← Back
Three families
796 BEDFORD AVENUE
BROOKLYN · BIN 3054236
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
M1-2/R6AZoning
2,628 sfGross Floor Area
3Units
Rent Stabilized22 Open Violations ▸FDNY Report ↗
Three families · 1,800 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 3 filings · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 4Under Construction5p · 3 filings · 20 docs
Floor 3Under Construction8p · 2 filings · 20 docs
Floor 2Under Construction5p · 3 filings · 20 docs
Floor 1Under Construction5p · 2 filings · 20 docs
MezzanineUnder Construction7p · 2 filings · 20 docs
CellarUnder Construction8p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY1207/08/2026
GOLDEN BUILDERS NY2007/08/2026
J & G CONSTRUCTION SVCS804/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHOSEN MEP, CORP.509/10/2025
KCE CONSULTING ENGINEERING PLLC305/28/2025
MOHAMMAD AHEAD, PE310/16/2024
AG ENGINEERING PLLC105/09/2024
ASHRAF CORP104/16/2024
SHAHRISH SHUVO ENGINEERING P.C.108/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)903/21/2026
EZFILINGNYCORP303/21/2026
GREEN STUDIO203/21/2026
KMA DESIGNS LLC203/21/2026
XPDITE GROUP LLC 104503/21/2026
XPDITE GROUP 103403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN BUILDERS NY INCGeneral Contractor807/08/2026
ACE GROUP NY CORPGeneral Contractor707/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor404/09/2026
TARGET PIPING NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616309/10/2025
NORMAN C. LOK818105/09/2024
Building Lifecycle
All (191)Filed (14)Permit Issued (14)Signed Off (3)Violation (49)Inspection (1)Objection (80)Special Inspection (30)
07/20/2026
Signed off — Alteration
INTERIOR RENOVATION ON FLOORS BAS,001,002,003. FILING TO REMOVE AND REPLACE NON BEARING PARTITIONS AT SAME LOCATIONS, REFINISHING FLOORS AND REMOVING AND REPLACING KITCHEN CABINETS AT SAME LOCATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01048718-I1
06/24/2026
Permit issued — General Construction
B01048718-I1-GC
05/27/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, PIPE SCAFFOLDING, AND PLYWOOD FENCE AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00914505-I1
05/21/2026
Permit issued — Construction Fence
B00914505-I1-FN
05/01/2026
Violation issued (HPD, closed)
A
01/08/2026
Permit issued — Sprinklers
B01274227-I1-EW-SP
11/18/2025
Violation issued (HPD, closed)
I
11/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/03/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
10/27/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC
B01036217-I1
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
09/23/2025
Objection raised — Fire_Protection
09/23/2025
Objection raised — Fire_Protection
09/23/2025
Objection raised — Fire_Protection
09/23/2025
Objection raised — Cost
09/23/2025
Objection raised — Fire_Protection
09/23/2025
Objection raised — Plumbing
09/23/2025
Objection raised — Fire_Protection
09/23/2025
Objection raised — Fire_Protection
09/22/2025
Permit issued — Sidewalk Shed
B00914505-I1-FN
09/10/2025
Filed — Alteration
SPRINKLER APPLICATION FILED HEREWITH FOR SPRINKLER WORK
B01274227-I1
08/19/2025
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/19/2025
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
07/09/2025
Objection resolved — Addressed
07/09/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Addressed
06/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
06/20/2025
Special inspection requirement — Mechanical Systems
06/20/2025
Special inspection requirement — Maintenance information
06/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
06/20/2025
Special inspection requirement — Shutoff dampers
06/20/2025
Special inspection requirement — Energy Code Compliance Inspections
06/20/2025
Special inspection requirement — Final
06/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
06/20/2025
Special inspection requirement — Heating Systems
06/20/2025
Special inspection requirement — Duct leakage testing, insulation and design
06/10/2025
Permit issued — General Construction
B01048718-I1-GC
06/09/2025
Objection raised — Scope
06/06/2025
Violation issued (HPD, closed)
A
06/06/2025
Objection raised — Admin
Latest 60 of 191 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGOLDEN BUILDERS NY INC06/24/2026
DOB NOWConstruction FenceSigned-offGOLDEN BUILDERS NY INC05/21/2026
DOB NOWSprinklersPermit IssuedTARGET PIPING NY LLC01/08/2026
DOB NOWSidewalk ShedSigned-offGOLDEN BUILDERS NY INC09/22/2025
