← Back
Primarily 2 family with 1 store or office
8009 18 AVENUE
BROOKLYN · Bensonhurst · BIN 3163321
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R5Zoning
2,560 sfGross Floor Area
3Units
1 Open Violation ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: TWO ROYAL REALTY LLC · 1,657 sf lot · 1.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Floor 210p · 1 filing · 20 docs
Floor 123p · 1 filing · 20 docs
Cellar19p · 1 filing · 20 docs
Site & exterior4p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOB SERVICES907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/22/2024$1.6M—BARBIERI REALTY LLC → TWO ROYAL REALTY LLC$613/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LU NING ARCHITECTURE, PLLC1208/20/2026
LUCID BUILDING ENGINEERING P.C.309/11/2025
Z & T ENGINEERING, P.C.102/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LU NING ARCHITECTURE, PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
T & MQ GROUP INCGeneral Contractor307/08/2026
MZM CONSTRUCTION SERVICEGeneral Contractor107/08/2026
TGB CREATIVE DESIGN INCGeneral Contractor107/08/2026
SAFEPIPE PLUMBING INCFire Protection107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
A1 SPECIALIZED, INCScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LU NING ARCHITECTURE, PLL11551208/20/2026
Z & T ENGINEERING, P.C.591308/20/2026
Building Lifecycle
All (114)Filed (16)Permit Issued (9)Signed Off (6)Violation (8)Inspection (9)Objection (36)Special Inspection (30)
08/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fei Zeng
08/24/2026
Special inspection requirement — Interior lighting power
NING LU
08/24/2026
Special inspection requirement — Lighting controls
NING LU
08/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
NING LU
08/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
NING LU
08/20/2026
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION.
B01071512-P8
07/30/2026
Special inspection requirement — Interior lighting power
NING LU
07/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fei Zeng
07/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
NING LU
07/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
NING LU
07/30/2026
Special inspection requirement — Lighting controls
NING LU
06/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/15/2026
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION.
B01071512-P6
03/31/2026
Signed off — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION.
B01071512-S1
03/31/2026
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION.
B01071512-P7
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
NING LU
03/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
NING LU
03/31/2026
Special inspection requirement — Mechanical Systems
NING LU
03/31/2026
Special inspection requirement — Final
NING LU
03/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NING LU
03/30/2026
Signed off — Alteration
PROPOSE ILLUMINATED CHANNEL LETTERS ATTACHED TO BOX ON WALL FOR EXISTING 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01283751-I1
03/19/2026
Signed off — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION.
B01071512-S3
03/19/2026
Signed off — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION.
B01071512-S2
03/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
NING LU
03/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
NING LU
03/19/2026
Special inspection requirement — Mechanical Systems
NING LU
03/19/2026
Special inspection requirement — Final
NING LU
03/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NING LU
12/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/20/2025
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
10/20/2025
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
10/16/2025
Special inspection requirement — Sprinkler Systems
NING LU
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NING LU
10/15/2025
Permit issued — Plumbing
B01071512-S2-PL
10/07/2025
Objection resolved — Addressed
10/02/2025
Objection raised — Scope
09/24/2025
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION.
B01071512-P5
09/24/2025
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION.
B01071512-P4
09/24/2025
Special inspection requirement — Energy Code Compliance Inspections
NING LU
09/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NING LU
09/18/2025
Permit issued — Sign
B01283751-I1-SG
09/11/2025
Filed — Alteration
PROPOSE ILLUMINATED CHANNEL LETTERS ATTACHED TO BOX ON WALL FOR EXISTING 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01283751-I1
09/08/2025
Special inspection requirement — Final
YUNHO LEE
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NING LU
09/03/2025
Special inspection requirement — Energy Code Compliance Inspections
NING LU
06/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/03/2025
Permit issued — Sprinklers
B01071512-S3-EW-SP
05/23/2025
Signed off — Alteration
FILING TO INSTALL NON-ILLUMINATED ALUMINUM AWNING ON WALL FOR FIRST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01160882-I1
05/16/2025
Permit issued — Mechanical Systems
B01071512-S1-MS
05/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/29/2025
Filed — Alteration
FILING TO INSTALL NON-ILLUMINATED ALUMINUM AWNING ON WALL FOR FIRST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01160882-P1
04/17/2025
Signed off — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH INTERIOR ALTERATION.
