← Back
BuildNYC
Office with commercial, 7-19 stories
78 5TH AVENUE
MANHATTAN · Greenwich Village · BIN 1009718
💬 Discuss this project
1900Year Built
10Stories
O6Building Class
C6-4MZoning
32,100 sfGross Floor Area
7Units
LL97 Covered0 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: Amdar Company · 3,219 sf lot · 9.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsIgor Kletsman M.D.1 filing
RoofHu Kitchen2p · 3 filings · 20 docs
Floor 9SKIN by CLEAR CLINICUnder Construction2 filings · 10 docs
Floor 8
Floor 7Installation of plumbing fixtures1p · 1 filing · 3 docs
Floor 6
Floor 5Hu Products1p · 2 filings · 6 docs
Floor 4
Floor 3
Floor 2
Floor 1Ariston Floral Boutique2 filings · 13 docs
MezzanineAriston Floral Boutique6p · 2 filings · 13 docs
CellarAriston Floral BoutiqueUnder Construction5p · 3 filings · 16 docs
Site & exteriorMaterial hoist on pipe scaffold5 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Amdar Company3403/22/2026
Admar Co1503/21/2026
First & 73809/01/2026
Lineal Construction and Restoration407/08/2026
Metro Real Estate Co210/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Robert Germain Jr. PE109/18/2026
Chong208/18/2026
Adal Engineering205/18/2026
Bitopi Consultants106/22/2023
Rosenthal106/21/2023
Ashraf406/07/2023
Stefano Morisi R.A306/02/2022
Kindo405/26/2022
Rodriguez Studio Architecture202/11/2020
Gibbons Engineering212/05/2019
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Steel SystemsScaffold1607/08/2026
George BassolinoPlumbing903/21/2026
Chief Fire Prevention & MechanicalGeneral Contractor207/08/2026
ES Decor and DesignGeneral Contractor203/21/2026
Green Apple Electrical ServicesElectrical203/22/2026
Integrate Comfort SystemGeneral Contractor107/08/2026
Prodigy ConstructionGeneral Contractor107/08/2026
Seoul Interior & BuildersGeneral Contractor108/26/2026
Lineal Construction & RestorationScaffold107/08/2026
Accurate MechanicalPlumbing107/08/2026
G.bassolino PlumbingFire Protection107/08/2026
Power Plumbing & HeatingPlumbing108/26/2026
Smart Plumbing & HeatingPlumbing107/08/2026
Century ElectricElectrical103/21/2026
VMC Plumbing & HeatingPlumbing107/08/2026
John H. MooreElectrical103/21/2026
Maximum Electrical ContractingElectrical103/21/2026
C C Controlled CombustionGeneral Contractor109/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Robert F. Germain Jr. PE5100109/18/2026
Chong Engineering7411208/18/2026
Adal Engineering4205205/18/2026
Bitopi Consultants7036106/22/2023
Ryan Special Engineering2018106/21/2023
Dyo Design Office6701306/02/2022
M. International Engineering3129205/26/2022
Zarina Kindo, RA4900103/05/2022
NS Engineers1442212/05/2019
Building Lifecycle
All (172)Filed (22)Permit Issued (19)Signed Off (8)Facade (FISP) (12)Violation (60)Inspection (5)Objection (16)Special Inspection (30)
09/28/2026
Permit issued — General Construction
M01445480-I1-GC
09/18/2026
Filed — Alteration
REMOVE EXISTING OIL TANK. STRAIGHT GAS ONLY. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01445480-I1
08/25/2026
Permit issued — Plumbing
M01446086-S1-PL
08/25/2026
Permit issued — General Construction
M01446086-I1-GC
08/18/2026
Filed — Alteration
interior fit-out new skin clinic. No change in use, egress and occupancy.
M01446086-S1
08/18/2026
Filed — Alteration
interior fit-out new skin clinic. No change in use, egress and occupancy.
