← Back
Elevator cooperative
Atlantic Terminal Site 4b (NYCHA)
761 ATLANTIC AVENUE · BIN 3057520
💬 Discuss this project
1974Year Built
31Stories
D4Building Class
R7-2Zoning
252,500 sfGross Floor Area
300Units
LL97 CoveredRent Stabilized8 Open Violations ▸FISP: UNSAFEFDNY Report ↗
Elevator cooperative · Owner of record: NYC HOUSING AUTHORITY · 84,155 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 7 filings · 20 docs
Bulkhead3p · 1 filing · 4 docs
Cellar1p · 1 filing · 6 docs
1 job · most recent 03/02/2026
FiledStatusContractorScope
03/02/2026——3 outlets
1 job · most recent 03/02/2026
FiledStatusContractorScope
03/02/2026———
12 jobs · most recent 01/14/2026
General Wiring
FiledStatusContractorScope
01/14/2026Permit IssuedLIT MODE ELECL CONTG INC—
10/15/2025CompleteGILSTON ELEC'L CONTNG LLCGeneral Wiring
09/04/2025Permit IssuedLIT MODE ELECL CONTG INC—
06/03/2025Permit IssuedHYLAN DATACOM & ELECL LLC—
04/02/2025Permit IssuedLIT MODE ELECL CONTG INC—
05/30/2023CompleteTRANSEL ELEV. & ELEC. INCGeneral Wiring
11/15/2022CompleteTHE METRO GROUP ELECTRICGeneral Wiring
06/18/2022Permit IssuedEIA ELECTRIC, INCGeneral Wiring
03/31/2022Permit IssuedPNP ELECTRICAL CONT LLCGeneral Wiring
03/28/2022CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
10/25/2021CompleteEIA ELECTRIC, INCGeneral Wiring
10/11/2019Permit IssuedRAIDEN ELECTRIC LLC—
4 jobs · most recent 07/17/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
07/17/2026Permit IssuedMNK ENTERPRISES LLCScaffold
01/28/2026Permit IssuedMNK ENTERPRISES LLCSidewalk Shed
01/27/2026Permit IssuedMNK ENTERPRISES LLCFence
01/27/2026Permit IssuedMNK ENTERPRISES LLCScaffold
1 job · most recent 08/27/2025
Suspended Scaffold
FiledStatusContractorScope
08/27/2025Permit IssuedP & K CONTRACTING INCSuspended Scaffold
5 jobs · most recent 08/06/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/06/2026Permit IssuedWALL CONTRACTOR CORPSuspended Scaffold (SC)
09/02/2025——Suspended Scaffold (SC)
08/27/2025Permit IssuedP & K CONTRACTING INCSuspended Scaffold (SC)
08/25/2025——Suspended Scaffold (SC)
08/01/2025——Suspended Scaffold (SC)
Building Lifecycle
All (178)Filed (30)Permit Issued (34)Signed Off (4)Facade (FISP) (16)Violation (60)Objection (4)Special Inspection (30)
09/10/2026
Permit issued — Suspended Scaffold
B01457022-I1-SC
08/06/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND FACADE INSPECTION AT 483 CARLTON AVENUE, BROOKLYN, NY 11238
B01292101-P4
08/06/2026
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
08/06/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
08/01/2026
Violation issued (ECB, closed)
Unknown
07/29/2026
Objection raised — Other
07/29/2026
Objection resolved — Addressed
07/28/2026
Permit issued — Suspended Scaffold
B01292101-I1-SC
07/21/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND FACADE INSPECTION AT 483 CARLTON AVENUE, BROOKLYN, NY 11238
B01292101-P3
07/21/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
07/21/2026
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
07/20/2026
Permit issued — Supported Scaffold
B01423323-I1-SF
07/17/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 483 CARLTON AVENUE BROOKLYN, NY AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01423323-I1
06/26/2026
Special inspection requirement — Post-installed Anchors
WALIUR RAHMAN
05/28/2026
Permit issued — General Construction
B01168086-I1-GC
05/28/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/02/2026
Filed — Alteration
Replacement of fire pump and jockey pump and installation of fire pump test header
B01335693-I1
02/06/2026
Signed off — Alteration
B00289644-I1
02/06/2026
Signed off — Alteration
B00244884-I1
02/04/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND FACADE INSPECTION AT 483 CARLTON AVENUE, BROOKLYN, NY 11238
B01292101-P2
02/04/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
02/04/2026
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
