519-P1Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
03/02/2023322043757Open ↗
▸BISMAINTENANCE INFORMATION1
11/28/2022322043757Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
10/04/2022322043757Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
11/16/2022322043757Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
10/04/2022322043757Open ↗