Health center, child center, clinic
781 EAST 142 STREET
BRONX · Mott Haven-Port Morris · BIN 2003874
💬 Discuss this project
1912Year Built
3Stories
I5Building Class
M1-3Zoning
27,400 sfGross Floor Area
1Units
LL97 Covered9 Open Violations ▸
Health center, child center, clinic · Owner of record: 781-3 EAST 142 LLC · 6,220 sf lot · 4.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction61p · 6 filings · 20 docs
Floor 4Under Construction48p · 4 filings · 20 docs
Floor 3Under Construction53p · 6 filings · 20 docs
Floor 2Under Construction48p · 6 filings · 20 docs
Floor 1Under Construction53p · 7 filings · 20 docs
CellarUnder Construction53p · 5 filings · 20 docs
Site & exterior18p · 4 filings · 12 docs
Filed — no permit issued3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
781-3 EAST 142 LLC103/22/2026
DEP OF CITYWIDE ADMIN SERVICES103/21/2026
CITY OF NY DEPT OF GEN SERVICES103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2014$3.1M—— → —$112/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOTTOLA RINI ENGINEERS607/16/2026
KZ ENGINEERING, P.C603/04/2026
MILTIADIS LEPTOURGOS, PE403/18/2025
GEORGE E. BERGER & ASSOC.601/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASSOCIATES2203/21/2026
SYNERGY BUILDING CONSULTANTS703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VEMA GROUP LLCGeneral Contractor2209/07/2026
SUPERIOR SERVICES DEMO INGeneral Contractor407/08/2026
JODOM MECHANICAL, INCPlumbing307/08/2026
DDS MECHANICAL FPS CORPFire Protection207/08/2026
D.D.S. MECH PBG&HTG CORPPlumbing207/08/2026
ENER-CON TECHNICAL SERVICGeneral Contractor104/09/2026
JOSEPH VITALEElectrical103/21/2026
GKF ELECL CONTRACTORS INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILTIADIS LEPTOURGOS, PE508507/16/2026
MOTTOLA RINI ENGINEERS, P3251607/16/2026
HUDSON PEAKS CONSULTING L8381310/17/2024
KZ ENGINEERING, P.C.4665103/01/2024
Building Lifecycle
All (162)Filed (23)Permit Issued (29)Signed Off (10)Violation (36)Inspection (10)Objection (24)Special Inspection (30)
09/03/2026
Permit issued — Mechanical Systems
X01014899-S1-MS
09/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/26/2026
Permit issued — Suspended Scaffold
X01013454-I1-SC
07/31/2026
Signed off — Alteration
X01014979-I1
07/17/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Anthony Rini, III
07/16/2026
Filed — Alteration
X01014899-P1
07/16/2026
Filed — Alteration
X01014899-S1
07/16/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Miltiadis Leptourgos
07/16/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Anthony Rini, III
07/15/2026
Special inspection requirement — Mechanical Systems
Anthony Rini, III
07/15/2026
Special inspection requirement — Final
Anthony Rini, III
06/30/2026
Signed off — Alteration
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01076147-I1
05/14/2026
Signed off — Alteration
X00487097-I1
05/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/27/2026
Inspection — Under Review Boiler Equipment Inspection
Under Review
View inspection ↗
04/22/2026
Signed off — Alteration
IT IS PROPOSED TO REMOVE INTERIOR NON-BEARING PARTITION OF EXISTING BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. CAP & REMOVE PLUMBING FIXTURES FILED UNDER SEPARATE APPLICATION #:X00487097
X00481234-I1
04/13/2026
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01352942-I1
04/10/2026
Permit issued — Boiler Equipment
X01014899-I1-BE
03/06/2026
Permit issued — General Construction
X00805071-I1-GC
03/05/2026
Permit issued — Sidewalk Shed
X01352942-I1-SH
03/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Lighting in dwelling units
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Maintenance information
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Insulation placement and R values
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Interior lighting power
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Air barrier - visual inspection
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Fenestration air leakage
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Lighting controls
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Fenestration areas
GIORGI KHARDZEISHVILI
03/04/2026
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01352942-I1
03/03/2026
Objection resolved — Addressed
12/30/2025
Objection raised — Other
12/17/2025
Objection resolved — Addressed
11/18/2025
Permit issued — Mechanical Systems
X01014979-I1-MS
11/14/2025
Filed — Alteration
X01014979-I1
11/10/2025
Signed off — Alteration
