← Back
Public elementary, junior or senior high
Success Academy Charter School - Bed Stuy 3
322 KOSCIUSZKO STREET · Bedford-Stuyvesant (East) · BIN 3049858
💬 Discuss this project
1959Year Built
4Stories
W1Building Class
R6AZoning
222,264 sfGross Floor Area
1Units
LL97 Covered4 Open Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 89,700 sf lot · 2.48 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction8p · 1 filing · 20 docs
CellarUnder Construction6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY4010/01/2026
NYC DEPARTMENT OF EDUCATION203/22/2026
D.O.E. P.S.256 0103/22/2026
D.O.E. P.S.025203/22/2026
DEPT OF EDUC. PS 25 040303/22/2026
DEPARTMENT OF EDUCATION1003/22/2026
DEPT OF EDUC. PS 25303/22/2026
D.O.E. P.S.25 0303/22/2026
DOE PS025 040103/22/2026
VENUS GROUP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KERI ENGINEERING, P.C.207/07/2026
SYNERGY STRATEGIC DESIGN ARCHITECTS204/22/2026
YU & ASSOCIATES612/30/2025
DMR ARCHITECTS210/04/2022
KNF SERVICES CROP310/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KNF SERVICES CROP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor1107/08/2026
FRANCIS RICHARDSElectrical703/21/2026
VENUS GROUP INCGeneral Contractor707/08/2026
WDF INCGeneral Contractor507/08/2026
VARSITY PLBG AND HTG INCPlumbing307/08/2026
FOURTH AVENUE MERCHANTS IGeneral Contractor307/25/2026
HIGH VOLT ELEC CORP. OFElectrical203/22/2026
GENUINE PLBG & HTG LLCPlumbing207/08/2026
GATZONIS, CElectrical103/21/2026
SAI JI PLUMBING, INCPlumbing110/01/2026
DIMARCO, JOSEPHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317407/07/2026
FUTURE TECH CONSULTANTS O589308/20/2024
MUNICIPAL TESTING LABORAT230210/04/2022
Building Lifecycle
All (138)Filed (15)Permit Issued (22)Signed Off (4)Violation (60)Inspection (3)Objection (21)Special Inspection (13)
09/30/2026
Permit issued — Plumbing
B00974497-I1-PL
07/24/2026
Permit issued — General Construction
B00647134-I1-GC
07/13/2026
Objection raised — Other
07/07/2026
Filed — Alteration
Replace existing plumbing fixtures with ADA compliant fixtures. Modify existing plumbing distribution piping hot water, cold water, sanitary and vent piping per new plumbing fixture location. Reuse existing lights and recircuit. Provide new light in JC.
B00647134-P2
05/28/2026
Permit issued — Plumbing
B00974497-I1-PL
05/15/2026
Violation issued (ECB, open)
Construction
05/15/2026
Violation issued (ECB, open)
Construction
05/15/2026
Violation issued (ECB, open)
Construction
05/15/2026
Violation issued (ECB, open)
Construction
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
04/22/2026
Filed — Alteration
Replace existing plumbing fixtures with ADA compliant fixtures. Modify existing plumbing distribution piping hot water, cold water, sanitary and vent piping per new plumbing fixture location. Reuse existing lights and recircuit. Provide new light in JC.
B00647134-P1
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
03/05/2026
Permit issued — Plumbing
B00647134-S1-PL
03/03/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/30/2025
Filed — Alteration
R&R INLET IN PLAY YARD WITH NEW CATCH BASIN (C.B.); INSTALL NEW INLET IN PLAY YARD; INSTALL NEW STORM PIPING CONNECTING NEW INLET AND NEW C.B.; NEW C.B. TO CONNECT TO NEW STORM PIPING WHICH DISCHARGES INTO BUILDING; R&R STORM PIPING IN UPPER AREWAY
B00974497-P4
12/11/2025
Violation issued (FDNY_ORDER, closed)
12/11/2025
Violation issued (FDNY_ORDER, closed)
08/13/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING CLASSROOMS 215 & 217 FOR NEW MUSIC CLASSROOM AND RECORDING ROOM. NO CHANGE TO EXISTING OCCUPANCY & EGRESS.