B01071512-S4
04/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/03/2025
Permit issued — Structural
B01071512-S4-ST
04/03/2025
Permit issued — Structural
B01071512-S4-ST
03/21/2025
Objection raised — Fire_Protection
03/21/2025
Objection resolved — Addressed
03/21/2025
Objection raised — Fire_Protection
03/21/2025
Objection resolved — Addressed
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC10/15/2025
DOB NOWSignSigned-offMAD SIGNS INC09/18/2025
DOB NOWSprinklersSigned-offBELLEROSE PLBG & HEATING06/03/2025
DOB NOWMechanical SystemsSigned-offT & MQ GROUP INC05/16/2025
DOB NOWStructuralSigned-offMZM CONSTRUCTION SERVICE04/03/2025
DOB NOWStructuralSigned-offT & MQ GROUP INC04/03/2025
DOB NOWGeneral ConstructionSigned-offTGB CREATIVE DESIGN INC03/19/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/17/2024
DOB NOWGeneral ConstructionPermit IssuedT & MQ GROUP INC10/17/2024
1 project · most recent 08/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2026Signed-offT & MQ GROUP INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ 36,000 BTU · Heat Pump Outdoor ×2
MXZ-2C20NAHZ 20,000 BTU · Heat Pump Outdoor ×1
MXZ-SM48NAMHZ 48,000 BTU · Heat Pump Outdoor ×1
MXZ-SM36NAMHZ2 36,000 BTU · Heat Pump Outdoor ×4
MXZ-2C20NAHZ4 18,000 BTU · Heat Pump Outdoor ×2
MXZ-SM48NAMHZ2 48,000 BTU · Heat Pump Outdoor ×2
Ventilation
Mitsubishi Electric TLGHF0300RVX02A 300 CFM · Vrf Indoor ×2
1 project · most recent 08/20/2026
FiledStatusContractorScope
08/20/2026Signed-offSAFEPIPE PLUMBING INC62 heads
1 project · most recent 08/20/2026
Medical Gas Water/Sanitary
FiledStatusContractorScope
08/20/2026Signed-offDW PLUMBING INCMedical Gas, Water/Sanitary
2 projects · most recent 09/22/2025
General Wiring
FiledStatusContractorScope
09/22/2025CompleteVOLTRON ELECTRIC LLC—
11/15/2024CompleteJ Y ELECTRIC INCGeneral Wiring
1 project · most recent 08/20/2026
Steel Concrete
FiledStatusContractorScope
08/20/2026Signed-offDW PLUMBING INCSteel, Concrete
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/20/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
10/20/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
06/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
08/24/2026Structural Stability – Alterations of existing buildingsFei Zengspecial
08/24/2026Interior lighting powerNING LUenergy_progress
08/24/2026Lighting controlsNING LUenergy_progress
08/24/2026Fire-Resistance Rated ConstructionNING LUprogress
08/24/2026Tenant Protection Plan ComplianceNING LUspecial
07/30/2026Interior lighting powerNING LUenergy_progress
07/30/2026Structural Stability – Alterations of existing buildingsFei Zengspecial
07/30/2026Tenant Protection Plan ComplianceNING LUspecial
07/30/2026Fire-Resistance Rated ConstructionNING LUprogress
07/30/2026Lighting controlsNING LUenergy_progress
03/31/2026HVAC-R and service water heating system controlsNING LUenergy_progress
03/31/2026HVAC-R and service water heating equipmentNING LUenergy_progress
03/31/2026Mechanical SystemsNING LUspecial
03/31/2026FinalNING LUprogress
03/31/2026HVAC-R and service water piping design and insulationNING LUenergy_progress
03/19/2026HVAC-R and service water heating equipmentNING LUenergy_progress
03/19/2026HVAC-R and service water heating system controlsNING LUenergy_progress
03/19/2026Mechanical SystemsNING LUspecial
03/19/2026FinalNING LUprogress
03/19/2026HVAC-R and service water piping design and insulationNING LUenergy_progress
10/16/2025Sprinkler SystemsNING LUspecial
10/16/2025Fire-Resistant Penetrations and JointsNING LUspecial
09/24/2025Energy Code Compliance InspectionsNING LUprogress
09/24/2025Fire-Resistant Penetrations and JointsNING LUspecial
09/08/2025FinalYUNHO LEEprogress
Latest 25 of 39.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/22/2026B01160882-I1Request digital key ↗
08/22/2026B01160882-P1Request digital key ↗
08/22/2026B01071512-P7Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications54
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026B01071512-P1Open ↗
09/01/2026B01071512-S2Open ↗
08/31/2026B01071512-P7Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/22/2026B01071512-P7Open ↗
08/22/2026B01071512-P6Open ↗
08/22/2026B01071512-P5Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026B01071512-P1Open ↗
09/01/2026B01071512-S2Open ↗
08/31/2026B01071512-P7Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/22/2026B01071512-P8Open ↗
08/13/2026B01071512-P6Open ↗
08/13/2026B01071512-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/22/2026B01071512-I1Open ↗
08/22/2026B01071512-P7Open ↗
08/22/2026B01071512-P6Open ↗
Showing 3 of 13 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/22/2026B01071512-P6Open ↗
08/22/2026B01071512-P3Open ↗
08/22/2026B01071512-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/22/2026B01071512-I1Open ↗