← Back
Elevator cooperative
The Vermeer
61 7 AVENUE · BIN 1014515
💬 Discuss this project
1963Year Built
21Stories
D4Building Class
C6-3AZoning
371,863 sfGross Floor Area
361Units
LL97 CoveredRent Stabilized5 Open Violations 4 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: THE VERMEER OWNERS INC · 25,812 sf lot · 14.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 5 docs
Floor 211p · 1 filing · 3 docs
Floor 20
Floor 191p · 1 filing · 3 docs
Floor 18
Floor 17
Floor 16Under Construction15p · 2 filings · 16 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 105p · 1 filing · 10 docs
Floor 9
Floor 8
Floor 7
Floor 617p · 4 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 9 docs
Cellar3p · 2 filings · 18 docs
Sub-Cellar4p · 2 filings · 20 docs
Basement1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERMEERS OWNERS14303/22/2026
THE VENEER OWNERS INC C/O103/22/2026
ORSID REALTY CORP 2FL103/22/2026
ORSIDREALTY CORP / MONEY103/22/2026
ORSID REALTY2903/22/2026
VERMUR OWNERS CORP.103/22/2026
UERMEER OWNERS COOP CORPS103/22/2026
VECTRA CONSTRUCTION203/22/2026
BROWN HARRIS STEVENS103/22/2026
VEMEER OWNERS703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
J A EXPEDITING403/21/2026
DAVID JIMENEZ RA803/21/2026
ANTHONY CUCICH ARCHITECT603/21/2026
BOYD CONSULTING403/21/2026
DOMANI CONSULTING203/21/2026
EUROCELT EXPEDITING, INC603/21/2026
LAM & LAM DESIGNS DPC203/21/2026
FOURTH STREET DESIGN BUILD203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BREND RESTORATION LLCGeneral Contractor1207/08/2026
ENER-CON TECHNICAL SERVICGeneral Contractor603/21/2026
LAKE CONTRACTING LLCGeneral Contractor603/21/2026
WILLOWFIELD DEVELOPMENTGeneral Contractor407/08/2026
360 PRESTIGE CONTRACTINGGeneral Contractor303/21/2026
RM ELECTRIC CO., INC.Electrical303/22/2026
HOME WORK ADDITIONS & RENGeneral Contractor207/08/2026
VALENTIS ELECTRIC, INC.Electrical203/22/2026
WILLIAM HERMANElectrical203/21/2026
HERMAN WILLIAMElectrical203/21/2026
METROPOLITAN MECHANICAL CGeneral Contractor203/21/2026
WILLIAM LAROSAElectrical203/21/2026
AFGO MECHANICAL SVCS INCGeneral Contractor203/21/2026
BENJAMIN DREBINElectrical203/21/2026
GSA ELECTRIC CORP.Electrical203/22/2026
EMPIRE GROUP NYC LLCGeneral Contractor107/08/2026
GURRI INSTALLATION INCGeneral Contractor107/08/2026
KC EXPEDITING INCGeneral Contractor104/09/2026
LD DESIGN CONTRUCTION INCGeneral Contractor107/08/2026
METRO MECHANICAL LLCGeneral Contractor107/08/2026
MOSQUERA CONTRACTING INCGeneral Contractor107/08/2026
NOOR MECHANICAL SERVICESGeneral Contractor107/08/2026
RADISA MLADENOVICGeneral Contractor107/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing106/28/2026
BENT MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN SOLUTIONS ENGINEERI5478211/11/2025
LAM&LAM DESIGNS DPC3563207/29/2025
EDG2578503/07/2024
MARK GOULD ARCHITECT1933101/25/2024
A2 ARCHITECT, PC2504208/25/2023
GREEN RIVER ENVIRONMENTAL7841202/02/2023
MARIN ARCHITECTS PC5722101/09/2023
SUNTECT LLC4788101/03/2023
H. A. BADER CONSULTANTS2332110/31/2022
MELONE ARCHITECTS2944105/18/2022
Building Lifecycle
All (248)Filed (44)Permit Issued (36)Signed Off (22)Facade (FISP) (12)Violation (60)Inspection (18)Objection (26)Special Inspection (30)
06/02/2026
Special inspection requirement — Final
Hany Rizkalla
06/01/2026
Permit issued — General Construction
M01322976-I1-GC
03/31/2026
Filed — Alteration
Combination of apartment 16 ST and 16U. Minor partition work and removal of second kitchen.