M01446086-I1
08/14/2026
Special inspection requirement — Energy Code Compliance Inspections
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
08/14/2026
Special inspection requirement — Sprinkler Systems
Tae Chong
08/14/2026
Special inspection requirement — Interior lighting power
08/14/2026
Special inspection requirement — Lighting controls
08/14/2026
Special inspection requirement — Final
05/18/2026
Filed — Alteration
Installation of 8 Ton multizone HVAC system on 9th floor with associated condensers on the roof as per plans attached herewith. No change in use, egress and occupancy.
M01379566-I1
04/29/2025
Signed off — Alteration
Installation of 8 Ton multizone HVAC system on 5th floor as per plans attached herewith. No change in use, egress and occupancy.
M01027617-I1
03/27/2025
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00262615-I1
03/27/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00269696-I1
11/18/2024
Permit issued — Mechanical Systems
M01027617-I1-MS
11/16/2024
Filed — Alteration
Installation of 8 Ton multizone HVAC system on 5th floor as per plans attached herewith. No change in use, egress and occupancy.
M01027617-I1
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
11/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
Dariusz Makara
11/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
Dariusz Makara
11/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Dariusz Makara
11/12/2024
Special inspection requirement — Permanent certificate
Dariusz Makara
03/28/2024
Special inspection requirement — Mechanical Systems
Dariusz Makara
03/28/2024
Special inspection requirement — Final
Dariusz Makara
08/15/2023
Signed off — Alteration
Removal of sprinkler heads and piping. No change in egress, use or occupancy.
M00891321-I1
07/14/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/11/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/11/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/23/2023
Permit issued — Supported Scaffold
M00894074-I1-SF
06/22/2023
Filed — Alteration
INSTALLATION OF MATERIAL HOIST ON TOP OF PIPE SCAFFOLD AT 78 5TH AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00894074-I1
06/22/2023
Permit issued — Sprinklers
M00891321-I1-EW-SP
06/22/2023
Special inspection requirement — Post-installed Anchors
KAMRUL AHSAN
06/21/2023
Filed — Alteration
Removal of sprinkler heads and piping. No change in egress, use or occupancy.
M00891321-I1
06/07/2023
Filed — Alteration
M00882810-I1
06/07/2023
Permit issued — Supported Scaffold
M00882810-I1-SF
06/04/2023
Permit issued — Sidewalk Shed
M00882786-I1-SH
06/03/2023
Filed — Alteration
M00882786-I1
05/30/2023
Signed off — Alteration
Plumbing work at cellar, 1st and Mezzanine indicated on drawings filed herewith No change in Use Egress or Occupancy under this application
M00712835-I1
05/09/2023
Signed off — Alteration
M00701062-I1
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2022
Signed off — Alteration
Installation of plumbing fixtures in conjunction with Alt 1 application M00659347
M00678906-I1
06/02/2022
Filed — Alteration
Plumbing work at cellar, 1st and Mezzanine indicated on drawings filed herewith No change in Use Egress or Occupancy under this application
M00712835-P1
06/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
stefano morisi
06/02/2022
Special inspection requirement — Energy Code Compliance Inspections
stefano morisi
06/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
stefano morisi
06/01/2022
Special inspection requirement — Final
NANIK MASSAND
06/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
06/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
NANIK MASSAND
06/01/2022
Special inspection requirement — Lighting controls
NANIK MASSAND
06/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
NANIK MASSAND
06/01/2022
Special inspection requirement — Mechanical Systems
