BuildNYC
Office with commercial, 7-19 stories
Ember Charter High School
80 HUDSON AVENUE · BIN 3000116
💬 Discuss this project
1913Year Built
7Stories
O6Building Class
M1-2Zoning
75,500 sfGross Floor Area
1Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Office with commercial, 7-19 stories · 13,000 sf lot · 5.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofK9 Resorts, Boorum & Pease CompanyUnder Construction34p · 6 filings · 20 docs
Penthouse1p · 1 filing · 4 docs
Floor 7Ten to One, Boorum & Pease Company84p · 9 filings · 20 docs
Floor 6Boorum & Pease CompanyUnder Construction54p · 6 filings · 20 docs
Floor 5Ten to One68p · 9 filings · 20 docs
Floor 4Ten to One67p · 9 filings · 20 docs
Floor 3Plaza Management43p · 3 filings · 20 docs
Floor 2K9 ResortsUnder Construction78p · 5 filings · 20 docs
Floor 1K9 ResortsUnder Construction87p · 5 filings · 20 docs
CellarBoorum & Pease Company46p · 8 filings · 20 docs
BasementC"ANDNPOWER scope of work summary1p · 1 filing · 3 docs
Sub-BasementK9 ResortsUnder Construction5p · 1 filing · 18 docs
Site & exteriorK9 ResortsUnder Construction1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
78-84 Hudson Street703/22/2026
Ember Charter School203/21/2026
Phoenix103/21/2026
Globe Storage & Moving Co103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning803/21/2026
DVA Advisors1603/21/2026
Municipal Building Consultants703/21/2026
William Vitacco Associates1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GibianGeneral Contractor1009/07/2026
McCormack ContractingGeneral Contractor507/08/2026
Elysium ConstructionGeneral Contractor403/21/2026
Comalla ConstructionGeneral Contractor407/08/2026
Safety Fire SprinklerFire Protection307/08/2026
M&D Fire SprinklerFire Protection207/08/2026
Mmi Plumbing & HeatingPlumbing207/08/2026
Fulton Plumbing & HeatingPlumbing105/29/2026
Genesis Plumbing and HeatingPlumbing107/08/2026
Quadrant DevelopmentGeneral Contractor107/08/2026
CNJ EnterprisesGeneral Contractor104/09/2026
CT Ideal SuppressionGeneral Contractor107/08/2026
Palatine Hill ConstructionGeneral Contractor107/08/2026
G.E.O. ElectricElectrical103/21/2026
National MaintenanceSign hanger109/15/2026
Five Star P and H CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
World Design Architecture9323909/09/2026
Buildtech Engineering6369103/26/2026
Villa Pex Consulting Engineering8408103/26/2026
Crosscheck Inspection Services544602/24/2025
Alan Margolin & Associates423608/15/2024
Anz Consulting Engineering3946111/29/2023
Ace Structural Engineering496405/05/2021
Building Lifecycle
All (290)Filed (41)Permit Issued (33)Signed Off (7)Facade (FISP) (12)Violation (60)Inspection (28)Objection (79)Special Inspection (30)
09/24/2026
Objection resolved — Addressed
09/21/2026
Objection raised — Other
09/21/2026
Objection raised — Admin
09/14/2026
Permit issued — Sign
B01405020-I1-SG
09/09/2026
Filed — Alteration
Foundation work as shown on the plans.
B01119163-P1
09/09/2026
Filed — Alteration
Foundation work as shown on the plans.
B01119163-P2
08/26/2026
Special inspection requirement — Lighting controls
William Alicea
08/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
08/26/2026
Special inspection requirement — Post-installed Anchors
William Alicea
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
08/26/2026
Special inspection requirement — Post-installed Anchors
William Alicea
08/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
08/26/2026
Special inspection requirement — Maintenance information
William Alicea
08/26/2026
Special inspection requirement — Maintenance information
William Alicea
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
08/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
08/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
08/26/2026
Special inspection requirement — Exterior lighting power
William Alicea
08/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
William Alicea
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
08/26/2026
Special inspection requirement — Mechanical Systems
William Alicea
08/26/2026
Special inspection requirement — Final
William Alicea
08/26/2026
Special inspection requirement — Shutoff dampers
William Alicea
08/26/2026
Special inspection requirement — Interior lighting power
William Alicea
08/19/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2026
Permit issued — Foundation
B01119163-S6-FO
08/11/2026
Permit issued — Structural
B01119163-S5-ST
08/10/2026
Permit issued — Mechanical Systems
B01119163-S2-MS
08/10/2026
Permit issued — General Construction
B01119163-I1-GC
08/10/2026
Permit issued — General Construction
B01119163-S1-GC
07/15/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/01/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/02/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - K9 RESORTS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01405020-I1
06/02/2026
Special inspection requirement — Final
Israel Wertentheil
05/06/2026
Signed off — Alteration
Interior renovations as per plans herewith. No change to use, egress, or occupancy.
