← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Executive Plaza Condominium
761 7TH AVENUE · BIN 1022710
💬 Discuss this project
1927Year Built
20Stories
RMBuilding Class
C6-7Zoning
450,162 sfGross Floor Area
448Units
LL97 CoveredRent Stabilized3 Active Violations 2 unresolved · 1 paperwork only 9 likely answered 1 old, status unconfirmed ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Executive Plaza Condominium · 30,125 sf lot · 14.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsScaffold for facade repairs1 filing
RoofAkam Associates, INC.2p · 2 filings · 14 docs
Floor 20Unit 20081 filing · 5 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Sandbox VR, Westside Donut Ventures +2Under Construction19p · 20 filings · 20 docs
MezzanineThe Riese Organization1p · 4 filings · 20 docs
CellarSandbox VR, The Riese Organization +1Under Construction12p · 10 filings · 20 docs
Site & exteriorDunkin' / Baskin-Robbins, T.G.I. FridaysUnder Construction5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DC Associates2207/08/2026
761-779 Seventh Ave Condominum2203/21/2026
Starhotels International1703/21/2026
Taft Friday 7th Ave1203/21/2026
Executive Plaza Condo1103/21/2026
Fortuny803/21/2026
761 Partnership803/21/2026
Empire State Properties703/21/2026
Henry Atlantic Partners403/21/2026
IU-Realty403/21/2026
Board of Managers Exc Plaza Cond403/21/2026
Friday 50th Street303/21/2026
150 West 51st St Owners303/21/2026
777 Gallery303/21/2026
50th 7th Ave Rest203/21/2026
Delshah Capital110/13/2026
ROG2LLC103/21/2026
716-779 Seventh Avenue103/21/2026
Exec Plaza Condominium103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tang Studio603/21/2026
Concept Design Group103/21/2026
Hlzae103/21/2026
Kna Consulting1003/21/2026
BMB Building Consulting203/21/2026
Municipal Building Consultants203/21/2026
Noren International203/21/2026
Youn Design203/21/2026
Riggining Consultants103/21/2026
Seay-Yarbrough603/21/2026
Building Brothers203/21/2026
FSR Enterprises403/21/2026
D R Brown203/21/2026
Richard Kreshtool Architect203/21/2026
Epac Building Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Canido Basonas ConstructionScaffold1107/08/2026
AL Saeed ConstructionGeneral Contractor407/08/2026
Phoenix Sutton STRScaffold403/21/2026
All Vision General Construction*General Contractor303/21/2026
Keltic Construction & WooGeneral Contractor303/21/2026
Wharton Smith Constructi*General Contractor303/21/2026
Michelle KuoGeneral Contractor307/08/2026
Spartan Demolition Cospecialty_contractor303/21/2026
Balaton Construction of NGeneral Contractor207/08/2026
Built NYGGeneral Contractor207/08/2026
MCC ContractingGeneral Contractor203/21/2026
Unitech DesignSign hanger209/03/2026
Empire PlumbingPlumbing207/08/2026
Atmos Electric SvceElectrical103/22/2026
W.R. Plumbing and HeatingPlumbing107/08/2026
Accurate ElectricalElectrical103/21/2026
Csi Electrical & Mechanical IElectrical103/22/2026
Expedite General ContractingGeneral Contractor108/01/2026
Mechanical East Cospecialty_contractor107/15/2026
Tier 1 MaintenanceGeneral Contractor107/08/2026
Balaton Construction of NScaffold107/08/2026
L.S. Sign CoSign hanger107/08/2026
Neptune Signs & AwningsSign hanger107/08/2026
Paul SignsSign hanger107/08/2026
I.M.P. Plumbing & HeatingPlumbing107/08/2026
Jem Fire PreventionFire Protection107/08/2026
Tri State Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Think Design Architectura683710/19/2026
Zelta Inspection7764209/01/2026
Levin Engineering1267104/29/2026
Tan Engineering1291104/02/2026
Howard L Zimmerman Architects1712109/02/2025
Z & T Engineering591102/24/2025
Feingold & Gregory Architects979101/27/2024
Cherico King Architect5674101/27/2024
Engineering Consulting SE2050311/10/2023
BFS Architect7477210/23/2023
Mottola Rini Engineers, P3251310/23/2023
Tang Studio6949304/13/2023
Domani Inspection Service843108/16/2021
Brian Ill Development1402211/22/2019
Building Lifecycle
All (222)Filed (45)Permit Issued (36)Signed Off (10)Facade (FISP) (13)Violation (60)Inspection (10)Objection (18)Special Inspection (30)
10/19/2026
Filed — Alteration
Application is filed for the plumbing work in conjunction with the alteration application #M01380386-I1.