NANIK MASSAND
06/01/2022
Special inspection requirement — Interior lighting power
NANIK MASSAND
05/26/2022
Filed — Alteration CO
Installation of non-bearing partitions to convert space on the 7th Floor from the dancing studio to medical office. Installation of HVAC Systems and Plumbing fixtures. Change CO to show Medical Office on the 7th Floor
M00659347-P2
05/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
stefano morisi
05/26/2022
Special inspection requirement — Energy Code Compliance Inspections
stefano morisi
05/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
stefano morisi
05/11/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2022
Permit issued — Plumbing
M00712835-I1-PL
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedC C Controlled Combustion09/28/2026
DOB NOWPlumbingPermit IssuedPower Plumbing & Heating08/25/2026
DOB NOWGeneral ConstructionPermit IssuedSeoul Interior & Builders08/25/2026
DOB NOWMechanical SystemsSigned-offIntegrate Comfort System11/18/2024
DOB NOWSupported ScaffoldPermit IssuedLineal Construction & Restoration06/23/2023
DOB NOWSprinklersSigned-offG.bassolino Plumbing06/22/2023
DOB NOWSupported ScaffoldPermit IssuedSteel Systems06/07/2023
DOB NOWSidewalk ShedPermit IssuedSteel Systems06/04/2023
DOB NOWPlumbingSigned-offM. Spinelli PLB & Heating04/28/2022
DOB NOWGeneral ConstructionSigned-offProdigy Construction04/12/2022
DOB NOWMechanical SystemsPermit IssuedES Decor Design03/02/2022
DOB NOWPlumbingSigned-offSmart Plumbing & Heating03/01/2022
DOB NOWSidewalk ShedSigned-offSteel Systems04/02/2020
DOB NOWSupported ScaffoldSigned-offSteel Systems04/01/2020
DOB NOWMechanical SystemsPermit IssuedChief Fire Prevention M01/14/2020
DOB NOWPlumbingSigned-offAnthony Disabato12/18/2019
DOB NOWSupported ScaffoldSigned-offSteel Systems11/22/2019
DOB NOWSidewalk ShedSigned-offSteel Systems11/13/2019
DOB NOWMechanical SystemsPermit IssuedChief Fire Prevention M10/07/2019
BISSPISSUEDG.bassolino Plumbing05/01/2023
BISSPISSUEDG.bassolino Plumbing04/12/2022
BISPLISSUEDG.bassolino Plumbing12/29/2020
BISSPISSUEDG.bassolino Plumbing12/29/2020
BISEQISSUEDGalicia Contracting & Restoration10/14/2020
BISOTISSUEDGalicia Contracting & Restoration07/08/2020
BISOTISSUEDGalicia Contracting & Restoration07/08/2020
BISSPISSUEDG.bassolino Plumbing12/02/2019
BISOTISSUEDCooper Works11/14/2019
BISPLISSUEDG.bassolino Plumbing10/21/2019
BISOTISSUEDGalicia Contracting & Restoration10/17/2019
BISFSISSUEDC C Controlled Combustion07/17/2017
BISFSISSUEDC C Controlled Combustion05/22/2017
BISPLISSUEDCC Controlled Plumbing Co05/22/2017
BISPLISSUEDOrbit Plumbing & Heating09/06/2016
BISPLISSUEDOrbit Plumbing & Heating08/11/2015
BISOTISSUEDK.J. Remodeling of NY Co*06/11/2015
BIS—ISSUEDSigns Cad12/06/2012
BISMHISSUEDFordham Refri & Air-Cond11/29/2012
BISMHISSUEDTmi Construction11/16/2012
BIS—ISSUEDCooper Works09/13/2012
+ 29 more permits on file
3 projects · most recent 05/18/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZSM48NL 4 tons · Condensing Unit ×2
05/26/2022Permit IssuedES Decor and DesignAir Conditioning Systems
Cooling
Cooper & Hunter CH-36LCU/O 36,000 BTU · Heat Pump Outdoor ×2
Mitsubishi Electric CGK030V2LS 36,000 BTU · Heat Pump Outdoor ×4
12/05/2019Permit IssuedChief Fire Prevention & MVentilation Systems—
1 project · most recent 08/18/2026
Sprinkler System
FiledStatusContractorScope
08/18/2026——Sprinkler System
1 project · most recent 08/18/2026
Water/Sanitary
FiledStatusContractorScope
08/18/2026Permit IssuedPower Plumbing & HeatingWater/Sanitary
11 projects · most recent 10/02/2026
General Wiring
FiledStatusContractorScope
10/02/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
09/01/2026Permit IssuedPower Electrical ContsGeneral Wiring
06/22/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
03/17/2026Permit IssuedCentury ElectricGeneral Wiring
12/14/2022CompleteTM Select Electric—
