← Back
Elevator apt, semi-fireproof without stores
802 WEST 190 STREET
MANHATTAN · Washington Heights (North) · BIN 1064450
💬 Discuss this project
1942Year Built
6Stories
D1Building Class
R7-2Zoning
79,039 sfGross Floor Area
85Units
LL97 CoveredRent Stabilized9 Open Violations 4 unresolved · 5 paperwork only ▸FISP: SWARMP
Elevator apt, semi-fireproof without stores · 18,175 sf lot · 4.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 11 docs
Floor 63p · 1 filing · 3 docs
Floor 53p · 1 filing · 3 docs
Floor 43p · 1 filing · 3 docs
Floor 33p · 1 filing · 3 docs
Floor 23p · 1 filing · 3 docs
Floor 15p · 2 filings · 5 docs
CellarUnder Construction6p · 2 filings · 10 docs
Site & exterior49p · 5 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROTNER MANAGEMENT1907/08/2026
TOPLINE NYC CONTRACTING707/08/2026
KAJ NY CONSTRUCTION507/08/2026
163 WEST 17 STREET503/21/2026
Real Estate Management103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
THE GREEN STUDIO203/21/2026
JME BUILDING CONSULTING, LLC103/21/2026
GREEN STUDIO403/21/2026
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
EUROCELT EXPEDITING, INC403/21/2026
MILLENNIUM DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LCS RESTORATION CORPGeneral Contractor1507/08/2026
VLAD RESTORATION LTDGeneral Contractor707/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor507/08/2026
ADVANCED PLUMBING MECHPlumbing207/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor207/08/2026
ACE CHIMNEY & FIREPLACEGeneral Contractor107/08/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
RICHARD NEUElectrical103/22/2026
GREGORY PAPANTONIOUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808206/13/2023
GEIGER ENGINEERING. PC689107/22/2021
Building Lifecycle
All (94)Filed (12)Permit Issued (20)Signed Off (3)Facade (FISP) (12)Violation (43)Special Inspection (4)
02/19/2026
Permit issued — Plumbing
M00760083-I1-PL
06/04/2025
Violation issued (HPD, closed)
A
03/03/2025
Signed off — Alteration
Facade repairs filed as per plans filed herewith. no change in use, egress or occupancy.
M00558118-I1
06/17/2024
Permit issued — Sidewalk Shed
M00669687-I1-SH
06/11/2024
Permit issued — General Construction
M00558118-I1-GC
04/12/2024
Filed — Alteration
INSTALLATION OF 300psf SIDEWALK SHED AS PER PLANS, SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
M00669687-P3
01/12/2024
Cycle 9 facade report signed — SWARMP
12/19/2023
Violation issued (ECB, closed)
Construction
12/19/2023
Violation issued (ECB, closed)
Construction
11/30/2023
Cycle 9 facade inspection completed
09/13/2023
Violation issued (ECB, closed)
Construction
09/06/2023
Violation issued (ECB, closed)
Construction
08/01/2023
Violation issued (ECB, closed)
Construction
07/17/2023
Violation issued (ECB, open)
Construction
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/15/2023
Signed off — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883453-I1
06/13/2023
Filed — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883453-P1
06/13/2023
Special inspection requirement — Chimneys and vents
Joseph Bazini
06/13/2023
Special inspection requirement — Mechanical Systems
Joseph Bazini
06/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
06/13/2023
Special inspection requirement — Final
Joseph Bazini
06/08/2023
Permit issued — General Construction
M00558118-I1-GC
06/08/2023
Permit issued — Sidewalk Shed
M00669687-I1-SH
06/06/2023
Permit issued — Mechanical Systems
M00883453-I1-MS
06/02/2023
Filed — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883453-I1
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2023
Cycle 9 facade report submitted
12/13/2022
Violation issued (ECB, open)
Construction
12/13/2022
Violation issued (ECB, open)
Construction
10/07/2022
Permit issued — Plumbing
M00760083-I1-PL
08/25/2022
Filed — Alteration
M00760083-I1
06/09/2022
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00753706-I1
06/09/2022
Permit issued — Supported Scaffold
M00753706-I1-SH
06/09/2022
Permit issued — Supported Scaffold
M00753706-I1-SF
06/06/2022
Permit issued — General Construction
M00558118-I1-GC
04/21/2022
Permit issued — Sidewalk Shed
M00669687-I1-SH
02/02/2022
Filed — Alteration
INSTALLATION OF 300psf SIDEWALK SHED AS PER PLANS, SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
M00669687-P1
02/01/2022
Filed — Alteration
INSTALLATION OF 300psf SIDEWALK SHED AS PER PLANS, SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
M00669687-I1
02/01/2022
Permit issued — Sidewalk Shed
M00669687-I1-SH
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/2021
Filed — Alteration
Facade repairs filed as per plans filed herewith. no change in use, egress or occupancy.