B00820883-I1
05/06/2026
Signed off — Alteration
THIS APPLICATION IS FILED FOR TEMPORARY USE PERMIT FOR A SCHOOL PURSUANT TO SECTION AC 28-111 AND BULLETIN 2010-002. NO NEW WORK TO BE PERFORMED. ALL EXISTING PARTITIONS, STAIR, ELEVATOR, SPRINKLER, FIRE ALARM AND ALL TO REMAIN
B01063973-I1
04/10/2026
Permit issued — Sprinklers
B01119163-S4-EW-SP
04/08/2026
Permit issued — Plumbing
B01119163-S3-PL
03/26/2026
Filed — Alteration
Mechanical application filed at 6th floor tenant space to furnish and complete the HVAC system installation.
B01370010-I1
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/26/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
03/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
David Marabi
03/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
03/26/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Marabi
03/16/2026
Special inspection requirement — Post-installed Anchors
Luis Pichardo
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
David Marabi
03/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2026
Special inspection requirement — Mechanical Systems
David Marabi
03/10/2026
Special inspection requirement — Final
David Marabi
02/25/2026
Permit issued — General Construction
B00820844-I1-GC
02/12/2026
Permit issued — Mechanical Systems
B01119163-S2-MS
02/12/2026
Permit issued — Structural
B01119163-S5-ST
02/12/2026
Permit issued — General Construction
B01119163-S1-GC
02/12/2026
Permit issued — General Construction
B01119163-I1-GC
02/12/2026
Permit issued — Foundation
B01119163-S6-FO
12/26/2025
Permit issued — General Construction
B01331959-I1-GC
Latest 60 of 290 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedNational Maintenance09/14/2026
DOB NOWFoundationPermit IssuedGibian08/11/2026
DOB NOWStructuralPermit IssuedGibian08/11/2026
DOB NOWMechanical SystemsPermit IssuedGibian08/10/2026
DOB NOWGeneral ConstructionPermit IssuedGibian08/10/2026
DOB NOWGeneral ConstructionPermit IssuedGibian08/10/2026
DOB NOWSprinklersPermit IssuedSafety Fire Sprinkler04/10/2026
DOB NOWPlumbingPermit IssuedFulton Plumbing & Heating04/08/2026
DOB NOWGeneral ConstructionPermit IssuedMcCormack Contracting02/25/2026
DOB NOWMechanical SystemsPermit IssuedGibian02/12/2026
DOB NOWStructuralPermit IssuedGibian02/12/2026
DOB NOWGeneral ConstructionPermit IssuedGibian02/12/2026
DOB NOWGeneral ConstructionPermit IssuedGibian02/12/2026
DOB NOWFoundationPermit IssuedGibian02/12/2026
DOB NOWGeneral ConstructionPermit IssuedCNJ Enterprises12/26/2025
DOB NOWMechanical SystemsSigned-offCT Ideal Suppression02/12/2025
DOB NOWSprinklersSigned-offSafety Fire Sprinkler01/27/2025
DOB NOWGeneral ConstructionSigned-offElysium Construction01/15/2025
DOB NOWGeneral ConstructionSigned-offMcCormack Contracting07/22/2024
DOB NOWPlumbingSigned-offGenesis Plumbing and Heating06/10/2024
DOB NOWGeneral ConstructionSigned-offElysium Construction03/14/2024
DOB NOWMechanical SystemsSigned-offMcCormack Contracting01/31/2024
DOB NOWGeneral ConstructionPermit IssuedPalatine Hill Construction01/23/2024
DOB NOWPlumbingSigned-offFive Star P and H Co10/16/2023
DOB NOWSprinklersSigned-offSafety Fire Sprinkler10/10/2023
DOB NOWGeneral ConstructionSigned-offMcCormack Contracting09/05/2023
DOB NOWGeneral ConstructionSigned-offQuadrant Development04/18/2023
DOB NOWPlumbingSigned-offMichael Itskovich09/27/2021
DOB NOWSprinklersSigned-offM&D Fire Sprinkler09/27/2021
DOB NOWSprinklersSigned-offM&D Fire Sprinkler05/20/2021
DOB NOWMechanical SystemsSigned-offComalla Construction05/12/2021
DOB NOWPlumbingSigned-offMichael Itskovich05/12/2021
DOB NOWGeneral ConstructionPermit IssuedComalla Construction05/10/2021
BISOTISSUEDEmber Charter School08/12/2022
BISFSISSUEDChampion Combustion05/03/2018
BISOTISSUEDComalla Construction03/30/2018
BISFSISSUEDChampion Combustion02/09/2018
BISOTISSUEDPark Construction01/12/2018
BISOTISSUEDPark Construction12/01/2017
BISOTISSUEDHeritage Chimney Service11/20/2017
+ 15 more permits on file
2 projects · most recent 09/09/2026
Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/09/2026Permit IssuedGibianHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Captiveaire CAS-HVAC1-I. 150-16-7.5T-ERV 101,900 BTU · Doas ×3
CAS-HVAC2-I. 200-18-10T-ERV 143,600 BTU · Doas ×1
Ventilation
Aerapy N/A 530 CFM ×15