M01322976-P1
03/31/2026
Filed — Alteration
Combination of apartment 16 ST and 16U. Minor partition work and removal of second kitchen.
M01322976-P2
02/24/2026
Permit issued — Plumbing
M01322976-S1-PL
02/19/2026
Permit issued — General Construction
M01322976-I1-GC
01/28/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/26/2026
Filed — Alteration
Combination of apartment 16 ST and 16U. Minor partition work and removal of second kitchen.
M01322976-S1
01/26/2026
Objection resolved — Addressed
01/21/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/06/2026
Objection resolved — Addressed
01/04/2026
Objection raised — Scope
01/04/2026
Objection raised — Scope
12/12/2025
Filed — Alteration
Combination of apartment 16 ST and 16U. Minor partition work and removal of second kitchen.
M01322976-I1
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/11/2025
Filed — Alteration
Alterationof existing plumbing
M01133766-P1
11/11/2025
Filed — Alteration
Alterationof existing plumbing
M01133766-P2
11/10/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/22/2025
Permit issued — General Construction
M01133766-I1-GC
09/18/2025
Permit issued — Plumbing
M01133766-S1-PL
09/11/2025
Permit issued — Plumbing
M01257454-S1-PL
08/28/2025
Permit issued — General Construction
M01257454-I1-GC
08/12/2025
Objection resolved — Addressed
08/08/2025
Objection raised — Admin
07/31/2025
Objection resolved — Addressed
07/30/2025
Objection raised — Admin
07/29/2025
Filed — Alteration
REPLACE EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01257454-S1
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Lam
07/17/2025
Filed — Alteration
REPLACE EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01257454-I1
07/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Lam
07/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
Benjamin Lam
04/18/2025
Filed — Alteration
Alterationof existing plumbing
M01133766-I1
04/18/2025
Filed — Alteration
Alterationof existing plumbing
M01133766-S1
09/23/2024
Signed off — Alteration
MINOR INTERIOR PARTITION REMOVALS AND CONSTRUCTION IN CONJUNCTION WITH RENOVATION. INSTALL NEW LIGHTING. PLUMBING WORK FILED SEPARATELY. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
M00803742-I1
09/23/2024
Signed off — Alteration
MINOR INTERIOR PARTITION REMOVALS AND CONSTRUCTION IN CONJUNCTION WITH RENOVATION. INSTALL NEW LIGHTING. PLUMBING WORK FILED SEPARATELY. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
M00803742-S1
09/12/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/19/2024
Signed off — Alteration
Proposed Garage Repairs as per plans filed herewith. No Change in Egress, Occupancy, or Use
M08053715-I1
07/10/2024
Signed off — Alteration
M00652767-I1
06/26/2024
Signed off — Alteration
Installation of Temp. Shoring as per plans filed herewith. No Change in Use, Egress, or Occupancy
M08033358-I1
06/21/2024
Signed off — Alteration
M00981138-I1
06/06/2024
Signed off — Alteration
INTERIOR RENOVATION WORK AT APARTMENT 16G (16TH FLOOR), PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00995930-I1
05/24/2024
Signed off — Alteration
INSTALLATION OF NEW STEEL STRUCTURE TO SUPPORT SOLAR PANELS AS SHOWN ON DRAWINGS AND SPECIFIED. SOLAR PANELS TO BE FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00734580-I1
03/14/2024
Permit issued — General Construction
M00995930-I1-GC
03/07/2024
Filed — Alteration
Proposed Garage Repairs as per plans filed herewith. No Change in Egress, Occupancy, or Use
M08053715-P2
03/07/2024
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
03/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
03/07/2024
Special inspection requirement — Post-installed Anchors
Anthony Stasio
03/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
ROBERT MASONE
03/07/2024
Special inspection requirement — Structural Steel - Welding
Anthony Stasio
03/07/2024
Special inspection requirement — Final
Anthony Stasio
03/05/2024
Filed — Alteration
MINOR INTERIOR PARTITION REMOVALS AND CONSTRUCTION IN CONJUNCTION WITH RENOVATION. INSTALL NEW LIGHTING. PLUMBING WORK FILED SEPARATELY. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION.
