Elevator cooperative
Eighty East End
80 EAST END AVENUE · Upper East Side-Yorkville · BIN 1051198
💬 Discuss this project
1958Year Built
20Stories
D4Building Class
R10AZoning
182,000 sfGross Floor Area
154Units
LL97 CoveredRent Stabilized14 Open Violations 8 unresolved · 6 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: EIGHTY EAST END OWNERS CORP · 15,120 sf lot · 12.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 5 filings · 20 docs
Penthouse16p · 2 filings · 20 docs
Floor 1911p · 2 filings · 20 docs
Floor 187p · 1 filing · 15 docs
Floor 177p · 1 filing · 15 docs
Floor 16
Floor 152p · 2 filings · 17 docs
Floor 14Under Construction6p · 1 filing · 11 docs
Floor 131p · 1 filing · 7 docs
Floor 125p · 1 filing · 12 docs
Floor 11
Floor 10Under Construction11p · 2 filings · 19 docs
Floor 92p · 1 filing · 8 docs
Floor 8
Floor 74p · 2 filings · 6 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11 filing · 5 docs
Cellar4p · 2 filings · 14 docs
Sub-Basement1 filing · 5 docs
Site & exteriorUnder Construction41p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
80 EAST END OWNERS10303/22/2026
80 EAST END803/21/2026
80 EAST END AVE603/22/2026
80 E E OWNERS303/21/2026
THIRD EQUITY OWNERS203/21/2026
80E.E.AVE. OWNERS COR. OF INSIGN203/21/2026
DOUGLAS ELLIMAN PROPERTY MANAGEM203/21/2026
80E E AVE OWNERS COR OF INSIGN203/21/2026
EIGHTY EAST END OWNERS CORP103/22/2026
PHOENIX 132 SUTTON STREET103/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEM INSTALLATIONGeneral Contractor507/08/2026
AM&G WATERPROOFING LLCGeneral Contractor407/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/08/2026
ROBINSON INVESTMENT GROUPGeneral Contractor303/21/2026
NYC NEWLINE CONTRACTORSGeneral Contractor303/21/2026
A.C.& H. MAINTENANCE CORPGeneral Contractor303/21/2026
HELLO CHAPTER LLCGeneral Contractor309/18/2026
PROLINE RESTORATION SVCGeneral Contractor307/08/2026
R.J.C. MECHANICAL CORPPlumbing207/08/2026
CREGGAN ELECTRIAL CORPElectrical203/22/2026
CRYSTAL COMFORT INCGeneral Contractor203/21/2026
SPIRIDON MIHAILGeneral Contractor207/08/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
TRINCERI, SALVATOREElectrical103/21/2026
WAITE, JERMAINEElectrical103/21/2026
P & Z ELECTRIC CORPElectrical103/22/2026
K & G ELECTRIC CO., INC.Electrical103/22/2026
HENRY KHODOSHElectrical103/21/2026
ETHOS PLUMBING CORPPlumbing107/08/2026
GOTHAM WIRING LICENSEDElectrical103/22/2026
ESPOSITO, RICHARDElectrical103/21/2026
LIVOTI ENTERPRISE LLCGeneral Contractor107/08/2026
EMPIRE LIC ELECL CONTRSElectrical103/22/2026
POLER CONTRACTING INCGeneral Contractor107/08/2026
CJC ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A2 ARCHITECT, PC2504205/12/2026
C.M. TESTING LABORATORY,1352209/23/2025
SPECIAL TESTING & CONSULT1688408/19/2025
METRIC CONSULTING AND INS1803207/15/2025
O'ROURKE ENGINEERING, LLC5873109/07/2023
GROUP-S LLC5216109/07/2023
WINTON GROUP ARCHITECTURE4343209/20/2021
KCE CONSULTING ENGINEERIN3712112/15/2020
SCHERER DESIGN GROUP7921111/16/2020
Building Lifecycle
All (230)Filed (41)Permit Issued (33)Signed Off (18)Facade (FISP) (15)Violation (60)Inspection (15)Objection (18)Special Inspection (30)
09/17/2026
Permit issued — General Construction
M01283825-I1-GC
09/01/2026
Permit issued — Structural
M01147169-S1-ST
07/31/2026
Permit issued — General Construction
M01393974-I1-GC
07/15/2026
Signed off — Alteration
INSTALLATION OF MATERIAL ONLY HOISTS AS PER DRAWINGS. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01256738-I1
06/16/2026
Permit issued — General Construction
M01147169-I1-GC
06/12/2026
Objection resolved — Resolved
06/12/2026
Objection resolved — Resolved
06/12/2026
Objection resolved — Resolved
06/09/2026
Objection raised — Scope
06/09/2026
Objection raised — Scope
06/09/2026
Objection raised — Scope
06/08/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01138787-I1
06/04/2026
Signed off — Alteration
M01138788-I1
05/12/2026
Filed — Alteration
INTERIOR COMBINATION OF APARTMENTS 10F AND 10G ON THE 10TH FLOOR AS PER TPPN 3/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01393974-S1
05/12/2026
Filed — Alteration
INTERIOR COMBINATION OF APARTMENTS 10F AND 10G ON THE 10TH FLOOR AS PER TPPN 3/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01393974-I1
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