11/29/2023——Ventilation Systems—
2 projects · most recent 09/09/2026
FiledStatusContractorScope
09/09/2026Permit IssuedSafety Fire Sprinkler117 heads
02/21/2025Signed-offSafety Fire Sprinkler32 heads
3 projects · most recent 09/09/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/09/2026Permit IssuedFulton Plumbing & HeatingGas, Water/Sanitary
02/24/2025Signed-offGenesis Plumbing and HeatingGas, Water/Sanitary
11/29/2023——Gas
8 projects · most recent 07/06/2026
General Wiring Lighting Boiler Controls
FiledStatusContractorScope
07/06/2026Permit IssuedBridge Electrical ConstructionGeneral Wiring, Lighting
06/08/2026Permit IssuedHome Run Electric—
01/05/2026Permit IssuedG.E.O. ElectricGeneral Wiring
12/18/2024CompleteY.S. ElectricGeneral Wiring, Lighting
09/09/2024CompleteT. McCaffrey-T. McGovernGeneral Wiring
06/16/2021CompleteMetropolis ElectricGeneral Wiring
01/31/2020CompleteMetropolis ElectricBoiler Controls
01/31/2020CompleteMetropolis ElectricGeneral Wiring
1 project · most recent 09/09/2026
Steel Concrete
FiledStatusContractorScope
09/09/2026Permit IssuedGibianSteel, Concrete
▾Field Inspections (DOB CAP) — 28
DateTypeResultReport
08/19/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/15/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/01/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/06/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/30/2024Fail-Final General Construction Non-Directive 14FailView ↗
12/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/21/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/16/2024Pass-Final General Construction Non-Directive 14PassView ↗
06/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 28.
▾Special Inspection Requirements (DOB NOW) — 120
DateRequirementInspectorRole
08/26/2026Interior lighting powerWilliam Aliceaenergy_progress
08/26/2026HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
08/26/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
08/26/2026Mechanical SystemsWilliam Aliceaspecial
08/26/2026Post-installed AnchorsWilliam Aliceaspecial
08/26/2026FinalWilliam Aliceaprogress
08/26/2026HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
08/26/2026Maintenance informationWilliam Aliceaenergy_progress
08/26/2026Exterior lighting powerWilliam Aliceaenergy_progress
08/26/2026HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
08/26/2026Shutoff dampersWilliam Aliceaenergy_progress
08/26/2026Maintenance informationWilliam Aliceaenergy_progress
08/26/2026HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
08/26/2026HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
08/26/2026HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
08/26/2026Post-installed AnchorsWilliam Aliceaspecial
08/26/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
08/26/2026Duct leakage testing, insulation and designWilliam Aliceaenergy_progress
08/26/2026Lighting controlsWilliam Aliceaenergy_progress
06/02/2026FinalIsrael Wertentheilprogress
03/26/2026Lighting controlsEUGENE BIFULCOenergy_progress
03/26/2026Duct leakage testing, insulation and designDavid Marabienergy_progress
03/26/2026Interior lighting powerEUGENE BIFULCOenergy_progress
03/26/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
03/26/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
Latest 25 of 120.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
K9 ResortsPersonal servicesSub-basement, Floors 1, 2
Project B01405020 Alteration · Permit Entire · 06/02/2026
Project B01119163 Alteration · Permit Entire · 03/25/2025
Ten to OneEducationFloors 4, 5, 7
Project B00820844 Alteration CO · Permit Entire · 07/01/2024
Project B00820883 Alteration · LOC Issued · 02/03/2023
Boorum & Pease CompanyRestaurant / Food ServiceFloors 6, 7, Roof
Project B00957071 Alteration · Permit Entire · 11/29/2023
Project B00957248 Alteration · Permit Entire · 11/29/2023
Project B00957269 Alteration · Permit Entire · 11/29/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 469 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch32
09/01/2026B00486149-I1Request digital key ↗
09/01/2026B00485267-I1Request digital key ↗
09/01/2026B00484854-P1Request digital key ↗
Showing 3 of 32 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/26/2026B00929068-P1Request digital key ↗
08/14/2026B00929068-I1Request digital key ↗