M00803742-P1
02/21/2024
Permit issued — General Construction
M00981138-I1-GC
02/12/2024
Signed off — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT 18T LOCATED ON THE 18TH FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M00922065-S1
02/12/2024
Signed off — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT 18T LOCATED ON THE 18TH FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M00922065-I1
Latest 60 of 248 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHOME WORK ADDITIONS & REN06/01/2026
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP02/24/2026
DOB NOWGeneral ConstructionPermit IssuedHOME WORK ADDITIONS & REN02/19/2026
DOB NOWGeneral ConstructionPermit IssuedKC EXPEDITING INC09/22/2025
DOB NOWPlumbingPermit IssuedTAP PLUMBING CORP09/18/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG09/11/2025
DOB NOWGeneral ConstructionSigned-offNOOR MECHANICAL SERVICES08/28/2025
DOB NOWGeneral ConstructionSigned-offLD DESIGN CONTRUCTION INC03/14/2024
DOB NOWGeneral ConstructionSigned-offGURRI INSTALLATION02/21/2024
DOB NOWGeneral ConstructionSigned-offBREND RESTORATION LLC02/06/2024
DOB NOWStructuralSigned-offBREND RESTORATION LLC02/06/2024
DOB NOWGeneral ConstructionSigned-offMOSQUERA CONTRACTING INC09/06/2023
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP08/31/2023
DOB NOWGeneral ConstructionSigned-offMETRO MECHANICAL LLC07/31/2023
DOB NOWPlumbingSigned-offSTIVAN PLBG & HTG INC07/17/2023
DOB NOWStructuralSigned-offLAKE CONTRACTING LLC07/14/2023
DOB NOWGeneral ConstructionSigned-offAIDEN HVAC MECHANICAL INC02/28/2023
DOB NOWGeneral ConstructionSigned-offRADISA MLADENOVIC02/06/2023
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL02/03/2023
DOB NOWStructuralSigned-offLAKE CONTRACTING LLC01/17/2023
DOB NOWGeneral ConstructionSigned-off360 PRESTIGE CONTRACTING11/28/2022
DOB NOWPlumbingSigned-offINNOVATION PLUMBING LLC11/25/2022
DOB NOWGeneral ConstructionSigned-offWILLOWFIELD DEVELOPMENT12/14/2021
DOB NOWSupported ScaffoldSigned-offBREND RESTORATION LLC10/20/2021
DOB NOWSidewalk ShedSigned-offBREND RESTORATION LLC10/19/2021
DOB NOWGeneral ConstructionSigned-offWILLOWFIELD DEVELOPMENT10/08/2021
DOB NOWGeneral ConstructionSigned-offWILLOWFIELD DEVELOPMENT08/19/2021
DOB NOWMechanical SystemsSigned-offENER-CON TECHNICAL SERVIC08/17/2021
DOB NOWMechanical SystemsSigned-offENER-CON TECHNICAL SERVIC08/13/2021
DOB NOWPlumbingPermit IssuedKATAN P & H INC03/30/2021
DOB NOWGeneral ConstructionPermit IssuedEMPIRE GROUP NYC LLC01/22/2021
DOB NOWSupported ScaffoldSigned-offBREND RESTORATION LLC10/23/2020
DOB NOWSidewalk ShedSigned-offBREND RESTORATION LLC10/22/2020
DOB NOWMechanical SystemsSigned-offMETROPOLITAN MECHANICAL C10/02/2020
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/12/2020
DOB NOWMechanical SystemsSigned-offAFGO MECHANICAL SVCS12/14/2019
BISPLISSUEDTAP PLUMBING CORP04/18/2024
BISOTISSUEDBROOKLYN SOLARWORKS LLC11/02/2023