M01380386-P4
10/16/2026
Special inspection requirement — Interior lighting power
Frank Martarella III
10/16/2026
Special inspection requirement — Lighting controls
Frank Martarella III
10/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
10/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
10/16/2026
Special inspection requirement — Final
Frank Martarella III
10/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
Frank Martarella III
10/12/2026
Filed — No Work
M01465578-I1
10/06/2026
Filed — Alteration
Application is filed for the plumbing work in conjunction with the alteration application #M01380386-I1.
M01380386-P1
10/06/2026
Filed — Alteration
Application is filed for the plumbing work in conjunction with the alteration application #M01380386-I1.
M01380386-P3
10/06/2026
Filed — Alteration
Application is filed for the plumbing work in conjunction with the alteration application #M01380386-I1.
M01380386-P2
10/05/2026
Signed off — Alteration
WSHP UNITS AND WATER PIPES INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01391139-I1
10/03/2026
Special inspection requirement — Duct leakage testing, insulation and design
Frank Martarella III
10/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
10/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Martarella III
10/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Frank Martarella III
10/03/2026
Special inspection requirement — Interior lighting power
Frank Martarella III
10/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Frank Martarella III
10/03/2026
Special inspection requirement — Maintenance information
Frank Martarella III
10/03/2026
Special inspection requirement — Interior lighting power
Frank Martarella III
10/03/2026
Special inspection requirement — Maintenance information
Frank Martarella III
10/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
10/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
10/03/2026
Special inspection requirement — Lighting controls
Frank Martarella III
10/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
10/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Frank Martarella III
10/03/2026
Special inspection requirement — Mechanical Systems
Frank Martarella III
10/03/2026
Special inspection requirement — Permanent certificate
Frank Martarella III
10/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
Frank Martarella III
10/03/2026
Special inspection requirement — Final
Frank Martarella III
10/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
10/03/2026
Special inspection requirement — Final
Frank Martarella III
10/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
10/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
10/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
10/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
Frank Martarella III
09/16/2026
Signed off — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00664627-I1
09/02/2026
Permit issued — Sign
M01443659-I1-SG
09/01/2026
Filed — Alteration
PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN AND 1 ILLUMINATED DOUBLE FACED NON-FLASHING ACCESSORY BUSINESS SIGN. FIRST SIGN WORDING "Logo" "SANDBOX VR" SECOND SIGN WORDING "Logo" "SANDBOX VR" "In Here, It's Possible."
M01443659-I1
09/01/2026
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M00664627-P1
08/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/03/2026
Violation issued (ECB, open)
Unknown
07/31/2026
Permit issued — General Construction
M01196805-I1-GC-CX
07/24/2026
Filed — Alteration
SIDEWALK & SIDEWALK VAULT REPAIRS. CONCRETE & STEEL FRAMING REPAIRS, WATERPROOFING INSTALLATION, CAULKING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01196805-P1
07/14/2026
Permit issued — Mechanical Systems
M01391139-I1-MS
06/02/2026
Objection resolved — Addressed
06/02/2026
Objection resolved — Addressed
05/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/28/2026
Objection raised — Scope
05/28/2026
Objection raised — Other
04/30/2026
Permit issued — Sprinklers
M01380387-I1-EW-SP
04/29/2026
Filed — Alteration
WSHP UNITS AND WATER PIPES INSTALLATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01391139-I1
04/22/2026
Permit issued — Plumbing
M01380386-S2-PL
04/22/2026
Permit issued — Mechanical Systems
M01380386-S1-MS
04/22/2026
Permit issued — General Construction
M01380386-I1-GC
04/22/2026
Violation issued (ECB, open)
Elevators
04/06/2026
Filed — Alteration
Application is filed for the plumbing work in conjunction with the alteration application #M01380386-I1.
