Condo, residential unit in 2-10 unit building
8 WINDSOR PLACE
BROOKLYN · BIN 3378194
💬 Discuss this project
1920Year Built
4Stories
R1Building Class
R6AZoning
5,394 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential unit in 2-10 unit building · Owner of record: URD 8 WINDSOR LLC · 2,000 sf lot · 2.7 FAR built · Flood zone X
Locations of Work
StructuralMechanical
Bulkhead1p · 1 filing · 20 docs
Floor 441p · 1 filing · 20 docs
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
U R DEVELOPMENT5707/08/2026
TOPLINE NYC CONTRACTING307/08/2026
HD BUILDERS NY503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INFOCUS DESIGN AND PLANNING PC1308/17/2023
PAUL PERDEK, PROF. ENG. PLLC109/02/2022
MOHAMMAD AHEAD, PE105/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XH&RC PLUMBING AND HEATING INC2603/21/2026
DANICO SERVICES203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HD BUILDERS NY LLCGeneral Contractor2507/08/2026
HD BUILDERS NYGeneral Contractor303/22/2026
WU (WOODY) CHENElectrical303/21/2026
VILLAGE P & H NY INCFire Protection207/08/2026
VILLAGE P & H NY INCPlumbing207/08/2026
JJS MANAGEMENT INCGeneral Contractor107/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT40811108/17/2023
Building Lifecycle
All (96)Filed (15)Permit Issued (18)Signed Off (9)Violation (7)Inspection (9)Objection (8)Special Inspection (30)
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/25/2023
Signed off — Alteration
Proposed sprinkler and plumbing in conjunction withB00463711-I1
B00463711-I1
08/24/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/22/2023
Signed off — Alteration
Proposed sprinkler and plumbing in conjunction withB00463711-I1
B00463711-S2
08/22/2023
Signed off — Alteration
Proposed sprinkler and plumbing in conjunction withB00463711-I1
B00463711-S3
08/18/2023
Signed off — Alteration
Proposed sprinkler and plumbing in conjunction withB00463711-I1
B00463711-S4
08/17/2023
Filed — Alteration
Proposed sprinkler and plumbing in conjunction withB00463711-I1
B00463711-P7
08/17/2023
Signed off — Alteration
Proposed sprinkler and plumbing in conjunction withB00463711-I1
B00463711-S5
08/17/2023
Signed off — Alteration
Proposed sprinkler and plumbing in conjunction withB00463711-I1
B00463711-S6
08/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALDO BRAVO
08/16/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
ALDO BRAVO
08/16/2023
Special inspection requirement — Fenestration air leakage
ALDO BRAVO
08/16/2023
Special inspection requirement — Permanent certificate
ALDO BRAVO
08/16/2023
Special inspection requirement — Lighting controls
ALDO BRAVO
08/16/2023
Special inspection requirement — Air barrier - visual inspection
ALDO BRAVO
08/16/2023
Special inspection requirement — Insulation placement and R values
ALDO BRAVO
08/16/2023
Special inspection requirement — Protection of exposed foundation insulation
ALDO BRAVO
08/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
ALDO BRAVO
08/16/2023
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
08/16/2023
Special inspection requirement — Maintenance information
ALDO BRAVO
08/16/2023
Special inspection requirement — Fenestration areas
ALDO BRAVO
08/16/2023
Special inspection requirement — Lighting in dwelling units
ALDO BRAVO
08/16/2023
Special inspection requirement — Interior lighting power
ALDO BRAVO
08/16/2023
Special inspection requirement — Masonry
ALDO BRAVO
08/16/2023
Special inspection requirement — Preliminary
ALDO BRAVO
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
08/16/2023
Special inspection requirement — Concrete - Cast-In-Place
ALDO BRAVO
08/16/2023
Special inspection requirement — Subgrade Inspections
ALDO BRAVO
08/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALDO BRAVO
08/16/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
08/16/2023
Special inspection requirement — Energy Code Compliance
ALDO BRAVO
08/16/2023
Special inspection requirement — Metering
ALDO BRAVO
08/16/2023
Special inspection requirement — Exterior lighting power
ALDO BRAVO
08/11/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/27/2023
Permit issued — General Construction
B00463711-I1-GC
05/15/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00730784-I1
05/11/2023
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
05/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ALDO BRAVO
05/11/2023
Special inspection requirement — Post-installed Anchors
ALDO BRAVO
05/11/2023
