← Back
Two stories - detached, small or mid-size
8 MELBA COURT
💬 Discuss this project
1930Year Built
1.5Stories
A1Building Class
R4-1Zoning
1,056 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 1,800 sf lot · 0.59 FAR built · Flood zone AE
Locations of Work
Structural
Site & exterior1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAM ENGINEER PC111/10/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L2 CONSTRUCTION INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM ENGINEER PC1180111/10/2021
Building Lifecycle
All (5)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Inspection (1)
02/08/2022
Signed off — Alteration
B00622237-I1
01/27/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/22/2021
Permit issued — Structural
B00622237-I1-GC-CX
11/10/2021
Filed — Alteration
B00622237-I1
07/26/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offL2 CONSTRUCTION INC12/22/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/27/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/31/2026B00622237-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/31/2026B00622237-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/31/2026B00622237-I1Open ↗