M01380386-S2
04/06/2026
Filed — Alteration
Application is filed for the plumbing work in conjunction with the alteration application #M01380386-I1.
M01380386-S1
04/06/2026
Filed — Alteration
Application is filed for the plumbing work in conjunction with the alteration application #M01380386-I1.
M01380386-I1
04/02/2026
Filed — Alteration
Modification of existing sprinkler system within existing tenant space to be altered.
M01380387-I1
Latest 60 of 222 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedUnitech Design09/02/2026
DOB NOWGeneral ConstructionPermit IssuedExpedite General Contracting07/31/2026
DOB NOWMechanical SystemsSigned-offMechanical East Co07/14/2026
DOB NOWSprinklersPermit IssuedJem Fire Prevention04/30/2026
DOB NOWPlumbingPermit IssuedW.R. Plumbing and Heating04/22/2026
DOB NOWMechanical SystemsPermit IssuedBuilt NYG04/22/2026
DOB NOWGeneral ConstructionPermit IssuedBuilt NYG04/22/2026
DOB NOWStructuralSigned-offWharton Smith Constructi*02/27/2025
DOB NOWGeneral ConstructionPermit IssuedKeltic Construction & Woo04/03/2024
DOB NOWPlumbingSigned-offEmpire Plumbing03/14/2024
DOB NOWSignSigned-offNeptune Signs & Awnings03/13/2024
DOB NOWSignSigned-offUnitech Design02/02/2024
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System12/22/2023
DOB NOWPlumbingPermit IssuedEmpire Plumbing11/29/2023
DOB NOWMechanical SystemsPermit IssuedAL Saeed Construction10/25/2023
DOB NOWGeneral ConstructionPermit IssuedAL Saeed Construction09/12/2023
DOB NOWGeneral ConstructionPermit IssuedMCC Contracting04/19/2023
DOB NOWGeneral ConstructionSigned-off18-15 Realty04/06/2022
DOB NOWPlumbingSigned-offDW Plumbing03/31/2022
DOB NOWSignPermit IssuedWeinfeld, Elliot03/16/2022
DOB NOWGeneral ConstructionSigned-offTier 1 Maintenance03/14/2022
DOB NOWGeneral ConstructionSigned-off18-15 Realty02/09/2022
DOB NOWGeneral ConstructionPermit IssuedAll Vision General Construction*01/13/2022
DOB NOWGeneral ConstructionSigned-offSpartan Demolition Co01/07/2022
DOB NOWSupported ScaffoldPermit IssuedCanido Basonas Construction11/01/2021
DOB NOWSupported ScaffoldPermit IssuedCanido Basonas Construction03/23/2021
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR01/20/2021
DOB NOWSupported ScaffoldPermit IssuedCanido Basonas Construction12/09/2020
DOB NOWStructuralPermit IssuedBalaton Construction of N07/02/2020
DOB NOWSupported ScaffoldPermit IssuedCanido Basonas Construction02/28/2020
DOB NOWStructuralPermit IssuedBalaton Construction of N02/05/2020
DOB NOWConstruction FencePermit IssuedBalaton Construction of N02/05/2020
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR01/23/2020
DOB NOWPlumbingSigned-offI.M.P. Plumbing & Heating12/31/2019
DOB NOWSupported ScaffoldPermit IssuedCanido Basonas Construction11/20/2019
DOB NOWSignSigned-offPaul Signs10/05/2018
BISOTISSUEDW.J. Regan & Company03/25/2022
BISOTISSUEDCanido Basonas Construction Service10/28/2021
BISOTISSUEDCanido Basonas Construction Service12/10/2020
BISOTISSUEDBalaton Construction of N06/30/2020
+ 46 more permits on file
5 projects · most recent 09/01/2026
Air Conditioning Systems Associated Ducts and Piping Refrigeration Systems Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/01/2026Signed-offMichelle KuoAir Conditioning Systems
Cooling
York DSH120C2S5SAA 120,000 BTU · Condensing Unit ×1
04/29/2026Signed-offMechanical East CoAir Conditioning Systems
Cooling
Daikin WSCH048 4 tons · Chiller ×9
WSCH012 1 tons ×1