IT IS PROPOSED TO INSTALL PLUMBING FIXTURES AND A NEW SPRINKLER SYSTEM AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01014754-I1
08/29/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/26/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/23/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01006887-I1
07/23/2025
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00984230-I1
05/30/2025
Signed off — Alteration
STRUCTURAL APPLICATION IN CONJUNCTION WITH ALT-CO APPLICATION JOB # X00805071-I1 BY GEORGE BERGER, PE, APPROVED ON 06/23/2023, PAA P2 APPROVED ON 06/10/2024. OBTAIN ST PERMIT. (REF JOB # 2286)
X01028544-I1
05/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01006887-P1
05/01/2025
Permit issued — Suspended Scaffold
X01013454-I1-SC
04/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2025
Special inspection requirement — Lighting in dwelling units
Miltiadis Leptourgos
04/09/2025
Signed off — Alteration
X01117492-I1
04/04/2025
Objection raised — Other
04/04/2025
Special inspection requirement — Concrete - Cast-In-Place
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Structural Steel - Details
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Structural Steel - Welding
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Subgrade Inspections
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Structural Cold-Formed Steel
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Miltiadis Leptourgos
Latest 60 of 162 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offVEMA GROUP LLC09/03/2026
DOB NOWSuspended ScaffoldSigned-offVEMA GROUP LLC08/26/2026
DOB NOWBoiler EquipmentSigned-offOLYMPIAN FUEL OIL CORP04/10/2026
DOB NOWGeneral ConstructionPermit IssuedVEMA GROUP LLC03/06/2026
DOB NOWSidewalk ShedSigned-offVEMA GROUP LLC03/05/2026
DOB NOWMechanical SystemsSigned-offENER-CON TECHNICAL SERVIC11/18/2025
DOB NOWSuspended ScaffoldSigned-offVEMA GROUP LLC05/01/2025
DOB NOWSprinklersSigned-offD.D.S. MECH PBG&HTG CORP04/01/2025
DOB NOWSupported ScaffoldSigned-offVEMA GROUP LLC03/31/2025
DOB NOWPlumbingSigned-offDDS MECHANICAL FPS CORP03/28/2025
DOB NOWStructuralSigned-offVEMA GROUP LLC03/28/2025
DOB NOWSidewalk ShedSigned-offVEMA GROUP LLC02/21/2025
DOB NOWGeneral ConstructionSigned-offVEMA GROUP LLC01/23/2025
DOB NOWGeneral ConstructionSigned-offVEMA GROUP LLC12/03/2024
DOB NOWGeneral ConstructionSigned-offVEMA GROUP LLC07/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offVEMA GROUP LLC07/12/2024
DOB NOWSprinklersSigned-offD.D.S. MECH PBG&HTG CORP04/04/2024
DOB NOWPlumbingSigned-offDDS MECHANICAL FPS CORP04/04/2024
DOB NOWSuspended ScaffoldSigned-offVEMA GROUP LLC03/14/2024
DOB NOWSupported ScaffoldSigned-offVEMA GROUP LLC03/01/2024
DOB NOWGeneral ConstructionPermit IssuedVEMA GROUP LLC02/29/2024
DOB NOWPlumbingSigned-offJODOM MECHANICAL, INC02/01/2024
DOB NOWGeneral ConstructionSigned-offVEMA GROUP LLC01/18/2024
DOB NOWSidewalk ShedSigned-offVEMA GROUP LLC01/17/2024
DOB NOWPlumbingSigned-offJODOM MECHANICAL, INC04/14/2023
DOB NOWGeneral ConstructionSigned-offVEMA GROUP LLC01/06/2023
DOB NOWPlumbingSigned-offJODOM MECHANICAL, INC03/01/2022
DOB NOWGeneral ConstructionSigned-offSUPERIOR SERVICES DEMO IN02/28/2022
DOB NOWGeneral ConstructionSigned-offSUPERIOR SERVICES DEMO IN03/25/2021
BISOTISSUEDTOWER BUILDING RESTORATION CORP01/20/1998
BISEQISSUEDATLANTIC SCAFFOLDING01/08/1998
BISEQISSUEDATLANTIC SCAFFOLDING07/22/1997
BISPLISSUEDCHARLES CASA & SON INC.04/24/1997
BISFPISSUEDGEBHARDT INC02/27/1997
BIS—ISSUEDB.N.J. GENERAL CONSTRUCTION, INC12/06/1993
BISPLISSUEDALLOCCA MECHANICAL PLG & HTG.12/06/1993
4 projects · most recent 07/14/2025
General Wiring
FiledStatusContractorScope
07/14/2025Permit IssuedTITAN ELEC'L & ELEV CONTR—
07/01/2024Permit IssuedGKF ELECL CONTRACTORS INC2 meters, 2 new_meters
05/29/2024Permit IssuedGKF ELECL CONTRACTORS INCGeneral Wiring
01/13/2024CompleteGKF ELECL CONTRACTORS INC—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/27/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
08/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
07/17/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsAnthony Rini, IIIspecial
07/16/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsAnthony Rini, IIIspecial
07/16/2026Emergency and Standby Power Systems (Generator)Miltiadis Leptourgosspecial
07/15/2026FinalAnthony Rini, IIIprogress
07/15/2026Mechanical SystemsAnthony Rini, IIIspecial
