← Back
Walk-up cooperative
8 SIDNEY PLACE
BROOKLYN · BIN 3002499
💬 Discuss this project
1845Year Built
4Stories
C6Building Class
R6Zoning
4,485 sfGross Floor Area
5Units
Rent Stabilized21 Open Violations ▸
Walk-up cooperative · Owner of record: BEGUELIN CORP · 1,760 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BEGUELIN907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANTHONY BONSIGNORE, RA107/06/2023
PETRACCA DESIGN AND ENGINEERING, PC105/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANTHONY BONSIGNORE RA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GSTRUCTION CORPGeneral Contractor207/08/2026
BEACH JR, WILLIAMElectrical103/21/2026
LONERGAN, JOHNElectrical103/21/2026
SMITH, JOELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AVT ENGINEERING345207/06/2023
Building Lifecycle
All (74)Filed (2)Permit Issued (2)Signed Off (2)Violation (38)Inspection (2)Objection (16)Special Inspection (12)
05/05/2026
Violation issued (HPD, closed)
A
06/10/2025
Violation issued (HPD, closed)
A
12/04/2023
Signed off — Alteration
REMOVE PORTIONS OF BRICK VENEER REPAIR REPLACE PORTIONS OF DAMAGED MASONRY BEARING WALLS, INSTALL NEW 4" BRICK VENEER FINISH, ALL ON THE SIDE YARD FROM GRADE OR BASEMENT LEVEL UP TO THE UNDERSIDE OF THE 2ND FLOOR, FLOOR LEVEL.
B00887639-I1
12/01/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/30/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/15/2023
Signed off — Alteration
PROVIDE EMERGENCY INTERIOR SHORING FROM THE CELLAR TO THE 4TH FLOOR, PROVIDE EMERGENCY EXTERIOR SHORING ON PORTIONS OF THE SIDE LOT LINE WALLS ON THE 1ST & 2ND FLOORS ALL AS PER PLANS FILED
B00866871-I1
10/31/2023
Permit issued — General Construction
B00887639-I1-GC-CX
07/12/2023
Objection raised — Admin
07/12/2023
Objection resolved — Addressed
07/12/2023
Objection raised — Structural
07/12/2023
Objection resolved — Addressed
07/12/2023
Objection raised — Scope
07/12/2023
Objection resolved — Addressed
07/12/2023
Objection raised — Other
07/12/2023
Objection resolved — Addressed
07/12/2023
Objection raised — Admin
07/12/2023
Objection resolved — Addressed
07/12/2023
Objection raised — Scope
07/12/2023
Objection resolved — Addressed
07/12/2023
Objection raised — Scope
07/12/2023
Objection resolved — Addressed
07/06/2023
Filed — Alteration
REMOVE PORTIONS OF BRICK VENEER REPAIR REPLACE PORTIONS OF DAMAGED MASONRY BEARING WALLS, INSTALL NEW 4" BRICK VENEER FINISH, ALL ON THE SIDE YARD FROM GRADE OR BASEMENT LEVEL UP TO THE UNDERSIDE OF THE 2ND FLOOR, FLOOR LEVEL.