__Junk__ WSCH048 1 tons ×1
11/10/2023Permit IssuedAL Saeed ConstructionAssociated Ducts and Piping, Refrigeration Systems, Ventilation Systems
Ventilation
Greenheck BSQ-240 4,000 CFM · Kitchen Exhaust ×2
Air Quality Engineering AUTOCLEAN 8000 400 CFM · Kitchen Exhaust ×1
Refrigeration
Copeland FFWP-050Z-CFV-020 65,100 BTU · Refrigeration Unit ×3
Ducts & Piping
10/23/2023——Heating and Air Conditioning Systems
Heat / Cool
Climatemaster TCH096 93,700 BTU · Wshp ×1
08/31/2021——Air Conditioning Systems
Cooling
Coolair B4G3ASHA 4 tons · Condensing Unit ×1
EG3ASHA15 4 tons · Ahu ×1
2 projects · most recent 04/02/2026
FiledStatusContractorScope
04/02/2026Permit IssuedJem Fire Prevention194 heads
08/31/2021——13 heads
6 projects · most recent 10/19/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/19/2026Permit IssuedW.R. Plumbing and HeatingWater/Sanitary
11/10/2023Permit IssuedEmpire PlumbingWater/Sanitary
10/23/2023Signed-offEmpire PlumbingGas
11/08/2022——Gas, Water/Sanitary
08/31/2021——Water/Sanitary
11/20/2019Signed-offI.M.P. Plumbing & HeatingGas, Water/Sanitary
24 projects · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026Permit IssuedAtmos Electric Svce—
09/17/2026Permit IssuedAtmos Electric Svce—
08/24/2026CompleteKings Electric Co—
05/26/2026Permit IssuedAll Around ElectricGeneral Wiring
10/27/2025Permit IssuedAccurate ElectricalGeneral Wiring
09/05/2025Permit IssuedCentennial Elevator IndustriesGeneral Wiring
08/13/2025CompleteAsset ElectricGeneral Wiring
08/11/2025Permit IssuedCentennial Elevator IndustriesGeneral Wiring
04/28/2025Permit IssuedAscuatech Electrical—
02/02/2024CompleteAtmos Electric Svce—
12/14/2023CompleteJong Hyun Kim—
09/26/2023Permit IssuedJoe ElectricalGeneral Wiring
08/02/2023Permit IssuedJte Electrical ServicesGeneral Wiring
07/26/2023CompletePowerone Elect'l ContractingGeneral Wiring
05/08/2023CompleteProsto ElectricGeneral Wiring
3 projects · most recent 10/19/2026
FiledStatusContractorScope
10/19/2026Permit IssuedBuilt NYG1 scope_items
07/24/2026Permit IssuedExpedite General Contracting1 scope_items
11/22/2019Permit IssuedBalaton Construction of N1 scope_items
1 project · most recent 01/30/2020
Scaffold
FiledStatusContractorScope
01/30/2020Permit IssuedCanido Basonas ConstructionScaffold
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/28/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/27/2024Pass-Final Sign Permit InspectionPassView ↗
03/06/2024Pass-Final Sign Permit InspectionPassView ↗
01/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/16/2026Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
10/16/2026Energy Code Compliance InspectionsFrank Martarella IIIprogress
10/16/2026FinalFrank Martarella IIIprogress
10/16/2026Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
10/16/2026Lighting controlsFrank Martarella IIIenergy_progress
10/16/2026Interior lighting powerFrank Martarella IIIenergy_progress
10/03/2026HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
10/03/2026Energy Code Compliance InspectionsFrank Martarella IIIprogress
10/03/2026Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
10/03/2026Energy Code Compliance InspectionsFrank Martarella IIIprogress
10/03/2026HVAC-R and service water heating equipmentFrank Martarella IIIenergy_progress
10/03/2026Maintenance informationFrank Martarella IIIenergy_progress
10/03/2026HVAC-R and service water piping design and insulationFrank Martarella IIIenergy_progress
10/03/2026Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