BISPLISSUEDPLUMBING & HTG DOCTOR INC04/12/2022
BISOTISSUEDBREND RESTORATION LLC03/24/2022
+ 46 more permits on file
5 projects · most recent 03/31/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/31/2026Permit IssuedA&H EXPRESS PLBG&HTG CORPGas, Water/Sanitary
11/11/2025Permit IssuedTAP PLUMBING CORPGas, Water/Sanitary
07/29/2025Signed-offJOHN FITZGERALD PLBG &HTGWater/Sanitary
03/16/2021——Gas
01/06/2021Permit IssuedKATAN P & H INCGas, Water/Sanitary
25 projects · most recent 05/04/2026
General Wiring
FiledStatusContractorScope
05/04/2026Permit IssuedELECTRIC ESSENTIALS CORPGeneral Wiring
03/01/2026Permit IssuedJRS ELECTRIC INC—
02/26/2026Permit IssuedELECTRICIAN NYC LLCGeneral Wiring
02/11/2026Permit IssuedITZ ELECTRIC CORPGeneral Wiring
11/24/2025Permit IssuedPOWER CONDUCTOR ELECTRICGeneral Wiring
11/20/2025CompleteGIA ELECTRICAL CORP—
11/04/2025CompleteVALLEY ELECTRIC OF NY INC—
09/15/2025CompletePOWER CONDUCTOR ELECTRICGeneral Wiring
08/27/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/11/2025CompleteVALLEY ELECTRIC OF NY INC—
11/03/2024Permit IssuedA & S MASTER ELEC'L CORPGeneral Wiring
10/22/2024CompleteRM ELECTRIC CO., INC.General Wiring
07/17/2024CompleteANI ELECTRIC CORPGeneral Wiring
06/20/2024CompleteANI ELECTRIC CORP—
05/20/2024Permit IssuedRM ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
01/28/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/21/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
06/02/2026FinalHany Rizkallaprogress
07/28/2025Fire-Resistant Penetrations and JointsBenjamin Lamspecial
07/17/2025Fire-Resistant Penetrations and JointsBenjamin Lamspecial
07/17/2025Tenant Protection Plan ComplianceBenjamin Lamspecial
03/07/2024Tenant Protection Plan ComplianceROBERT MASONEspecial
03/07/2024Concrete - Cast-In-PlaceAnthony Stasiospecial
03/07/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
03/07/2024Structural Steel - WeldingAnthony Stasiospecial
03/07/2024FinalAnthony Stasioprogress
03/07/2024Post-installed AnchorsAnthony Stasiospecial
01/02/2024Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
01/02/2024Concrete - Cast-In-PlaceAnthony Stasiospecial
01/02/2024Post-installed AnchorsAnthony Stasiospecial
01/02/2024Structural Steel - WeldingAnthony Stasiospecial
01/02/2024Tenant Protection Plan Compliance—special
01/02/2024FinalAnthony Stasioprogress
11/30/2023Tenant Protection Plan ComplianceNicholas Melonespecial
08/24/2023FinalAnthony Stasioprogress
08/24/2023Tenant Protection Plan ComplianceROBERT MASONEspecial
08/24/2023Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
08/21/2023Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
08/21/2023Tenant Protection Plan Compliance—special
08/21/2023FinalAnthony Stasioprogress
08/19/2023Energy Code Compliance InspectionsAnn Macklinprogress
08/19/2023Lighting in dwelling unitsAnn Macklinenergy_progress
Latest 25 of 62.