DOB NOWGeneral ConstructionSigned-offGOLDEN BUILDERS NY INC06/10/2025
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS04/01/2025
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS04/01/2025
DOB NOWSupported ScaffoldSigned-offGOLDEN BUILDERS NY INC09/18/2024
DOB NOWGeneral ConstructionSigned-offGOLDEN BUILDERS NY INC05/10/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS04/17/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS04/17/2024
DOB NOWSupported ScaffoldSigned-offACE GROUP NY CORP08/08/2023
DOB NOWSupported ScaffoldSigned-offACE GROUP NY CORP08/08/2023
DOB NOWConstruction FenceSigned-offACE GROUP NY CORP08/08/2023
1 project · most recent 05/27/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/27/2025——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM42NAMHZ 48,000 BTU · Split System ×4
MXZ-SM36NAM2-U 42,000 BTU · Split System ×2
MXZ-SM36NAMHZ 42,000 BTU · Split System ×2
MXZ-SM48NAMHZ 54,000 BTU · Split System ×2
MXZ-SM60NAM2 66,000 BTU · Split System ×2
PUZ-A18NKA7 20,000 BTU · Split System ×2
2 projects · most recent 09/10/2025
Sprinkler System
FiledStatusContractorScope
09/10/2025Permit IssuedTARGET PIPING NY LLC105 heads
05/27/2025——Sprinkler System
2 projects · most recent 09/10/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/10/2025———
02/06/2025——Gas, Storm, Water/Sanitary
3 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedSPARK ELECTRICAL SVCS LLC5 meters, 5 new_meters
08/04/2025Permit IssuedDUNRITE ELECTRICAL CORPGeneral Wiring
04/10/2024CompleteRICHARD NEU—
2 projects · most recent 05/28/2025
Steel Masonry
FiledStatusContractorScope
05/28/2025——1 scope_items
05/27/2025——Steel, Masonry
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
08/19/2025Post-installed AnchorsSHAHRIAR QUAYYUMspecial
08/19/2025Sprinkler SystemsSHAHRIAR QUAYYUMspecial
08/19/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/20/2025HVAC-R and service water heating equipment—energy_progress
06/20/2025Heating Systems—special
06/20/2025Fire-Resistant Penetrations and Joints—special
06/20/2025Mechanical Systems—special
06/20/2025Energy Code Compliance Inspections—progress
06/20/2025Final—progress
06/20/2025Shutoff dampers—energy_progress
06/20/2025HVAC-R and service water heating system controls—energy_progress
06/20/2025Duct leakage testing, insulation and design—energy_progress
06/20/2025Maintenance information—energy_progress
06/20/2025HVAC-R and service water piping design and insulation—energy_progress
05/21/2025Structural Steel - Details—special
05/21/2025Structural Steel - Welding—special
05/21/2025Structural Steel - High Strength Bolting—special
05/21/2025Structural Stability – Alterations of existing buildings—special
05/21/2025Post-installed Anchors—special
05/21/2025Masonry—special
05/21/2025Structural Cold-Formed Steel—special
05/16/2025Subgrade Inspections—special
05/16/2025Excavations - Sheeting, Shoring, and Bracing—special
04/08/2025Duct leakage testing, insulation and design—energy_progress
04/08/2025HVAC-R and service water heating system controls—energy_progress
Latest 25 of 68.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026B00914505-I1Request digital key ↗
08/26/2026B00999356-I1Request digital key ↗
08/25/2026B01036217-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00999356-I1Open ↗
08/13/2026B01127450-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01127450-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01127450-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/27/2026B00914505-I1Open ↗
08/26/2026B00999356-I1Open ↗
08/25/2026B01036217-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01274227-I1Open ↗
09/12/2026B01127450-S6Open ↗
08/24/2026B01048718-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B01048718-I1Open ↗
08/22/2026B01174131-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026B01127450-S5Open ↗
08/13/2026B01127450-S6Open ↗
08/13/2026B01127450-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice to Proceed2
08/13/2026B01048718-I1Open ↗
08/13/2026B01174131-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026B01227224-I1Open ↗
08/13/2026B01127450-S2Open ↗
▸Other Documents5
▸DOB NOWSite Survey: Initial2
08/13/2026B00999356-I1Open ↗
08/13/2026B01127450-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01227224-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01127450-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B01127450-I1Open ↗