B00760690-I1
08/11/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/23/2025
Permit issued — General Construction
B00647134-I1-GC
05/28/2025
Permit issued — Plumbing
B00974497-I1-PL
05/21/2025
Signed off — Alteration
B00602631-I1
03/03/2025
Permit issued — Plumbing
B00647134-S1-PL
02/28/2025
Permit issued — General Construction
B00647134-I1-GC
10/29/2024
Permit issued — General Construction
B00760690-I1-GC
09/19/2024
Objection resolved — Addressed
09/19/2024
Objection resolved — Addressed
08/26/2024
Objection raised — Other
08/26/2024
Objection raised — Other
08/20/2024
Filed — Alteration
R&R INLET IN PLAY YARD WITH NEW CATCH BASIN (C.B.); INSTALL NEW INLET IN PLAY YARD; INSTALL NEW STORM PIPING CONNECTING NEW INLET AND NEW C.B.; NEW C.B. TO CONNECT TO NEW STORM PIPING WHICH DISCHARGES INTO BUILDING; R&R STORM PIPING IN UPPER AREWAY
B00974497-P3
08/20/2024
Filed — Alteration
R&R INLET IN PLAY YARD WITH NEW CATCH BASIN (C.B.); INSTALL NEW INLET IN PLAY YARD; INSTALL NEW STORM PIPING CONNECTING NEW INLET AND NEW C.B.; NEW C.B. TO CONNECT TO NEW STORM PIPING WHICH DISCHARGES INTO BUILDING; R&R STORM PIPING IN UPPER AREWAY
B00974497-P2
08/08/2024
Special inspection requirement — Subgrade Inspections
Noel Tolentino
08/08/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Noel Tolentino
08/08/2024
Special inspection requirement — Final
Michael Marchese
04/23/2024
Permit issued — Plumbing
B00974497-I1-PL
04/22/2024
Permit issued — Earth Work
B00974497-S1-EA
04/04/2024
Filed — Alteration
R&R INLET IN PLAY YARD WITH NEW CATCH BASIN (C.B.); INSTALL NEW INLET IN PLAY YARD; INSTALL NEW STORM PIPING CONNECTING NEW INLET AND NEW C.B.; NEW C.B. TO CONNECT TO NEW STORM PIPING WHICH DISCHARGES INTO BUILDING; R&R STORM PIPING IN UPPER AREWAY
B00974497-P1
04/03/2024
Special inspection requirement — Subgrade Inspections
04/03/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
04/03/2024
Special inspection requirement — Final
03/07/2024
Objection resolved — Addressed
03/07/2024
Objection resolved — Addressed
02/13/2024
Objection raised — Other
02/13/2024
Objection raised — Other
02/08/2024
Filed — Alteration
R&R INLET IN PLAY YARD WITH NEW CATCH BASIN (C.B.); INSTALL NEW INLET IN PLAY YARD; INSTALL NEW STORM PIPING CONNECTING NEW INLET AND NEW C.B.; NEW C.B. TO CONNECT TO NEW STORM PIPING WHICH DISCHARGES INTO BUILDING; R&R STORM PIPING IN UPPER AREWAY
B00974497-S1
02/06/2024
Filed — Alteration
R&R INLET IN PLAY YARD WITH NEW CATCH BASIN (C.B.); INSTALL NEW INLET IN PLAY YARD; INSTALL NEW STORM PIPING CONNECTING NEW INLET AND NEW C.B.; NEW C.B. TO CONNECT TO NEW STORM PIPING WHICH DISCHARGES INTO BUILDING; R&R STORM PIPING IN UPPER AREWAY
B00974497-I1
12/22/2023
Permit issued — Construction Fence
B00602631-I1-FN
09/19/2023
Signed off — Alteration
Filing for temporary supported scaffolding on behalf of the Owner. No change in use, egress or occupancy.
