← Back
BuildNYC
Health center, child center, clinic - converting to residential (21 apartments filed)
781 EAST 142ND STREET
BRONX · Mott Haven-Port Morris · BIN 2003874
💬 Discuss this project
1912Year Built
3Stories
I5Building Class
M1-3Zoning
27,400 sfGross Floor Area
1Units
LL97 Covered0 Active Violations
Health center, child center, clinic - converting to residential (21 apartments filed) · Owner of record: 781-3 East 142 · 6,220 sf lot · 4.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof781-3 East 142 LLC65p · 6 filings · 20 docs
Bulkhead781-3 East 142 LLC2p · 2 filings · 20 docs
Floor 4781-3 East 142 LLC48p · 4 filings · 20 docs
Floor 3781-3 East 142 LLC53p · 6 filings · 20 docs
Floor 2781-3 East 142 LLC48p · 6 filings · 20 docs
Floor 1781-3 East 142 LLC56p · 7 filings · 20 docs
Cellar781-3 East 142 LLC54p · 7 filings · 20 docs
Basement781-3 East 142 LLC1p · 1 filing · 3 docs
Site & exteriorTemporary heavy duty sidewalk shed19p · 4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
781-3 East 142103/22/2026
Dep of Citywide Admin Services103/21/2026
City of NY Department of Gen Services103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2014$3.1M—— → —$112/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mottola Rini Engineers607/16/2026
KZ Engineering603/04/2026
Miltiadis Leptourgos, PE403/18/2025
George E. Berger & Associates601/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
George E Berger Associates2203/21/2026
Synergy Building Consultants703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vema GroupGeneral Contractor1309/07/2026
Vema GroupScaffold907/08/2026
Superior Services DemoGeneral Contractor407/08/2026
Jodom MechanicalPlumbing307/08/2026
DDS Mechanical FPSFire Protection207/08/2026
D.D.S. Mechanical PBG & HeatingPlumbing207/08/2026
Ener-Con Technical ServicesGeneral Contractor104/09/2026
Titan Electrical & Elev ContractingElectrical103/21/2026
GKF Electrical ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Miltiadis Leptourgos, PE508507/16/2026
Mottola Rini Engineers, P3251607/16/2026
Hudson Peaks Consulting8381310/17/2024
KZ Engineering4665103/01/2024
Building Lifecycle
All (164)Filed (23)Permit Issued (29)Signed Off (13)Violation (36)Inspection (9)Objection (24)Special Inspection (30)
09/22/2026
Signed off — Alteration
X01013454-I1
09/15/2026
Signed off — Alteration
X01014899-S1
09/03/2026
Permit issued — Mechanical Systems
X01014899-S1-MS
09/01/2026
Signed off — Alteration
X01014899-I1
09/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/26/2026
Permit issued — Suspended Scaffold
X01013454-I1-SC
07/31/2026
Signed off — Alteration
X01014979-I1
07/17/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Anthony Rini, III
07/16/2026
Filed — Alteration
X01014899-S1
07/16/2026
Filed — Alteration
X01014899-P1
07/16/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Anthony Rini, III
07/16/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Miltiadis Leptourgos
07/15/2026
Special inspection requirement — Mechanical Systems
Anthony Rini, III
07/15/2026
Special inspection requirement — Final
Anthony Rini, III
06/30/2026
Signed off — Alteration
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01076147-I1
05/14/2026
Signed off — Alteration
X00487097-I1
05/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/27/2026
Inspection — Under Review Boiler Equipment Inspection
Under Review
View inspection ↗
04/22/2026
Signed off — Alteration
IT IS PROPOSED TO REMOVE INTERIOR NON-BEARING PARTITION OF EXISTING BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. CAP & REMOVE PLUMBING FIXTURES FILED UNDER SEPARATE APPLICATION #:X00487097
X00481234-I1
04/13/2026
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01352942-I1
04/10/2026
Permit issued — Boiler Equipment
X01014899-I1-BE
03/06/2026
Permit issued — General Construction
X00805071-I1-GC
03/05/2026
Permit issued — Sidewalk Shed
X01352942-I1-SH
03/05/2026
Special inspection requirement — Interior lighting power
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Lighting controls
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Lighting in dwelling units
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Insulation placement and R values
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Maintenance information
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Fenestration areas
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Fenestration air leakage
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Energy Code Compliance Inspections
GIORGI KHARDZEISHVILI
03/05/2026