B00887639-I1
06/08/2023
Special inspection requirement — Fenestration air leakage
JOSEPH PASATURO
06/08/2023
Special inspection requirement — Fenestration areas
JOSEPH PASATURO
06/08/2023
Special inspection requirement — Air barrier - visual inspection
JOSEPH PASATURO
06/08/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
JOSEPH PASATURO
06/08/2023
Special inspection requirement — Masonry
JOSEPH PASATURO
06/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSEPH PASATURO
06/08/2023
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH PASATURO
06/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH PASATURO
06/08/2023
Special inspection requirement — Final
JOSEPH PASATURO
05/22/2023
Permit issued — Structural
B00866871-I1-ST
05/17/2023
Objection raised — Admin
05/17/2023
Objection resolved — Addressed
05/12/2023
Filed — Alteration
PROVIDE EMERGENCY INTERIOR SHORING FROM THE CELLAR TO THE 4TH FLOOR, PROVIDE EMERGENCY EXTERIOR SHORING ON PORTIONS OF THE SIDE LOT LINE WALLS ON THE 1ST & 2ND FLOORS ALL AS PER PLANS FILED
B00866871-I1
04/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSEPH PASATURO
04/28/2023
Special inspection requirement — Final
JOSEPH PASATURO
04/28/2023
Special inspection requirement — Structural Steel - Details
JOSEPH PASATURO
03/28/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/28/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2023
Violation issued (HPD, closed)
A
03/02/2022
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
I
10/14/2015
Violation issued (HPD, closed)
I
05/25/2006
Violation issued (ECB, closed)
Construction
04/17/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/1988
Violation issued (HPD, open)
B
10/01/1987
Violation issued (HPD, open)
B
10/01/1987
Violation issued (HPD, open)
A
10/01/1987
Violation issued (HPD, open)
B
10/01/1987
Violation issued (HPD, open)
C
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGSTRUCTION10/31/2023
DOB NOWStructuralSigned-offGSTRUCTION05/22/2023
BISMHISSUEDSAGE BUILDERS CORP10/09/2018
BISPLISSUEDPRACTICAL PLBG & HTG INC07/13/2018
BISOTISSUEDSAGE BUILDERS CORP07/12/2018
BISOTISSUEDMANNY IRON WORKS01/05/2007
1 project · most recent 06/18/2019
General Wiring Lighting
FiledStatusContractorScope
06/18/2019Permit IssuedY.S ELECTRICGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/01/2023Pass-Final General Construction Non-Directive 14PassView ↗
11/30/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/08/2023Fenestration air leakageJOSEPH PASATUROenergy_progress
06/08/2023Fenestration areasJOSEPH PASATUROenergy_progress
06/08/2023Air barrier - visual inspectionJOSEPH PASATUROenergy_progress
06/08/2023Fenestration and door U-factor and product ratingsJOSEPH PASATUROenergy_progress
06/08/2023MasonryJOSEPH PASATUROspecial
06/08/2023Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
06/08/2023Energy Code Compliance InspectionsJOSEPH PASATUROprogress
06/08/2023Fire-Resistance Rated ConstructionJOSEPH PASATUROprogress
06/08/2023FinalJOSEPH PASATUROprogress
04/28/2023Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
04/28/2023FinalJOSEPH PASATUROprogress
04/28/2023Structural Steel - DetailsJOSEPH PASATUROspecial
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026B00866871-I1Request digital key ↗
08/14/2026B00887639-I1Request digital key ↗
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION5
10/10/2018321752947Open ↗
10/10/2018321752947Open ↗
07/19/2018321752947Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
11/28/2022321752947Open ↗
05/25/2018321752947Open ↗
05/04/2018321752947Open ↗
▸DOB NOWLPC Approval/Permit2
08/13/2026B00866871-I1Open ↗
08/13/2026B00887639-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B00866871-I1Open ↗
08/23/2026B00887639-I1Open ↗
08/23/2026B00887639-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/12/2018321752947Open ↗
07/12/2018321752947Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00887639-I1Open ↗
08/13/2026B00866871-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00866871-I1Open ↗
08/23/2026B00887639-I1Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/25/2022321752947Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/25/2022321752947Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/04/2018321752947Open ↗
▸Safety & Tenant Protection2
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/24/2018321752947Open ↗
▸BISTenant Protection Plan and Notes1
05/04/2018321752947Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00866871-I1Open ↗
08/13/2026B00887639-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/11/2018321752947Open ↗
▸Energy Compliance8
▸BISAIR SEALING AND INSULATION - VISUAL1
09/25/2022321752947Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/25/2022321752947Open ↗
▸BISLIGHTING IN DWELLING UNITS1
09/25/2022321752947Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/25/2022321752947Open ↗
▸BISLIGHTING CONTROLS1
09/25/2022321752947Open ↗
▸BIS* HVAC INSULATION AND SEALING1
09/25/2022321752947Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/25/2022321752947Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/12/2018321752947Open ↗
▸Inspections & Test Reports3
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
09/27/2022321752947Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/27/2022321752947Open ↗
▸BISMECHANICAL SYSTEMS1
09/27/2022321752947Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/04/2018321752947Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/14/2022321752947Open ↗
▸BISLANDMARKS SIGNOFF1
09/26/2022321752947Open ↗
▸BISFINAL1
09/25/2022321752947Open ↗
▸BISLANDMARKS APPROVAL1
06/11/2018321752947Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
09/20/2022321752947Open ↗
05/04/2018321752947Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/23/2022321752947Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
07/12/2018321752947Open ↗
▸BISEFILING COVER SHEET1
05/04/2018321752947Open ↗
▸Other Documents2
▸BISMAINTENANCE INFORMATION1
09/25/2022321752947Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00887639-I1Open ↗