04/26/2022CompleteResponse ElectricGeneral Wiring
04/02/2022Permit IssuedKings Electric CoGeneral Wiring
05/04/2021CompleteResponse ElectricGeneral Wiring
09/24/2020CompleteGreen Apple Electrical ServicesGeneral Wiring
12/10/2019CompleteGreen Apple Electrical Services—
11/05/2019CompleteTop Shelf Electric—
1 project · most recent 06/22/2023
Scaffold
FiledStatusContractorScope
06/22/2023Permit IssuedLineal Construction & RestorationScaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
08/14/2026Energy Code Compliance Inspections—progress
08/14/2026Fire-Resistant Penetrations and Joints—special
08/14/2026Fire-Resistant Penetrations and JointsTae Chongspecial
08/14/2026Sprinkler SystemsTae Chongspecial
08/14/2026Interior lighting power—energy_progress
08/14/2026Lighting controls—energy_progress
08/14/2026Final—progress
11/12/2024Fire-Resistant Penetrations and JointsDariusz Makaraspecial
11/12/2024HVAC-R and service water heating equipmentDariusz Makaraenergy_progress
11/12/2024HVAC-R and service water heating system controlsDariusz Makaraenergy_progress
11/12/2024HVAC-R and service water piping design and insulationDariusz Makaraenergy_progress
11/12/2024Permanent certificateDariusz Makaraenergy_progress
03/28/2024Mechanical SystemsDariusz Makaraspecial
03/28/2024FinalDariusz Makaraprogress
06/22/2023Post-installed AnchorsKAMRUL AHSANspecial
06/02/2022HVAC-R and service water piping design and insulationstefano morisienergy_progress
06/02/2022Energy Code Compliance Inspectionsstefano morisiprogress
06/02/2022Fire-Resistant Penetrations and Jointsstefano morisispecial
06/01/2022FinalNANIK MASSANDprogress
06/01/2022HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
06/01/2022HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
06/01/2022Lighting controlsNANIK MASSANDenergy_progress
06/01/2022HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
06/01/2022Mechanical SystemsNANIK MASSANDspecial
06/01/2022Interior lighting powerNANIK MASSANDenergy_progress
Latest 25 of 48.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SKIN by CLEAR CLINICMedical / HealthcareFloor 9
Project M01446086 Alteration · Permit Issued · 08/18/2026
Ariston Floral BoutiqueRetailCellar, Floor 1, Mezzanine
Project M00701062 Alteration · LOC Issued · 04/07/2022
Project M00712835 Alteration · LOC Issued · 04/07/2022
Igor Kletsman M.DMedical / HealthcareCellar, Floors 1–9, Mezzanine
Project M00659347 Alteration CO · Permit Entire · 01/27/2022
Hu ProductsOfficeFloor 5
Project M00264723 Alteration · LOC Issued · 11/15/2019
Hu KitchenRestaurant / Food ServiceRoof
Project M00190690 Alteration · Permit Entire · 08/13/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 414 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch16
10/04/2026M01445480-I1Request digital key ↗
09/02/2026M00701062-I1Request digital key ↗
09/02/2026M00712835-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00190690-I1Request digital key ↗
08/15/2026M00190690-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00264723-I1Request digital key ↗
08/15/2026M00264723-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00269696-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00262615-I1Request digital key ↗
▸Applications & Permits62
▸BISPLAN / WORK APPROVAL APPLICATION29
03/28/2023123469996Open ↗
11/01/2021123469996Open ↗
09/29/2020140959586Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION28
10/14/2020140959586Open ↗
12/30/2019123785056Open ↗
12/02/2019123469996Open ↗
Showing 3 of 28 on file for this type
▸BISPLACE OF ASSEMBLY5
10/05/2016121334706Open ↗
09/26/2016121334706Open ↗
Showing 2 of 5 on file for this type
▸Seals & Professional Certifications109
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
11/14/2019123785056Open ↗
10/11/2019123785056Open ↗
03/08/2019123469996Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