01/28/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01207750-P4
01/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01232821-P1
01/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01207750-P3
01/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01207754-P3
01/27/2026
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
01/26/2026
Permit issued — Construction Fence
B00289644-I1-FN
01/26/2026
Permit issued — Sidewalk Shed
B00244884-I1-SH
01/26/2026
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
01/23/2026
Signed off — Alteration
B01220195-I1
01/23/2026
Permit issued — Sidewalk Shed
B01207750-I1-SH
01/23/2026
Permit issued — Supported Scaffold
B01232821-I1-SF
01/23/2026
Permit issued — Construction Fence
B01207754-I1-FN
12/18/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND FACADE INSPECTION AT 483 CARLTON AVENUE, BROOKLYN, NY 11238
B01292101-P1
12/18/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
12/18/2025
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Leonid Kuzmin
12/17/2025
Special inspection requirement — Standpipe Systems
Leonid Kuzmin
12/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
Alexander Bomstein
11/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Zahid Ismail
11/28/2025
Special inspection requirement — Post-installed Anchors
Zahid Ismail
11/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Zahid Ismail
11/28/2025
Special inspection requirement — Masonry
Zahid Ismail
11/28/2025
Special inspection requirement — Final
Zahid Ismail
11/25/2025
Filed — Alteration
FACADE RESTORATION AS INDICATED ON DRAWINGS. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01168086-P1
11/25/2025
Special inspection requirement — Post-installed Anchors
Zahid Ismail
11/25/2025
Special inspection requirement — Masonry
Zahid Ismail
11/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Zahid Ismail
11/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/25/2025
Special inspection requirement — Final
Zahid Ismail
11/03/2025
Cycle 10 facade report submitted
11/03/2025
Cycle 10 facade report signed — UNSAFE
10/14/2025
Violation issued (ECB, closed)
Boilers
10/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01207750-P2
10/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01207754-P2
10/02/2025
Permit issued — Suspended Scaffold
B01292101-I1-SC
09/26/2025
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND FACADE INSPECTION AT 483 CARLTON AVENUE, BROOKLYN, NY 11238
B01292101-I1
09/25/2025
Cycle 10 facade inspection completed
09/23/2025
Objection resolved — Addressed
Latest 60 of 178 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
P K CONTRACTING1109/13/2026
NYCHA6508/26/2026
NYC HOUSING AUTHORITY1803/22/2026
NYC HOUSING AUTHORITY 9103/22/2026
NYCHA 99603/22/2026
PIONEER GENERAL CONST CO103/22/2026
NEW YORK CITY HOUSING AUTHORITY303/22/2026
NYCHA 9 99303/22/2026
NEELAM CONSTRUCTION303/21/2026
NYC HOUSING AUTH403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AK CONSULTING SERVICES, INC107/17/2026
DOKA ENGINEERING PC103/02/2026
JOEL PHAGOO P.E. PLLC1401/28/2026
ZI ENGINEERING, P.C211/25/2025
SUPERSTRUCTURES ENG. + ARCH.107/05/2022
IKRA CONSULTING LLC112/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES1203/21/2026
SUPERSTRUCTURES ENG + ARCH103/21/2026
JOEL PHAGOO P.E. PLLC203/21/2026
RI CONSULTING SERVICES203/21/2026
JOEL PHAGOO P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor2207/08/2026
MNK ENTERPRISES LLCGeneral Contractor1008/26/2026
P & K CONTRACTING INCGeneral Contractor707/08/2026
HYLAN DATACOM & ELECL LLCElectrical103/22/2026
LIT MODE ELECL CONTG INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198808/06/2026
DOKA ENGINEERING PC1158103/02/2026
A&B WORLD CONSULTING, INC5704103/02/2026
JOEL PHAGOO ,PE, PLLC2416501/27/2026
ZI ENGINEERING, PC4655211/25/2025
RI CONSULTING SERVICES IN8904109/02/2025
IKRA CONSULTING LLC7032112/19/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedP&K CONTRACTING INC09/10/2026