03/05/2026Fenestration and door U-factor and product ratingsGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Insulation placement and R valuesGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Interior lighting powerGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Air barrier - visual inspectionGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Lighting in dwelling unitsGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Energy Code Compliance InspectionsGIORGI KHARDZEISHVILIprogress
03/05/2026Fire-Resistance Rated ConstructionGIORGI KHARDZEISHVILIprogress
03/05/2026Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
03/05/2026Fenestration air leakageGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Lighting controlsGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Fenestration areasGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Maintenance informationGIORGI KHARDZEISHVILIenergy_progress
04/17/2025Lighting in dwelling unitsMiltiadis Leptourgosenergy_progress
04/04/2025FinalMiltiadis Leptourgosprogress
04/04/2025Structural Steel - High Strength BoltingMiltiadis Leptourgosspecial
04/04/2025Subgrade InspectionsMiltiadis Leptourgosspecial
04/04/2025Concrete - Cast-In-PlaceMiltiadis Leptourgosspecial
04/04/2025Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
04/04/2025Structural Steel - WeldingMiltiadis Leptourgosspecial
04/04/2025MasonryMiltiadis Leptourgosspecial
Latest 25 of 89.
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch25
08/25/2026X00487097-I1Request digital key ↗
08/25/2026X00481234-I1Request digital key ↗
08/21/2026X01006887-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/20/2026X01161938-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/14/2013220247212Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram6
08/21/2026X01028544-P1Open ↗
08/21/2026X01028544-I1Open ↗
08/20/2026X00805071-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/20/2026X00805071-P3Open ↗
08/20/2026X00805071-I1Open ↗
08/14/2026X00805071-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026X00805071-I1Open ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature24
09/25/2026X01014899-S1Open ↗
09/23/2026X01117492-I1Open ↗
09/03/2026X01161938-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/25/2026X00481234-I1Open ↗
08/21/2026X01006887-P1Open ↗
08/21/2026X01006887-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/25/2026X01014899-S1Open ↗
09/25/2026X01014899-S1Open ↗
09/23/2026X01117492-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/14/2013220247212Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/21/2026X01028544-P1Open ↗
08/21/2026X01028544-I1Open ↗
08/13/2026X01028544-P2Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/14/2013220247212Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
08/20/2026X00805071-P3Open ↗
08/20/2026X00805071-P3Open ↗
08/20/2026X00805071-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/20/2026X00805071-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/20/2026X00805071-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/25/2026X00481234-I1Open ↗
08/21/2026X01014899-S1Open ↗
08/21/2026X01014899-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026X01117492-I1Open ↗
08/13/2026X01028544-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/14/2013220247212Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
01/14/2013220247212Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/14/2013220247212Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026X01014979-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/21/2026X01028544-P1Open ↗
08/21/2026X01028544-I1Open ↗
08/13/2026X01028544-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01028544-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/14/2013220247212Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/14/2013220247212Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/14/2013220247212Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial6
08/21/2026X01028544-P1Open ↗
08/21/2026X01028544-I1Open ↗
08/20/2026X00805071-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/21/2026X01028544-P1Open ↗
08/21/2026X01028544-I1Open ↗
08/20/2026X00805071-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlot Diagram6
08/21/2026X01028544-P1Open ↗
08/21/2026X01028544-I1Open ↗
08/20/2026X00805071-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification3
08/20/2026X00805071-P3Open ↗
08/20/2026X00805071-I1Open ↗
08/14/2026X00805071-P2Open ↗
▸DOB NOWCalculations1
08/13/2026X01013454-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01013454-I1Open ↗