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION21
08/04/2022340862604Open ↗
09/17/2018321553467Open ↗
08/31/2018321373633Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION18
08/12/2022340862604Open ↗
05/04/2018321373615Open ↗
03/30/2018321555287Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
08/09/2018321553467Open ↗
01/17/2018321373633Open ↗
01/17/2018321373633Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/22/2018321537459Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/03/2018340562992Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
08/17/2020321537459Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/17/2020321537459Open ↗
▸Seals & Professional Certifications150
▸DOB NOWProgress Inspector Seal & Signature40
10/05/2026B01119163-P1Open ↗
10/05/2026B01119163-P1Open ↗
10/05/2026B01119163-P2Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/01/2026B00486149-I1Open ↗
09/01/2026B00485267-I1Open ↗
09/01/2026B00484854-S1Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
08/16/2019321553467Open ↗
07/31/2019321373624Open ↗
07/31/2019321373624Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
10/05/2026B01119163-P2Open ↗
10/05/2026B01119163-P1Open ↗
10/03/2026B00957071-I1Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
08/04/2022340862604Open ↗
11/20/2017340563811Open ↗
Showing 2 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
08/21/2018321373633Open ↗
Showing 1 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/04/2022340862604Open ↗
11/20/2017340563811Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/04/2022340862604Open ↗
Showing 1 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment45
▸BISEQUIPMENT USE PERMITS21
12/26/2018321373633Open ↗
12/26/2018321373633Open ↗
12/26/2018321373633Open ↗
Showing 3 of 21 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT15
12/26/2018321373633Open ↗
12/26/2018321373633Open ↗
12/26/2018321373633Open ↗
Showing 3 of 15 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
05/28/2019321553467Open ↗
12/21/2018321366339Open ↗
10/19/2018321537459Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026B00485267-I1Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026B00820844-I1Open ↗
08/13/2026B00895270-P2Open ↗
08/13/2026B00895270-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
11/20/2017340563811Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
08/17/2020321537459Open ↗
▸Environmental & Asbestos37
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
09/01/2026B00486149-I1Open ↗
09/01/2026B00485267-I1Open ↗
09/01/2026B00484854-S1Open ↗
Showing 3 of 30 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
07/17/2018321373633Open ↗
05/22/2018321373633Open ↗
05/22/2018321537459Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
07/12/2018321373624Open ↗
07/12/2018321373615Open ↗
06/13/2018321554206Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00486149-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/04/2022340862604Open ↗
11/20/2017340563811Open ↗
11/20/2017340563811Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01119163-S6Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01119163-S6Open ↗
▸Approvals, Objections & Sign-offs34
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
10/10/2024340862604Open ↗
08/26/2020321537459Open ↗
11/27/2019321537459Open ↗
Showing 3 of 29 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
10/09/2024340862604Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT25
08/04/2022340862604Open ↗
08/16/2019321553467Open ↗
07/31/2019321373624Open ↗
Showing 3 of 25 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/26/2024340862604Open ↗
▸Filing & Intake Forms54
▸BISBOROUGH INTAKE FORM28
11/27/2019321537459Open ↗
08/16/2019321553467Open ↗
08/07/2019321537459Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING COVER SHEET11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISADDITIONAL INFORMATION11
02/18/2020321537459Open ↗
01/07/2020321632006Open ↗
09/17/2018321553467Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/04/2022340862604Open ↗
Showing 1 of 4 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/24/2026B00820844-I1Open ↗
08/13/2026B00895270-I1Open ↗
08/13/2026B00895270-P1Open ↗
Showing 3 of 4 on file for this type