Special inspection requirement — Air barrier - visual inspection
GIORGI KHARDZEISHVILI
03/04/2026
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01352942-I1
03/03/2026
Objection resolved — Addressed
12/30/2025
Objection raised — Other
12/17/2025
Objection resolved — Addressed
11/18/2025
Permit issued — Mechanical Systems
X01014979-I1-MS
11/14/2025
Filed — Alteration
X01014979-I1
11/10/2025
Signed off — Alteration
IT IS PROPOSED TO INSTALL PLUMBING FIXTURES AND A NEW SPRINKLER SYSTEM AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01014754-I1
08/29/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/26/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/23/2025
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00984230-I1
07/23/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01006887-I1
05/30/2025
Signed off — Alteration
STRUCTURAL APPLICATION IN CONJUNCTION WITH ALT-CO APPLICATION JOB # X00805071-I1 BY GEORGE BERGER, PE, APPROVED ON 06/23/2023, PAA P2 APPROVED ON 06/10/2024. OBTAIN ST PERMIT. (REF JOB # 2286)
X01028544-I1
05/13/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01006887-P1
05/01/2025
Permit issued — Suspended Scaffold
X01013454-I1-SC
04/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2025
Special inspection requirement — Lighting in dwelling units
Miltiadis Leptourgos
04/09/2025
Signed off — Alteration
X01117492-I1
04/04/2025
Objection raised — Other
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Structural Steel - Details
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Subgrade Inspections
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Structural Steel - Welding
Miltiadis Leptourgos
04/04/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Miltiadis Leptourgos
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offVema Group09/03/2026
DOB NOWSuspended ScaffoldSigned-offVema Group08/26/2026
DOB NOWBoiler EquipmentSigned-offOlympian Fuel Oil04/10/2026
DOB NOWGeneral ConstructionPermit IssuedVema Group03/06/2026
DOB NOWSidewalk ShedSigned-offVema Group03/05/2026
DOB NOWMechanical SystemsSigned-offEner-Con Technical Services11/18/2025
DOB NOWSuspended ScaffoldSigned-offVema Group05/01/2025
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating04/01/2025
DOB NOWSupported ScaffoldSigned-offVema Group03/31/2025
DOB NOWStructuralSigned-offVema Group03/28/2025
DOB NOWSprinklersSigned-offDDS Mechanical FPS03/28/2025
DOB NOWSidewalk ShedSigned-offVema Group02/21/2025
DOB NOWGeneral ConstructionSigned-offVema Group01/23/2025
DOB NOWGeneral ConstructionSigned-offVema Group12/03/2024
DOB NOWGeneral ConstructionSigned-offVema Group07/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offVema Group07/12/2024
DOB NOWSprinklersSigned-offDDS Mechanical FPS04/04/2024
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating04/04/2024
DOB NOWSuspended ScaffoldSigned-offVema Group03/14/2024
DOB NOWSupported ScaffoldSigned-offVema Group03/01/2024
DOB NOWGeneral ConstructionPermit IssuedVema Group02/29/2024
DOB NOWPlumbingSigned-offJodom Mechanical02/01/2024
DOB NOWGeneral ConstructionSigned-offVema Group01/18/2024
DOB NOWSidewalk ShedSigned-offVema Group01/17/2024
DOB NOWPlumbingSigned-offJodom Mechanical04/14/2023
DOB NOWGeneral ConstructionSigned-offVema Group01/06/2023
DOB NOWPlumbingSigned-offJodom Mechanical03/01/2022
DOB NOWGeneral ConstructionSigned-offSuperior Services Demo02/28/2022
DOB NOWGeneral ConstructionSigned-offSuperior Services Demo03/25/2021
BISOTISSUEDTower Building Restoration01/20/1998
BISEQISSUEDAtlantic Scaffolding01/08/1998
BISEQISSUEDAtlantic Scaffolding07/22/1997
BISPLISSUEDCharles Casa & Son04/24/1997
BISFPISSUEDGebhardt02/27/1997
BIS—ISSUEDB.N.J. General Construction12/06/1993
BISPLISSUEDAllocca Mechanical PLG & Heating12/06/1993
4 projects · most recent 10/04/2026
General Wiring
FiledStatusContractorScope
10/04/2026Permit IssuedGKF Electrical Contractors2 meters, 2 new_meters
10/04/2026Permit IssuedGKF Electrical ContractorsGeneral Wiring
07/14/2025Permit IssuedTitan Electrical & Elev Contracting—
01/13/2024CompleteGKF Electrical Contractors—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/27/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
08/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
07/17/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsAnthony Rini, IIIspecial
07/16/2026Emergency and Standby Power Systems (Generator)Miltiadis Leptourgosspecial
07/16/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsAnthony Rini, IIIspecial
07/15/2026Mechanical SystemsAnthony Rini, IIIspecial
07/15/2026FinalAnthony Rini, IIIprogress