▾Documents — 1,104 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch35
09/04/2026M00485745-I1Request digital key ↗
09/04/2026M00485520-I1Request digital key ↗
09/03/2026M00510805-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00445860-I1Request digital key ↗
09/04/2026M00452413-P1Request digital key ↗
09/04/2026M00452413-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00448320-I1Request digital key ↗
08/15/2026M00448320-P1Request digital key ↗
08/14/2026M00329095-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00230325-I1Request digital key ↗
09/04/2026M00396503-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00412537-I1Request digital key ↗
08/15/2026M00412537-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00415743-I1Request digital key ↗
▸Applications & Permits180
▸BISWORK PERMIT APPLICATION97
04/19/2024100782253Open ↗
11/02/2023141024834Open ↗
04/13/2022122973005Open ↗
Showing 3 of 97 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION83
05/22/2024100782253Open ↗
02/22/2024100782253Open ↗
11/02/2023141024834Open ↗
Showing 3 of 83 on file for this type
▸Seals & Professional Certifications231
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION102
04/29/2020140814929Open ↗
01/24/2020123356947Open ↗
01/24/2020123356947Open ↗
Showing 3 of 102 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature46
09/05/2026M00230325-I1Open ↗
09/05/2026M00329095-I1Open ↗
09/04/2026M00452413-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/23/2026M08053715-I1Open ↗
09/02/2026M00922065-I1Open ↗
09/02/2026M00922065-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026M08053715-I1Open ↗
09/23/2026M08053715-I1Open ↗
09/02/2026M00922065-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
01/21/2020140814929Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/25/2021140997642Open ↗
11/12/2020140974293Open ↗
11/15/2018140814929Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
01/25/2021140997642Open ↗
11/12/2020140974293Open ↗
11/15/2018140814929Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
01/25/2021140997642Open ↗
11/12/2020140974293Open ↗
11/15/2018140814929Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
11/01/2023141024834Open ↗
09/30/2020140950941Open ↗
03/05/2020140889545Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment99
▸BISSELF-CERT PLUMBING NOTICE42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISSCHEDULE B - PLUMBING31
05/22/2024100782253Open ↗
11/15/2018140814929Open ↗
Showing 2 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection22
▸BISTenant Protection Plan and Notes12
05/14/2021140950941Open ↗
11/12/2020140974293Open ↗
03/05/2020140889545Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTenant Protection Plan6
09/05/2026M00230325-I1Open ↗
08/14/2026M00329095-I1Open ↗
08/13/2026M00412537-P1Open ↗
Showing 3 of 6 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
06/07/2018123356947Open ↗
Showing 1 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos83
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
09/04/2026M00452413-I1Open ↗
09/04/2026M00452413-P1Open ↗
09/04/2026M00485745-I1Open ↗
Showing 3 of 32 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)27
11/02/2023141024834Open ↗
09/30/2020140950941Open ↗
03/05/2020140889545Open ↗
Showing 3 of 27 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/21/2026M01133766-I1Open ↗
08/21/2026M01133766-S1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance97
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS44
04/29/2020140814929Open ↗
01/13/2020123356947Open ↗
01/13/2020123356947Open ↗
Showing 3 of 44 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS23
09/25/2024141024834Open ↗
11/10/2022140950941Open ↗
11/25/2020140889545Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
09/25/2024141024834Open ↗
11/02/2023141024834Open ↗
11/01/2023141024834Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026M00556511-I1Open ↗
08/13/2026M00510805-I1Open ↗
08/13/2026M00445860-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/15/2018140814929Open ↗
06/07/2018140773241Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/10/2022122973005Open ↗
05/10/2022122973005Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
11/01/2023141024834Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
10/16/2024141024834Open ↗
▸BISINTERIOR LIGHTING POWER1
05/10/2022122973005Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/10/2022122973005Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY20
09/25/2024141024834Open ↗
11/02/2023141024834Open ↗
11/01/2023141024834Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING3
01/24/2020123356947Open ↗
01/24/2020123356947Open ↗
01/13/2020123356947Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
07/05/2024100782253Open ↗
07/25/2022101946744Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/24/2022122973005Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
07/05/2024100782253Open ↗
▸Approvals, Objections & Sign-offs91
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST50
10/16/2024141024834Open ↗
07/05/2024100782253Open ↗
12/12/2022140974293Open ↗
Showing 3 of 50 on file for this type
▸BISADMINISTRATIVE OBJECTIONS23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
10/16/2024141024834Open ↗
04/13/2022122973005Open ↗
11/25/2020140889545Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
05/10/2022122973005Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership110
▸BISCOST AFFIDAVIT105
09/25/2024141024834Open ↗
11/01/2023141024834Open ↗
11/22/2022140950941Open ↗
Showing 3 of 105 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/28/2022122973005Open ↗
▸Filing & Intake Forms101
▸BISEFILING COVER SHEET41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISADDITIONAL INFORMATION36
06/14/2022140950941Open ↗
05/19/2021140950941Open ↗
05/13/2021140950941Open ↗
Showing 3 of 36 on file for this type
▸BISBOROUGH INTAKE FORM16
04/19/2024100782253Open ↗
04/13/2022122973005Open ↗
04/29/2020140814929Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
11/01/2023141024834Open ↗
01/25/2021140997642Open ↗
11/12/2020140974293Open ↗
Showing 3 of 8 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* FIRE STOPS 27-3451
07/05/2024100782253Open ↗