Special inspection requirement — Sprinkler Systems
ALDO BRAVO
05/11/2023
Special inspection requirement — Maintenance information
ALDO BRAVO
05/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
ALDO BRAVO
05/10/2023
Filed — Alteration
Proposed sprinkler and plumbing in conjunction withB00463711-I1
B00463711-P4
05/09/2023
Filed — Alteration
Proposed sprinkler and plumbing in conjunction withB00463711-I1
B00463711-P6
05/05/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/02/2023
Permit issued — Plumbing
B00463711-S5-PL
05/02/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/01/2023
Permit issued — Plumbing
B00463711-S5-EW-SP
04/28/2023
Signed off — Alteration
B00791984-I1
04/28/2023
Signed off — Alteration
Proposed sprinkler and plumbing in conjunction withB00463711-I1
B00463711-S1
04/03/2023
Violation issued (ECB, closed)
Construction
12/08/2022
Permit issued — General Construction
B00463711-I1-GC
11/07/2022
Permit issued — Mechanical Systems
B00463711-S6-MS
10/21/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/21/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/03/2022
Permit issued — Supported Scaffold
B00791984-I1-SF
09/02/2022
Filed — Alteration
B00791984-I1
07/13/2022
Violation issued (ECB, closed)
Unknown
06/23/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHD BUILDERS NY LLC07/27/2023
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC05/02/2023
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC05/01/2023
DOB NOWGeneral ConstructionSigned-offHD BUILDERS NY LLC12/08/2022
DOB NOWMechanical SystemsSigned-offHD BUILDERS NY LLC11/07/2022
DOB NOWSupported ScaffoldSigned-offJJS MANAGEMENT INC09/03/2022
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING05/05/2022
DOB NOWSprinklersSigned-offVILLAGE P & H NY INC04/11/2022
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC04/11/2022
DOB NOWGeneral ConstructionSigned-offHD BUILDERS NY LLC01/12/2022
DOB NOWGeneral ConstructionSigned-offHD BUILDERS NY LLC01/07/2022
DOB NOWConstruction FenceSigned-offHD BUILDERS NY LLC01/07/2022
DOB NOWSupport of ExcavationSigned-offHD BUILDERS NY LLC11/15/2021
DOB NOWStructuralSigned-offHD BUILDERS NY LLC11/12/2021
DOB NOWMechanical SystemsSigned-offHD BUILDERS NY LLC11/08/2021
DOB NOWFoundationSigned-offHD BUILDERS NY LLC11/06/2021
DOB NOWGeneral ConstructionSigned-offHD BUILDERS NY LLC11/04/2021
DOB NOWConstruction FenceSigned-offHD BUILDERS NY LLC10/28/2021
BIS—ISSUEDHD BUILDERS NY LLC08/02/2023
2 projects · most recent 09/01/2022
General Wiring
FiledStatusContractorScope
09/01/2022CompleteLIFE SPOT ELECTRIC CORPGeneral Wiring
05/09/2022CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/24/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/11/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/02/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/21/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 96
DateRequirementInspectorRole
08/16/2023Fenestration areasALDO BRAVOenergy_progress
08/16/2023Air barrier - visual inspectionALDO BRAVOenergy_progress
08/16/2023Fenestration and door U-factor and product ratingsALDO BRAVOenergy_progress
08/16/2023MeteringALDO BRAVOenergy_progress
08/16/2023MasonryALDO BRAVOspecial
08/16/2023PreliminaryALDO BRAVOprogress
08/16/2023Fire-Resistance Rated ConstructionALDO BRAVOprogress
08/16/2023Energy Code Compliance InspectionsALDO BRAVOprogress
08/16/2023Energy Code ComplianceALDO BRAVOprogress
08/16/2023Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
08/16/2023Subgrade InspectionsALDO BRAVOspecial
08/16/2023Structural Stability – Alterations of existing buildingsALDO BRAVOspecial
08/16/2023Fenestration air leakageALDO BRAVOenergy_progress
08/16/2023Protection of exposed foundation insulationALDO BRAVOenergy_progress
08/16/2023Insulation placement and R valuesALDO BRAVOenergy_progress
08/16/2023Maintenance informationALDO BRAVOenergy_progress
08/16/2023Lighting in dwelling unitsALDO BRAVOenergy_progress
08/16/2023Interior lighting powerALDO BRAVOenergy_progress
08/16/2023Permanent certificateALDO BRAVOenergy_progress
08/16/2023Lighting controlsALDO BRAVOenergy_progress
08/16/2023HVAC-R and service water piping design and insulationALDO BRAVOenergy_progress
08/16/2023Exterior lighting powerALDO BRAVOenergy_progress
08/16/2023Fire-Resistant Penetrations and JointsALDO BRAVOspecial
08/16/2023Concrete - Cast-In-PlaceALDO BRAVOspecial
05/11/2023Sprinkler SystemsALDO BRAVOspecial
Latest 25 of 96.