04/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/10/2025
Permit issued — Supported Scaffold
M01138788-I1-SF
11/10/2025
Permit issued — Sidewalk Shed
M01138787-I1-SH
10/16/2025
Permit issued — Plumbing
M01283825-S1-PL
10/10/2025
Permit issued — General Construction
M01283825-I1-GC
09/23/2025
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF FIXTURES IN APARTMENT 14DE LOCATED ON THE 14TH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01283825-I1
09/23/2025
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF FIXTURES IN APARTMENT 14DE LOCATED ON THE 14TH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01283825-S1
09/17/2025
Special inspection requirement — Post-installed Anchors
JOHN SEMIOLI
09/08/2025
Special inspection requirement — Final
JOHN SEMIOLI
09/08/2025
Special inspection requirement — Lighting in dwelling units
JOHN SEMIOLI
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
09/08/2025
Special inspection requirement — Lighting controls
JOHN SEMIOLI
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
09/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOHN SEMIOLI
08/19/2025
Filed — Alteration
Filing for sidewalk leak repairs. No change in use, occupancy or egress.
M01147169-P1
07/29/2025
Permit issued — General Construction
M01189849-I1-GC
07/22/2025
Permit issued — Protection and Mechanical Methods
M01256738-I1-PMM
07/21/2025
Filed — Alteration
INSTALLATION OF MATERIAL ONLY HOISTS AS PER DRAWINGS. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01256738-I1
07/16/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
07/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
07/16/2025
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
07/16/2025
Special inspection requirement — Final
William Struth
07/16/2025
Special inspection requirement — Energy Code Compliance Inspections
William Struth
07/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/15/2025
Filed — Alteration
Filing for repairs of the shelf angles on 10th and 17th fl. No change in use, occupancy or egress.
M01189849-P1
07/15/2025
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
07/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/15/2025
Special inspection requirement — Final
William Struth
07/15/2025
Special inspection requirement — Energy Code Compliance Inspections
William Struth
07/15/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
07/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/18/2025
Filed — Alteration
Filing for repairs of the shelf angles on 10th and 17th fl. No change in use, occupancy or egress.
M01189849-I1
06/04/2025
Objection resolved — Addressed
05/22/2025
Signed off — Alteration
INTERIOR RENOVATION OF UNIT 12E ON THE 12TH FLOOR. REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS, NEW FINISHES AND MILLWORK PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00996455-I1
05/08/2025
Filed — Alteration
Filing for sidewalk leak repairs. No change in use, occupancy or egress.
M01147169-S1
05/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
05/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01138787-P1
04/30/2025
Filed — Alteration
M01138788-P1
Latest 60 of 230 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHELLO CHAPTER LLC09/17/2026
DOB NOWStructuralPermit IssuedAM&G WATERPROOFING LLC09/01/2026
DOB NOWGeneral ConstructionPermit IssuedRITE WAY CONSTR GROUP COR07/31/2026
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC06/16/2026
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC11/10/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC11/10/2025
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC10/16/2025
DOB NOWGeneral ConstructionPermit IssuedHELLO CHAPTER LLC10/10/2025
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC07/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offAM&G WATERPROOFING LLC07/22/2025
DOB NOWGeneral ConstructionSigned-offROBINSON INVESTMENT GROUP02/13/2025
DOB NOWPlumbingSigned-offDC BUILDING SERVICES INC02/12/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC11/12/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC11/12/2024
DOB NOWGeneral ConstructionSigned-offHELLO CHAPTER LLC10/15/2024
DOB NOWGeneral ConstructionSigned-offNYC NEWLINE CONTRACTORS02/12/2024
DOB NOWMechanical SystemsSigned-offCRYSTAL COMFORT09/28/2023