03/05/2026Air barrier - visual inspectionGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
03/05/2026Fire-Resistance Rated ConstructionGIORGI KHARDZEISHVILIprogress
03/05/2026Energy Code Compliance InspectionsGIORGI KHARDZEISHVILIprogress
03/05/2026Lighting in dwelling unitsGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Fenestration air leakageGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Lighting controlsGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Fenestration areasGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Maintenance informationGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Fenestration and door U-factor and product ratingsGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Insulation placement and R valuesGIORGI KHARDZEISHVILIenergy_progress
03/05/2026Interior lighting powerGIORGI KHARDZEISHVILIenergy_progress
04/17/2025Lighting in dwelling unitsMiltiadis Leptourgosenergy_progress
04/04/2025Concrete - Cast-In-PlaceMiltiadis Leptourgosspecial
04/04/2025Subgrade InspectionsMiltiadis Leptourgosspecial
04/04/2025Structural Steel - High Strength BoltingMiltiadis Leptourgosspecial
04/04/2025Subsurface Investigations (Borings/Test Pits)Miltiadis Leptourgosspecial
04/04/2025Sprayed fire-resistant materialsMiltiadis Leptourgosspecial
04/04/2025Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
04/04/2025Fire-Resistance Rated ConstructionMiltiadis Leptourgosprogress
Latest 25 of 89.
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch25
08/25/2026X00487097-I1Request digital key ↗
08/25/2026X00481234-I1Request digital key ↗
08/21/2026X01006887-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/20/2026X01161938-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/14/2013220247212Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram6
08/21/2026X01028544-I1Open ↗
08/21/2026X01028544-P1Open ↗
08/20/2026X00805071-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/20/2026X00805071-P3Open ↗
08/20/2026X00805071-I1Open ↗
08/14/2026X00805071-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026X00805071-I1Open ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature24
09/25/2026X01014899-S1Open ↗
09/23/2026X01117492-I1Open ↗
09/03/2026X01161938-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/25/2026X00481234-I1Open ↗
08/21/2026X01006887-I1Open ↗
08/21/2026X01006887-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/25/2026X01014899-S1Open ↗
09/25/2026X01014899-S1Open ↗
09/23/2026X01117492-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/14/2013220247212Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/21/2026X01028544-P1Open ↗
08/21/2026X01028544-I1Open ↗
08/13/2026X01028544-P2Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/14/2013220247212Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
08/20/2026X00805071-P3Open ↗
08/20/2026X00805071-P3Open ↗
08/20/2026X00805071-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/20/2026X00805071-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/20/2026X00805071-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/25/2026X00481234-I1Open ↗
08/21/2026X01014899-P1Open ↗
08/21/2026X01014899-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026X01117492-I1Open ↗
08/13/2026X01028544-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/14/2013220247212Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
01/14/2013220247212Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/14/2013220247212Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026X01014979-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/21/2026X01028544-P1Open ↗
08/21/2026X01028544-I1Open ↗
08/13/2026X01028544-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X01028544-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/14/2013220247212Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/14/2013220247212Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/14/2013220247212Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial6
08/21/2026X01028544-P1Open ↗
08/21/2026X01028544-I1Open ↗
08/20/2026X00805071-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/21/2026X01028544-P1Open ↗
08/21/2026X01028544-I1Open ↗
08/20/2026X00805071-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlot Diagram6
08/21/2026X01028544-P1Open ↗
08/21/2026X01028544-I1Open ↗
08/20/2026X00805071-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification3
08/20/2026X00805071-P3Open ↗
08/20/2026X00805071-I1Open ↗
08/14/2026X00805071-P2Open ↗
▸DOB NOWCalculations1
08/13/2026X01013454-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01013454-I1Open ↗