▾Documents — 176 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch11
09/01/2026B00463711-P2Request digital key ↗
09/01/2026B00463711-S5Request digital key ↗
09/01/2026B00463711-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/01/2026B00463711-P6Request digital key ↗
09/01/2026B00463711-I1Request digital key ↗
09/01/2026B00463711-P7Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION8
08/17/2023321599891Open ↗
04/05/2023322160638Open ↗
06/09/2022321599891Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
09/19/2023340807005Open ↗
▸BISWORK PERMIT APPLICATION1
08/03/2023321599891Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/26/2021340807005Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/04/2023321599891Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZoning Exhibit form (1-5)4
09/01/2026B00463711-P7Open ↗
09/01/2026B00463711-P6Open ↗
09/01/2026B00463711-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
09/01/2026B00463711-P6Open ↗
09/01/2026B00463711-I1Open ↗
09/01/2026B00463711-P7Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/27/2023322160638Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/27/2023322160638Open ↗
▸BISVERIFY TAX LOT1
10/12/2023321599891Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/27/2023322160638Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/15/2023321599891Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/27/2023322160638Open ↗
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature21
09/12/2026B00463711-S2Open ↗
09/02/2026B00463711-P3Open ↗
09/02/2026B00463711-P3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00463711-P6Open ↗
09/01/2026B00463711-P4Open ↗
09/01/2026B00463711-S4Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/12/2026B00463711-S2Open ↗
09/02/2026B00463711-P3Open ↗
09/02/2026B00463711-P3Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/26/2021340807005Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/26/2021340807005Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
09/01/2026B00463711-P1Open ↗
09/01/2026B00463711-P6Open ↗
09/01/2026B00463711-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection8
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
08/02/2023321599891Open ↗
03/26/2021340807005Open ↗
▸BISSTREET TREE CHECKLIST2
04/25/2024321599891Open ↗
09/10/2021340807005Open ↗
▸BISSTREET TREE SIGNOFF2
09/15/2023321599891Open ↗
08/29/2023340807005Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/26/2021340807005Open ↗
▸BISSTREET TREES SITE PLAN1
09/19/2023340807005Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/01/2026B00463711-P6Open ↗
09/01/2026B00463711-P4Open ↗
09/01/2026B00463711-S4Open ↗
Showing 3 of 11 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
09/01/2026B00463711-I1Open ↗
09/01/2026B00463711-S5Open ↗
08/13/2026B00463711-S6Open ↗
▸Inspections & Test Reports14
▸DOB NOWSOIL REPORT7
09/01/2026B00463711-P6Open ↗
09/01/2026B00463711-S4Open ↗
09/01/2026B00463711-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTR4 Plot Diagram3
09/01/2026B00463711-S4Open ↗
09/01/2026B00463711-S3Open ↗
09/01/2026B00463711-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram3
09/01/2026B00463711-S4Open ↗
09/01/2026B00463711-S3Open ↗
09/01/2026B00463711-I1Open ↗
▸BISBPP: FIELD INSPECTION1
09/20/2023340807005Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE2
03/11/2022321599891Open ↗
07/19/2021321599891Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
09/20/2023340807005Open ↗
09/20/2023340807005Open ↗
▸BISBPP: FINAL SIGNOFF1
09/20/2023340807005Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/27/2023322160638Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT (FINAL): PW31
09/20/2023321599891Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
09/20/2023340807005Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
09/01/2026B00463711-I1Open ↗
▸DOB NOWCertificate of Insurance1
09/01/2026B00463711-I1Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION5
09/06/2023321599891Open ↗
08/30/2023321599891Open ↗
07/26/2022321599891Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/26/2021340807005Open ↗
▸BISEFILING COVER SHEET1
04/05/2023322160638Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/26/2021340807005Open ↗
▸BISBOROUGH INTAKE FORM1
04/05/2023322160638Open ↗
▸Other Documents26
▸DOB NOWPlot Diagram7
09/01/2026B00463711-P6Open ↗
09/01/2026B00463711-S4Open ↗
09/01/2026B00463711-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
09/01/2026B00463711-P6Open ↗
09/01/2026B00463711-I1Open ↗
09/01/2026B00463711-P7Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
09/20/2023340807005Open ↗
09/20/2023340807005Open ↗
09/19/2023340807005Open ↗
▸DOB NOWSite Survey: Initial3
09/01/2026B00463711-P6Open ↗
09/01/2026B00463711-I1Open ↗
09/01/2026B00463711-P7Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
09/19/2023340807005Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
09/20/2023340807005Open ↗
▸BISRESTRICTION: DEED1
04/27/2023322160638Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
04/27/2023322160638Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
09/20/2023340807005Open ↗
▸BISPLOT DIAGRAM1
04/27/2023322160638Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/10/2021340807005Open ↗
▸DOB NOWAdjoining Owners Notification1
09/01/2026B00463711-S4Open ↗
▸DOB NOWAdditional Insured Authorizations1
09/01/2026B00463711-I1Open ↗