DOB NOWSuspended ScaffoldPermit IssuedWALL CONTRACTOR CORP07/28/2026
DOB NOWSupported ScaffoldPermit IssuedMNK ENTERPRISES LLC07/20/2026
DOB NOWGeneral ConstructionPermit IssuedP & K CONTRACTING INC05/28/2026
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/26/2026
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC01/26/2026
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES LLC01/23/2026
DOB NOWSupported ScaffoldPermit IssuedMNK ENTERPRISES LLC01/23/2026
DOB NOWConstruction FencePermit IssuedMNK ENTERPRISES LLC01/23/2026
DOB NOWSuspended ScaffoldPermit IssuedWALL CONTRACTOR CORP10/02/2025
DOB NOWSuspended ScaffoldPermit IssuedD&N CONST & CONSULTNG INC09/02/2025
DOB NOWGeneral ConstructionPermit IssuedP & K CONTRACTING INC07/14/2025
DOB NOWSupported ScaffoldSigned-offP & K CONTRACTING INC07/11/2025
DOB NOWConstruction FencePermit IssuedP & K CONTRACTING INC06/25/2025
DOB NOWSidewalk ShedPermit IssuedP & K CONTRACTING INC06/25/2025
DOB NOWSupported ScaffoldPermit IssuedP & K CONTRACTING INC05/29/2025
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES LLC04/09/2025
DOB NOWConstruction FencePermit IssuedMNK ENTERPRISES LLC04/09/2025
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/13/2025
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC01/13/2025
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/03/2025
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC11/22/2024
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/08/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/04/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/24/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/21/2022
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/04/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/08/2021
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC02/04/2021
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC12/24/2020
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/03/2020
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/03/2020
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC12/20/2019
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC10/15/2019
BISEQISSUEDTALICO CONTRACTING INC01/11/2018
BISEQISSUEDTALICO CONTRACTING INC01/17/2017
BISEQISSUEDTALICO CONTRACTING INC01/26/2016
BISEQISSUEDNEELAM CONSTRUCTION CORP01/26/2016
BISEQISSUEDMETRO. BRIDGE & SCAF. COR09/11/2014
BISEQISSUEDNAVICO B & S CONSTRUCTION08/14/2014
+ 24 more permits on file
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
08/06/2026Post-installed AnchorsMAHFUZAR RAHMANspecial
08/06/2026Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
07/21/2026Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
07/21/2026Post-installed AnchorsMAHFUZAR RAHMANspecial
06/26/2026Post-installed AnchorsWALIUR RAHMANspecial
02/04/2026Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
02/04/2026Post-installed AnchorsMAHFUZAR RAHMANspecial
01/27/2026Post-installed AnchorsJOEL PHAGOOspecial
01/26/2026Post-installed AnchorsJOEL PHAGOOspecial
12/18/2025Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
12/18/2025Post-installed AnchorsMAHFUZAR RAHMANspecial
12/17/2025Fire-Resistant Penetrations and JointsLeonid Kuzminspecial
12/17/2025Standpipe SystemsLeonid Kuzminspecial
12/17/2025Tenant Protection Plan ComplianceAlexander Bomsteinspecial
11/28/2025Tenant Protection Plan ComplianceZahid Ismailspecial
11/28/2025Post-installed AnchorsZahid Ismailspecial
11/28/2025Structural Stability – Alterations of existing buildingsZahid Ismailspecial
11/28/2025MasonryZahid Ismailspecial
11/28/2025FinalZahid Ismailprogress
11/25/2025Post-installed AnchorsZahid Ismailspecial
11/25/2025MasonryZahid Ismailspecial
11/25/2025Structural Stability – Alterations of existing buildingsZahid Ismailspecial
11/25/2025Tenant Protection Plan Compliance—special
11/25/2025FinalZahid Ismailprogress
08/27/2025Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
Latest 25 of 33.