10/03/2026Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
10/03/2026Mechanical SystemsFrank Martarella IIIspecial
10/03/2026Energy Code Compliance InspectionsFrank Martarella IIIprogress
10/03/2026FinalFrank Martarella IIIprogress
10/03/2026Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
10/03/2026HVAC-R and service water heating system controlsFrank Martarella IIIenergy_progress
10/03/2026Maintenance informationFrank Martarella IIIenergy_progress
10/03/2026Interior lighting powerFrank Martarella IIIenergy_progress
10/03/2026Interior lighting powerFrank Martarella IIIenergy_progress
10/03/2026Lighting controlsFrank Martarella IIIenergy_progress
10/03/2026Shutoff dampersFrank Martarella IIIenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Sandbox VRArts / Culture / EntertainmentCellar, Floor 1
Project M01443659 Alteration · Permit Entire · 09/01/2026
Project M01380387 Alteration · Permit Entire · 04/02/2026
Chelsea Wine + StorageIndustrial / WarehouseCellar, Floor 1
Project M08025775 Alteration · Approved · 11/08/2022
Project M08031926 Alteration · Approved · 11/08/2022
Dunkin' / Baskin-RobbinsRestaurant / Food Service—
Project M00688085 Alteration · Permit Entire · 03/12/2022
Westside Donut VenturesRestaurant / Food ServiceFloor 1
Project M00664627 Alteration · LOC Issued · 02/02/2022
Project M00664631 Alteration · LOC Issued · 02/02/2022
The Riese OrganizationOfficeCellar, Floor 1, Mezzanine
Project M00259563 Alteration · Permit Entire · 11/22/2019
Project M00244457 Alteration · Permit Entire · 11/20/2019
T.G.I. FridaysRestaurant / Food ServiceFloor 1
Project M00082780 Alteration · LOC Issued · 10/02/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,311 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch33
10/13/2026M01443659-I1Request digital key ↗
09/06/2026M00082780-I1Request digital key ↗
09/03/2026M00521934-I1Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00266689-I1Request digital key ↗
08/15/2026M00266689-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00301305-P1Request digital key ↗
09/05/2026M00301305-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00244457-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
10/13/2026M01465578-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00274099-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00259563-I1Request digital key ↗
▸Applications & Permits249
▸BISPLAN / WORK APPROVAL APPLICATION159
12/08/2025103907284Open ↗
12/01/2025103907284Open ↗
10/06/2025121822411Open ↗
Showing 3 of 159 on file for this type
▸BISWORK PERMIT APPLICATION70
03/25/2022123700744Open ↗
12/11/2020123694957Open ↗
03/02/2020123694957Open ↗
Showing 3 of 70 on file for this type
▸BISPLACE OF ASSEMBLY16
08/27/2024122509525Open ↗
Showing 1 of 16 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications356
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION120
10/02/2023123700744Open ↗
03/06/2020122563902Open ↗
03/06/2020122563902Open ↗
Showing 3 of 120 on file for this type
▸DOB NOWProgress Inspector Seal & Signature82
10/20/2026M01380386-P4Open ↗
10/20/2026M01380386-P4Open ↗
10/20/2026M01380386-P4Open ↗
Showing 3 of 82 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature44
10/20/2026M01380386-P4Open ↗
10/13/2026M01465578-I1Open ↗
10/08/2026M01380386-P1Open ↗
Showing 3 of 44 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST32
12/27/2023123700744Open ↗
01/31/2020123700744Open ↗