B00604553-I1
08/29/2023
Signed off — Alteration
B00604522-I1
08/02/2023
Violation issued (ECB, closed)
Construction
06/22/2023
Permit issued — Supported Scaffold
B00604553-I1-SF
06/02/2023
Permit issued — General Construction
B00760690-I1-GC
02/10/2023
Violation issued (ECB, closed)
Construction
12/30/2022
Permit issued — Sidewalk Shed
B00604522-I1-SH
12/23/2022
Permit issued — Construction Fence
B00602631-I1-FN
12/07/2022
Permit issued — General Construction
B00760690-I1-GC
11/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CLOUD LEE
11/07/2022
Objection resolved — Addressed
10/20/2022
Objection raised — Other
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSAI JI PLUMBING, INC09/30/2026
DOB NOWGeneral ConstructionPermit IssuedFOURTH AVENUE MERCHANTS I07/24/2026
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC05/28/2026
DOB NOWPlumbingPermit IssuedGENUINE PLBG & HTG LLC03/05/2026
DOB NOWGeneral ConstructionPermit IssuedFOURTH AVENUE MERCHANTS I07/23/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC05/28/2025
DOB NOWPlumbingPermit IssuedGENUINE PLBG & HTG LLC03/03/2025
DOB NOWGeneral ConstructionPermit IssuedFOURTH AVENUE MERCHANTS I02/28/2025
DOB NOWGeneral ConstructionSigned-offWDF INC10/29/2024
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC04/23/2024
DOB NOWEarth WorkSigned-offVENUS GROUP INC04/22/2024
DOB NOWConstruction FenceSigned-offVENUS GROUP INC12/22/2023
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC06/22/2023
DOB NOWGeneral ConstructionSigned-offWDF INC06/02/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/30/2022
DOB NOWConstruction FenceSigned-offVENUS GROUP INC12/23/2022
DOB NOWGeneral ConstructionSigned-offWDF INC12/07/2022
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC06/23/2022
DOB NOWConstruction FenceSigned-offVENUS GROUP INC06/22/2022
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC02/10/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC01/04/2022
DOB NOWConstruction FenceSigned-offVENUS GROUP INC11/03/2021
BISPLISSUEDVARSITY PLBG AND HTG INC11/24/2025
BISOTISSUEDVENUS GROUP INC06/30/2025
BISOTISSUEDVENUS GROUP INC06/30/2025
BISOTISSUEDVENUS GROUP INC06/24/2025
BISOTISSUEDVENUS GROUP INC06/17/2025
BISPLISSUEDVARSITY PLBG AND HTG INC11/29/2024
BISOTISSUEDVENUS GROUP INC06/25/2024
BISOTISSUEDVENUS GROUP INC06/25/2024
BISOTISSUEDVENUS GROUP INC06/20/2024
BISMHISSUEDSMART HEATING & COOLING03/14/2024
BISPLISSUEDVARSITY PLBG AND HTG INC12/04/2023
BISOTISSUEDVENUS GROUP INC06/22/2023
BISOTISSUEDVENUS GROUP INC06/22/2023
BISMHISSUEDSMART HEATING & COOLING04/24/2023
BISPLISSUEDVARSITY PLBG AND HTG INC12/05/2022
BISOTISSUEDVENUS GROUP INC06/23/2022
BISOTISSUEDVENUS GROUP INC06/23/2022
BISOTISSUEDVENUS GROUP INC03/09/2022
+ 32 more permits on file
2 projects · most recent 07/07/2026
Water/Sanitary Storm
FiledStatusContractorScope
07/07/2026Permit IssuedGENUINE PLBG & HTG LLCWater/Sanitary
12/30/2025Permit IssuedSAI JI PLUMBING, INCStorm
20 projects · most recent 10/08/2025
General Wiring
FiledStatusContractorScope
10/08/2025CompleteG ENERGY SOLTN AND SVCS IGeneral Wiring
09/17/2025CompleteGEMINI ELECTRIC CO., INC.—
09/04/2025CompleteGEMINI ELECTRIC CO., INC.—
05/04/2025CompleteEVEREST ELECTRIC CORP—
03/25/2025Permit IssuedHIGH VOLT ELEC CORP. OF—
03/06/2025Permit IssuedLIU ELECTRIC, LLCGeneral Wiring
11/04/2024CompleteCHARAN ELEC'L ENTERP'S IN—
06/28/2024CompleteGEMINI ELECTRIC CO., INC.—
