← Back
BuildNYC
Elevator apt, fireproof without stores
Janel Towers
801 NEILL AVENUE · BIN 2048807
💬 Discuss this project
1952Year Built
24Stories
D3Building Class
R6Zoning
252,400 sfGross Floor Area
230Units
LL97 CoveredRent Stabilized24 Active Violations 22 unresolved · 2 paperwork only 3 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: Janel Towers · 107,835 sf lot · 2.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofStellar Management4p · 2 filings · 10 docs
Floor 1Stellar Management2p · 2 filings · 15 docs
Site & exteriorStellar ManagementUnder Construction6p · 2 filings · 7 docs
Filed — no permit issuedSuspended Scaffold outrigger installation for Facade repair1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Janel Towers503/22/2026
Hilja Housing203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/20/2025$16.1M—JANEL TOWERS LLC → JANEL FLATS, LLC$64/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Atelier NY Architecture212/03/2024
Tariq M. Bashir109/25/2024
Ashraf109/04/2024
Azimuth Engineering212/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen403/21/2026
Green Studio203/21/2026
Smep Design & Consultation603/21/2026
Riggining Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
The Harvey GroupGeneral Contractor407/08/2026
Platinum Services NYScaffold308/30/2026
Structural Preserv SystemGeneral Contractor203/21/2026
Illuminous ElectricElectrical103/21/2026
Ramapo CommunicationGeneral Contractor107/08/2026
Cortez Nieves JeanScaffold103/21/2026
R & L SystemsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983410/22/2025
Atelier NY Architecture2438212/03/2024
AA Building & Inspection1519109/25/2024
Jeremy K McKeon, P.E.7263212/16/2020
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/13/2026
Filed — Alteration
Suspended Scaffold outrigger installation for Facade repair works and inspections
X01489331-I1
10/23/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/15/2026
Observed at exposure #2 above apt 24C, multiple missing and loose mortar joints throughout the facade, leaving sections of masonry deteriorated and…
ECB violation · open
08/27/2026
Permit renewed — Sidewalk Shed
Renewed without changes
X01104828-I1-SH
237 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY08/27/2026
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY09/02/2025
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System07/02/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System07/02/2025
DOB NOWGeneral ConstructionPermit IssuedStructural Preserv System06/09/2025
DOB NOWGeneral ConstructionSigned-offThe Harvey Group12/09/2024
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System10/31/2024
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY09/05/2024
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System08/16/2024
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System08/16/2024
DOB NOWGeneral ConstructionSigned-offThe Harvey Group04/15/2024
DOB NOWAntennaPermit IssuedRamapo Communication06/23/2020
BISPLISSUEDZone Plumbing & Heating09/24/2018
BISOTISSUEDAccurate and Reliable Hom09/06/2018
BISPLISSUEDChamp Plumbing & Heating11/02/2017
BISEQISSUEDRockledge Scaffold11/01/2017
BISOTISSUEDM.E.H. Contractors04/11/2017
BISOTISSUEDMja Services02/09/2017
BISOTISSUEDMja Services01/06/2017
BISOTISSUEDM.E.H. Contractors01/05/2017
BISEQISSUEDRockledge Scaffold11/14/2016
BISOTISSUEDAccurate and Reliable Hom10/24/2016
BISOTISSUEDMja Services09/22/2016
BISFSISSUEDChampion Combustion09/14/2016
BISPLISSUEDChamp Plumbing & Heating09/14/2016
BISOTISSUEDMja Services06/14/2016
BISEQISSUEDRockledge Scaffold12/07/2015
BISOTISSUEDAki Renovations Group11/20/2015
BISPLISSUEDOrion Plumbing & Heating10/16/2015
BISOTISSUEDMja Services10/06/2015
BISOTISSUEDMja Services10/06/2015
BISOTISSUEDMja Services08/14/2015
BISOTISSUEDChampion Combustion10/29/2013
BISPLISSUEDChamp Plumbing & Heating10/11/2013
BISEQISSUEDAmerican Ventilation Service07/11/2013
BISOTISSUEDChampion Combustion10/04/2012
BISPLISSUEDChamp Plumbing & Heating10/04/2012
BISOTISSUEDVictoria Consulting & Development02/25/2010
BISEQISSUEDPheonix 132 Sutton Street12/21/2009
BISEQISSUEDPheonix 132 Sutton Street12/01/2009
+ 8 more permits on file
2 projects · most recent 07/07/2026
FiledStatusContractorScope
07/07/2026Permit IssuedRichard Neu—
08/20/2024CompleteIlluminous Electric—
1 project · most recent 09/25/2024
Concrete Masonry
FiledStatusContractorScope
09/25/2024Permit IssuedStructural Preserv SystemConcrete, Masonry
2 projects · most recent 11/13/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
11/13/2026——Suspended Scaffold (SC)
10/22/2025Permit IssuedStructural Preservation SystemSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
11/06/2025Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
11/06/2025Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
10/22/2025Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
10/22/2025Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
02/28/2025Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
02/28/2025Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
12/02/2024FinalAnatole Plotkinprogress
12/02/2024Fire-Resistant Penetrations and JointsAnatole Plotkinspecial
12/02/2024Tenant Protection Plan ComplianceAnatole Plotkinspecial
10/22/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
10/22/2024Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
09/23/2024Post-installed AnchorsYounes Abouyaalaspecial
09/23/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
09/23/2024Tenant Protection Plan ComplianceYounes Abouyaalaspecial
08/23/2024FinalNAVEEN KUMARprogress
08/23/2024MasonryYounes Abouyaalaspecial
04/01/2024Fire-Resistance Rated ConstructionAnatole Plotkinprogress
04/01/2024Energy Code Compliance InspectionsAnatole Plotkinprogress
04/01/2024Fire-Resistant Penetrations and JointsAnatole Plotkinspecial
04/01/2024Lighting controlsAnatole Plotkinenergy_progress
03/26/2024FinalAnatole Plotkinprogress
03/26/2024Tenant Protection Plan ComplianceAnatole Plotkinspecial
339 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account