DOB NOWGeneral ConstructionSigned-offSPIRIDON MIHAIL12/02/2022
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP12/02/2022
DOB NOWGeneral ConstructionSigned-offPOLER CONTRACTING INC08/01/2022
DOB NOWGeneral ConstructionSigned-offPROLINE RESTORATION SVC02/10/2022
DOB NOWAntennaSigned-offLIVOTI ENTERPRISE LLC10/21/2021
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP10/08/2021
DOB NOWGeneral ConstructionPermit IssuedPROLINE RESTORATION SVC10/04/2021
DOB NOWPlumbingSigned-offETHOS PLUMBING CORP08/18/2021
DOB NOWGeneral ConstructionSigned-offSPIRIDON MIHAIL08/12/2021
DOB NOWPlumbingSigned-offANTHONY DISABATO07/28/2021
DOB NOWMechanical SystemsSigned-offA.C.& H. MAINTENANCE CORP03/20/2021
DOB NOWPlumbingSigned-offANTHONY DISABATO03/10/2020
DOB NOWPlumbingSigned-offAL PLUMBING & CONT. INC02/03/2020
DOB NOWSupported ScaffoldPermit IssuedINTERSYSTEM INSTALLATION10/18/2019
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION10/09/2019
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION11/29/2018
BISOTISSUEDJOHN PETROCELLI CONSTRUCTION06/03/2021
BISOTISSUEDJOHN PETROCELLI CONSTRUCTION03/17/2020
BISOTISSUEDJOHN PETROCELLI CONSTRUCTION03/17/2020
BISOTISSUEDJOHN PETROCELLI CONSTRUCTION03/02/2020
BISOTISSUEDJOHN PETROCELLI CONSTRUCTION03/02/2020
BISOTISSUEDDELLALUNA CORP01/27/2020
BISOTISSUEDINTER RENOVATION INC01/21/2020
+ 43 more permits on file
3 projects · most recent 05/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/12/2026——Gas, Water/Sanitary
09/23/2025Signed-offHUDSON PLMBING & MCH, LLCGas, Water/Sanitary
09/20/2021Signed-offGREAT OAKS MECHANICAL INCGas, Water/Sanitary
25 projects · most recent 09/20/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
09/20/2026Permit IssuedGAUGE TECH ELECTRIC INCGeneral Wiring
03/19/2026Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
02/25/2026CompleteDENMAR ELECTRIC CORPGeneral Wiring
10/17/2025CompleteASCUATECH ELECTRICAL CORP—
11/14/2024CompleteBOROWIDE ELECT'L CONTR'S—
11/14/2024CompleteTITANIUM ELECTRICAL CORPGeneral Wiring
06/20/2024CompleteP & Z ELECTRIC CORPGeneral Wiring
05/14/2024CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
02/19/2024CompleteATHENS ELECTRIC INC.General Wiring
02/08/2024CompleteTHE METRO GROUP ELECTRICGeneral Wiring
09/18/2023CompleteCJC ELECTRIC INC—
07/12/2023CompleteNYCO ELECTRIC CORPGeneral Wiring
12/09/2022CompleteGOTHAM WIRING LICENSEDGeneral Wiring
03/14/2022CompleteMARTINEZ ELECTRICAL CONTGeneral Wiring
03/03/2022CompleteCREGGAN ELECTRIAL CORPGeneral Wiring
1 project · most recent 08/19/2025
Concrete
FiledStatusContractorScope
08/19/2025Permit IssuedAM&G WATERPROOFING LLCConcrete
2 projects · most recent 05/02/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
05/02/2025Signed-offANDAMIO SCAFFOLDING LLCSidewalk Shed
10/17/2019Permit IssuedINTERSYSTEM INSTALLATIONScaffold
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/12/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
05/12/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
09/17/2025Post-installed AnchorsJOHN SEMIOLIspecial
09/08/2025Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
09/08/2025Lighting controlsJOHN SEMIOLIenergy_progress
09/08/2025Lighting in dwelling unitsJOHN SEMIOLIenergy_progress
09/08/2025Fire-Resistance Rated ConstructionJOHN SEMIOLIprogress
09/08/2025Energy Code Compliance InspectionsJOHN SEMIOLIprogress
09/08/2025FinalJOHN SEMIOLIprogress
07/16/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/16/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
07/16/2025Post-installed AnchorsSAMI HAJJAR P.Especial
07/16/2025Energy Code Compliance InspectionsWilliam Struthprogress
07/16/2025FinalWilliam Struthprogress
07/16/2025MasonrySAMI HAJJAR P.Especial
07/15/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/15/2025Post-installed AnchorsSAMI HAJJAR P.Especial
07/15/2025Tenant Protection Plan Compliance—special
07/15/2025MasonrySAMI HAJJAR P.Especial
07/15/2025FinalWilliam Struthprogress
07/15/2025Energy Code Compliance InspectionsWilliam Struthprogress
05/07/2025Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
04/14/2025Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
04/14/2025FinalWilliam Struthprogress
01/22/2025FinalNikola Martinovicprogress
11/26/2024Lighting in dwelling unitsGeorge Showmanenergy_progress
Latest 25 of 66.