▾Documents — 266 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch27
08/29/2026B00762375-I1Request digital key ↗
08/23/2026B01168086-P1Request digital key ↗
08/23/2026B01168086-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00289644-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00244884-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00284487-I1Request digital key ↗
▸Applications & Permits32
▸BISWORK PERMIT APPLICATION18
10/02/2019340344960Open ↗
10/09/2018340344960Open ↗
01/11/2018340344960Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
02/05/2020340716407Open ↗
01/17/2020340714267Open ↗
10/04/2018321848186Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications82
▸DOB NOWSpecial Inspector Seal & Signature24
09/25/2026B01278276-I1Open ↗
09/25/2026B01278276-I1Open ↗
09/01/2026B01292101-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/23/2026B01168086-I1Open ↗
08/22/2026B01207750-P1Open ↗
08/22/2026B01207750-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
10/24/2019340344960Open ↗
10/24/2019340344997Open ↗
10/04/2018321848186Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
02/06/2012320425036Open ↗
09/29/2011320371325Open ↗
12/11/2009320110269Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
02/06/2012320425036Open ↗
09/29/2011320371325Open ↗
12/11/2009320110269Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
02/05/2020340716407Open ↗
01/17/2020340714267Open ↗
01/22/2016340344997Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
02/05/2020340716407Open ↗
01/17/2020340714267Open ↗
01/22/2016340344997Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
02/05/2020340716407Open ↗
01/17/2020340714267Open ↗
01/22/2016340344997Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026B00762375-I1Open ↗
08/25/2026B01168086-I1Open ↗
08/25/2026B01168086-P1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
09/18/2009320073166Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan3
08/13/2026B00289644-I1Open ↗
08/13/2026B00244884-I1Open ↗
08/13/2026B00284487-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
02/05/2020340716407Open ↗
01/17/2020340714267Open ↗
▸Environmental & Asbestos7
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
09/29/2011320371325Open ↗
09/18/2009320073166Open ↗
04/17/2009320008460Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
12/11/2009320110269Open ↗
11/14/2008310230416Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/17/2020340714267Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026B01335693-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY2
09/29/2011320371325Open ↗
09/29/2011320371325Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/17/2020340714267Open ↗
▸BISNYCECC ANALYSIS1
01/17/2020340714267Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/17/2020340714267Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/17/2020340714267Open ↗
01/22/2016340344997Open ↗
01/22/2016340344960Open ↗
▸Approvals, Objections & Sign-offs49
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
08/23/2026B01168086-I1Open ↗
08/21/2026B01220195-I1Open ↗
08/21/2026B01269724-I1Open ↗
Showing 3 of 25 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
09/12/2014310230416Open ↗
09/12/2014310230416Open ↗
10/08/2013310230416Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
02/06/2012320425036Open ↗
09/29/2011320371325Open ↗
12/11/2009320110269Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/24/2019340344960Open ↗
10/24/2019340344997Open ↗
12/23/2014310230416Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026B00289644-I1Open ↗
08/13/2026B00244884-I1Open ↗
08/13/2026B00284487-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026B00289644-I1Open ↗
08/13/2026B00244884-I1Open ↗
08/13/2026B00284487-I1Open ↗
▸BISSUPERSEDING LETTER1
10/09/2018340344960Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B01168086-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
02/05/2020340716407Open ↗
01/17/2020340714267Open ↗
10/04/2018321848186Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms23
▸BISEFILING COVER SHEET7
10/04/2018321848186Open ↗
02/06/2012320425036Open ↗
09/29/2011320371325Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWAI1 Form (from plan PDF)7
08/16/2026B01207750-P2Open ↗
08/16/2026B01207750-P3Open ↗
08/16/2026B01207750-P1Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
02/05/2020340716407Open ↗
01/17/2020340714267Open ↗
01/22/2016340344997Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
06/23/2014320371325Open ↗
03/30/2012320371325Open ↗
03/14/2012320371325Open ↗
▸BISBOROUGH INTAKE FORM2
10/24/2019340344960Open ↗
10/24/2019340344997Open ↗
▸Other Documents22
▸DOB NOWCalculations11
08/18/2026B01292101-P4Open ↗
08/18/2026B01292101-I1Open ↗
08/14/2026B01292101-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWManufacturer's Specifications10
08/18/2026B01292101-P4Open ↗
08/14/2026B01292101-P3Open ↗
08/13/2026B01277274-I1Open ↗
Showing 3 of 10 on file for this type
▸BISOP-4 - Special Report1
12/23/2014310230416Open ↗