01/30/2020123700744Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
10/20/2026M01380386-P4Open ↗
10/14/2026M00664627-P1Open ↗
10/09/2026M01380386-I1Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT25
01/30/2020123700744Open ↗
12/20/2019122897437Open ↗
Showing 2 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment40
▸BISSCHEDULE B - PLUMBING10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection25
▸BISTenant Protection Plan and Notes12
01/30/2020123700744Open ↗
12/20/2019122897437Open ↗
Showing 2 of 12 on file for this type
▸DOB NOWTenant Protection Plan7
09/05/2026M00301305-P1Open ↗
09/05/2026M00301305-I1Open ↗
Showing 2 of 7 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
01/30/2020123700744Open ↗
12/30/2019123690443Open ↗
Showing 2 of 3 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
03/24/2022123700744Open ↗
▸Environmental & Asbestos80
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
10/20/2026M01380386-P4Open ↗
10/08/2026M01380386-P1Open ↗
10/08/2026M01380386-P3Open ↗
Showing 3 of 30 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
01/30/2020123700744Open ↗
12/20/2019122897437Open ↗
Showing 2 of 25 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Energy Compliance89
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS43
03/06/2020122563902Open ↗
03/06/2020122563902Open ↗
02/12/2020122563902Open ↗
Showing 3 of 43 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS25
10/20/2022123694957Open ↗
03/06/2020122563902Open ↗
02/12/2020122563902Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/15/2021123528334Open ↗
08/14/2020122563902Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/02/2023123700744Open ↗
11/15/2021123528334Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/02/2023123700744Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY15
12/27/2023123700744Open ↗
12/27/2023123700744Open ↗
12/18/2023123700744Open ↗
Showing 3 of 15 on file for this type
▸BISD14/FINAL INSPECTION1
12/28/2023123700744Open ↗
▸BISLetter to Change Work Order (Prior to Inspection)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs171
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST70
12/28/2023123700744Open ↗
10/21/2022123694957Open ↗
12/06/2021123528334Open ↗
Showing 3 of 70 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE58
10/06/2025121822411Open ↗
09/23/2025103907284Open ↗
07/03/2025121822411Open ↗
Showing 3 of 58 on file for this type
▸BISADMINISTRATIVE OBJECTIONS31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
02/25/2020123325936Open ↗
12/30/2019123690443Open ↗
Showing 2 of 9 on file for this type
▸BISFINAL1
11/21/2023123700744Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership95
▸BISCOST AFFIDAVIT93
10/20/2022123694957Open ↗
03/06/2020122563902Open ↗
02/25/2020123325936Open ↗
Showing 3 of 93 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/02/2023123700744Open ↗
11/15/2021123528334Open ↗
▸Filing & Intake Forms133
▸BISBOROUGH INTAKE FORM55
12/11/2020123694957Open ↗
03/17/2020121822411Open ↗
03/06/2020122563902Open ↗
Showing 3 of 55 on file for this type
▸BISEFILING COVER SHEET48
01/30/2020123700744Open ↗
12/20/2019122897437Open ↗
Showing 2 of 48 on file for this type
▸BISADDITIONAL INFORMATION24
10/04/2024122509525Open ↗
12/27/2023123700744Open ↗
06/06/2022123700744Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
07/11/2022103907284Open ↗
Showing 1 of 8 on file for this type
▸BISPlot Diagram3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type