03/23/2023CompleteCHARAN ELEC'L ENTERP'S IN—
10/20/2022CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
10/12/2022CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
09/29/2022CompleteABM ELECTRIC, INC—
01/28/2022CompleteHYLAN DATACOM & ELECL LLC—
08/25/2021CancelledSTANCO SYSTEM ELEC'L CONT—
07/30/2021CompleteABM ELECTRIC, INCGeneral Wiring
1 project · most recent 12/30/2025
Earthwork
FiledStatusContractorScope
12/30/2025Permit IssuedSAI JI PLUMBING, INCEarthwork
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/03/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/24/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
04/17/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
08/08/2024Subgrade InspectionsNoel Tolentinospecial
08/08/2024Subsurface Conditions – Fill Placement & In-Place DensityNoel Tolentinospecial
08/08/2024FinalMichael Marcheseprogress
04/03/2024Subgrade Inspections—special
04/03/2024Subsurface Conditions – Fill Placement & In-Place Density—special
04/03/2024Final—progress
11/22/2022Fire-Resistant Penetrations and JointsCLOUD LEEspecial
10/04/2022Fire-Resistant Penetrations and JointsCLOUD LEEspecial
12/17/2021Post-installed AnchorsMIKHAIL ZEYGMANspecial
12/17/2021Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
10/01/2021Post-installed AnchorsMichael Marchesespecial
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/01/2026B00602631-I1Request digital key ↗
09/01/2026B00604522-I1Request digital key ↗
08/29/2026B00760690-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
10/18/2011320378621Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00602631-I1Open ↗
09/01/2026B00604522-I1Open ↗
09/01/2026B00604553-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026B00647134-P1Open ↗
08/30/2026B00647134-I1Open ↗
08/30/2026B00974497-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/30/2026B00974497-P3Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/15/2026B00604553-I1Open ↗
08/13/2026B00602631-I1Open ↗
08/13/2026B00604522-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/29/2026B00760690-P1Open ↗
08/24/2026B00974497-I1Open ↗
08/24/2026B00974497-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/17/2026B00647134-S1Open ↗
08/15/2026B00647134-I1Open ↗
▸Approvals, Objections & Sign-offs34
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/01/2026B00602631-I1Open ↗
09/01/2026B00604522-I1Open ↗
08/29/2026B00760690-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
08/29/2026B00760690-P1Open ↗
08/17/2026B00647134-P1Open ↗
08/15/2026B00760690-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/15/2026B00760690-I1Open ↗
08/15/2026B00604553-I1Open ↗
08/13/2026B00604522-I1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
10/18/2011320378621Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/18/2011320378621Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
10/18/2011320378621Open ↗
10/18/2011320378621Open ↗
▸BISEFILING COVER SHEET1
10/18/2011320378621Open ↗
▸Other Documents21
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal16
08/29/2026B00760690-P1Open ↗
08/17/2026B00647134-P1Open ↗
08/15/2026B00647134-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProof of Historic Building2
08/29/2026B00760690-P1Open ↗
08/15/2026B00760690-I1Open ↗
▸DOB NOWNYCSCA Exhibit 22
08/15/2026B00760690-I1Open ↗
08/13/2026B00602631-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00974497-S1Open ↗