▾Documents — 671 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch25
09/06/2026M00103792-I1Request digital key ↗
09/02/2026M00670553-I1Request digital key ↗
09/01/2026M08040700-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Plumbing9
09/05/2026M00256979-I1Request digital key ↗
09/05/2026M00256979-P1Request digital key ↗
09/05/2026M00304150-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00463052-I1Request digital key ↗
09/03/2026M00475557-P1Request digital key ↗
09/03/2026M00475557-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00242296-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00247250-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
09/04/2026M00426279-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00436125-I1Request digital key ↗
▸Applications & Permits109
▸BISWORK PERMIT APPLICATION57
03/18/2020123867583Open ↗
03/18/2020123867583Open ↗
03/05/2020123867583Open ↗
Showing 3 of 57 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION52
02/18/2022140881865Open ↗
02/15/2022140881865Open ↗
05/06/2021103798892Open ↗
Showing 3 of 52 on file for this type
▸Seals & Professional Certifications179
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION58
02/14/2020123867583Open ↗
01/27/2020123790861Open ↗
01/27/2020123867583Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
09/05/2026M00256979-P2Open ↗
09/05/2026M00256979-I1Open ↗
09/05/2026M00256979-P1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
09/29/2026M08040700-P1Open ↗
09/01/2026M00670553-I1Open ↗
09/01/2026M00103792-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026M00670553-I1Open ↗
09/01/2026M01393974-S1Open ↗
09/01/2026M00996455-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
01/24/2020123790861Open ↗
09/14/2018123401005Open ↗
07/25/2018121630994Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
01/24/2020123790861Open ↗
12/24/2019140881865Open ↗
11/14/2019140874980Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/24/2019140881865Open ↗
11/14/2019140874980Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/24/2019140881865Open ↗
11/14/2019140874980Open ↗
▸Trade Schedules & Equipment59
▸BISSELF-CERT PLUMBING NOTICE27
12/10/2014121905992Open ↗
09/29/2014121905992Open ↗
07/09/2014121905992Open ↗
Showing 3 of 27 on file for this type
▸BISSCHEDULE B - PLUMBING21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
09/14/2018123401005Open ↗
06/01/2018123334962Open ↗
09/13/2017123334962Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
09/14/2018123401005Open ↗
02/06/2015121630994Open ↗
02/04/2015121630994Open ↗
Showing 3 of 4 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
09/14/2018121630994Open ↗
▸Safety & Tenant Protection14
▸DOB NOWTenant Protection Plan7
09/05/2026M00304150-I1Open ↗
09/05/2026M00304150-P1Open ↗
09/04/2026M00426279-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTenant Protection Plan and Notes5
01/24/2020123790861Open ↗
01/09/2020123867583Open ↗
09/13/2017123334962Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/05/2020123867583Open ↗
▸Environmental & Asbestos64
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/05/2026M00256979-P1Open ↗
09/05/2026M00256979-P2Open ↗
09/05/2026M00256979-I1Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
01/24/2020123790861Open ↗
01/09/2020123867583Open ↗
11/14/2019140874980Open ↗
Showing 3 of 15 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
09/16/2014122129204Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00996455-I1Open ↗
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
01/24/2020123790861Open ↗
01/24/2020123790861Open ↗
01/09/2020123867583Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
11/12/2021123867583Open ↗
03/23/2021123790861Open ↗
07/09/2020140874980Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/12/2021123867583Open ↗
07/09/2020140874980Open ↗
11/14/2019140874980Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
02/24/2015121905992Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
12/30/2019123401005Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/14/2019140874980Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00587923-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY7
11/12/2021123867583Open ↗
11/12/2021123867583Open ↗
03/23/2021123790861Open ↗
Showing 3 of 7 on file for this type
▸BISHYDRO FLOW TEST LETTER1
03/07/2019123334962Open ↗
▸Approvals, Objections & Sign-offs48
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
11/15/2021123867583Open ↗
03/23/2021123790861Open ↗
07/09/2020140874980Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/05/2020123867583Open ↗
07/23/2018121623065Open ↗
11/21/2014122129204Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
03/18/2020123867583Open ↗
01/21/2020140874980Open ↗
01/21/2020140881865Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/24/2026M01147169-I1Open ↗
▸Cost, Insurance & Ownership54
▸BISCOST AFFIDAVIT52
11/12/2021123867583Open ↗
03/23/2021123790861Open ↗
07/09/2020140874980Open ↗
Showing 3 of 52 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms48
▸BISEFILING COVER SHEET21
01/27/2020123867583Open ↗
01/24/2020123790861Open ↗
01/09/2020123867583Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION16
05/08/2019123401005Open ↗
07/26/2018121630994Open ↗
07/05/2018123334962Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM7
01/03/2020123401005Open ↗
03/07/2019123334962Open ↗
09/14/2018121630994Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/24/2019140881865Open ↗
11/14/2019140874980Open ↗
Showing 2 of 4 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION11
01/03/2020123401005Open ↗
09/12/2018121630994Open ↗
Showing 2 of 11 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type