10/03/2026M00190690-P1Open ↗
10/03/2026M00190690-P1Open ↗
10/03/2026M00190690-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/29/2026M01445480-I1Open ↗
09/05/2026M00269696-I1Open ↗
09/05/2026M00190690-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
10/03/2026M00190690-P1Open ↗
09/25/2026M01446086-S1Open ↗
08/31/2026M00190690-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
10/10/2012121397657Open ↗
Showing 1 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/12/2015122403942Open ↗
10/10/2012121397657Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
09/29/2020140959586Open ↗
05/19/2017140645345Open ↗
06/12/2015122403942Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/29/2020140959586Open ↗
05/19/2017140645345Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/29/2020140959586Open ↗
05/19/2017140645345Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment55
▸BISEQUIPMENT USE PERMITS15
12/08/2016120915484Open ↗
12/08/2016120915484Open ↗
12/08/2016120915484Open ↗
Showing 3 of 15 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT13
12/28/2012121393296Open ↗
10/25/2012120915484Open ↗
10/25/2012120915484Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING12
11/01/2021123469996Open ↗
05/19/2017140645345Open ↗
Showing 2 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
03/12/2014120915484Open ↗
Showing 1 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/28/2023123469996Open ↗
09/05/2018123469996Open ↗
06/12/2015122403942Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
05/19/2017140645345Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/29/2026M01445480-I1Open ↗
09/05/2026M00190690-I1Open ↗
09/02/2026M00701062-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
09/05/2018123469996Open ↗
05/19/2017140645345Open ↗
06/12/2015122403942Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
11/09/2012121423744Open ↗
10/18/2012121393296Open ↗
Showing 2 of 3 on file for this type
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
10/11/2019123785056Open ↗
09/05/2018123469996Open ↗
03/08/2018140645345Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
02/28/2022123469996Open ↗
12/11/2020123785056Open ↗
03/08/2018140645345Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/28/2022123469996Open ↗
12/11/2020123785056Open ↗
12/11/2020123785056Open ↗
▸BISTR8: Energy Code Progress Inspections3
10/05/2012120915484Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
09/02/2026M00712835-I1Open ↗
08/13/2026M00659347-I1Open ↗
08/13/2026M00701062-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/19/2017140645345Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
03/01/2022123469996Open ↗
02/28/2022123469996Open ↗
02/18/2022123469996Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs33
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
06/30/2023123469996Open ↗
06/06/2022123469996Open ↗
12/11/2020123785056Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
11/09/2012121423744Open ↗
10/18/2012121393296Open ↗
10/10/2012121397657Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
02/19/2019121397657Open ↗
03/08/2018140645345Open ↗
03/08/2018140645345Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT26
06/03/2022123469996Open ↗
06/02/2022123469996Open ↗
05/27/2022123469996Open ↗
Showing 3 of 26 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms39
▸BISEFILING COVER SHEET14
10/11/2019123785056Open ↗
09/05/2018123469996Open ↗
09/05/2018123469996Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM12
12/02/2019123469996Open ↗
10/22/2019123469996Open ↗
02/19/2019121397657Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION11
03/14/2023123469996Open ↗
11/19/2021123469996Open ↗
11/27/2020123785056Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/29/2020140959586Open ↗
05/19/2017140645345Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type