M00558118-I1
04/27/2021
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDINSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00270452-I1
12/26/2019
Permit issued — Sidewalk Shed
M00210297-I1-SH
11/26/2019
Permit issued — Supported Scaffold
M00270452-I1-SF
11/25/2019
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDINSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00270452-I1
10/25/2019
Permit issued — Sidewalk Shed
M00117537-I1-SH
08/17/2019
Permit issued — Sidewalk Shed
M00210297-I1-SH
08/15/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00210297-I1
06/26/2019
Permit issued — Sidewalk Shed
M00117537-I1-SH
06/25/2019
Permit issued — Supported Scaffold
M00128417-I1-SF
02/12/2019
Permit issued — Supported Scaffold
M00128417-I1-SF
02/11/2019
Filed — Alteration
M00128417-I1
02/04/2019
Permit issued — Sidewalk Shed
M00117537-I1-SH
01/31/2019
Filed — Alteration
M00117537-I1
01/18/2019
Violation issued (HPD, closed)
B
01/18/2019
Violation issued (HPD, closed)
B
01/13/2017
Cycle 8 facade report submitted
01/12/2017
Cycle 8 facade inspection completed
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/30/2016
Cycle 8 facade report signed — SWARMP
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH02/19/2026
DOB NOWSidewalk ShedPermit IssuedLCS RESTORATION CORP06/17/2024
DOB NOWGeneral ConstructionSigned-offLCS RESTORATION CORP06/11/2024
DOB NOWGeneral ConstructionSigned-offLCS RESTORATION CORP06/08/2023
DOB NOWSidewalk ShedPermit IssuedLCS RESTORATION CORP06/08/2023
DOB NOWMechanical SystemsSigned-offACE CHIMNEY FIREPLACE06/06/2023
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH10/07/2022
DOB NOWSupported ScaffoldPermit IssuedKAJ NY CONSTRUCTION INC06/09/2022
DOB NOWSupported ScaffoldPermit IssuedKAJ NY CONSTRUCTION INC06/09/2022
DOB NOWGeneral ConstructionSigned-offLCS RESTORATION CORP06/06/2022
DOB NOWSidewalk ShedPermit IssuedLCS RESTORATION CORP04/21/2022
DOB NOWSidewalk ShedPermit IssuedLCS RESTORATION CORP02/01/2022
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING12/26/2019
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING11/26/2019
DOB NOWSidewalk ShedPermit IssuedVLAD RESTORATION LTD10/25/2019
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC CONTRACTING08/17/2019
DOB NOWSidewalk ShedPermit IssuedVLAD RESTORATION LTD06/26/2019
DOB NOWSupported ScaffoldPermit IssuedVLAD RESTORATION LTD06/25/2019
DOB NOWSupported ScaffoldPermit IssuedVLAD RESTORATION LTD02/12/2019
DOB NOWSidewalk ShedPermit IssuedVLAD RESTORATION LTD02/04/2019
BISOTISSUEDVLAD RESTORATION LTD11/30/2016
BISEQISSUEDVLAD RESTORATION LTD12/28/2015
BISEQISSUEDVLAD RESTORATION LTD06/23/2014
BISOTISSUEDVLAD RESTORATION LTD06/21/2010
BISEQISSUEDVLAD RESTORATION LTD01/28/2010
BISOTISSUEDVLAD RESTORATION LTD01/28/2010
BISEQISSUEDVLAD RESTORATION LTD07/17/2007
BISOTISSUEDVEBICON CONSTRUCTION CORP01/13/2005
BISEQISSUEDVLAD RESTORATION LTD08/04/2004
BISOTISSUEDVLAD RESTORATION LTD08/04/2004
BISEQISSUEDVLAD RESTORATION LTD05/12/2000
3 projects · most recent 08/16/2019
FiledStatusContractorScope
08/16/2019Permit IssuedRICHARD NEU—
01/09/2019CompleteBOROWIDE ELECT'L CONTR'S—
04/20/2018CompleteSTAR ELEC'L CONTRACTORS C—
3 projects · most recent 04/12/2024
Sidewalk Shed Scaffold
FiledStatusContractorScope
04/12/2024Permit IssuedLCS RESTORATION CORPSidewalk Shed
06/09/2022Permit IssuedKAJ NY CONSTRUCTION INCScaffold, Sidewalk Shed
08/15/2019Permit IssuedTOPLINE NYC CONTRACTINGSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/13/2023Chimneys and ventsJoseph Bazinispecial
06/13/2023Mechanical SystemsJoseph Bazinispecial
06/13/2023Tenant Protection Plan Compliance—special
06/13/2023FinalJoseph Baziniprogress
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch8
09/03/2026M00558118-I1Request digital key ↗
09/02/2026M00753706-I1Request digital key ↗
09/02/2026M00760083-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00128417-I1Request digital key ↗
09/05/2026M00270452-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00117537-I1Request digital key ↗
09/05/2026M00210297-I1Request digital key ↗
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION7
12/06/2016122466492Open ↗
01/12/2016122027396Open ↗
07/02/2014122027396Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
02/01/2016122027396Open ↗
01/28/2016122027396Open ↗
08/10/2015122466492Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/05/2026M00117537-I1Open ↗
09/02/2026M00760083-I1Open ↗
08/13/2026M00669687-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
01/23/2017122466492Open ↗
10/25/2016122466492Open ↗
08/10/2015122466492Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/10/2015122466492Open ↗
07/02/2014122027396Open ↗
06/03/2009120054617Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/10/2015122466492Open ↗
07/02/2014122027396Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/03/2009120054617Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026M00883453-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026M00883453-P1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/03/2009120054617Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026M00210297-I1Open ↗
08/13/2026M00270452-I1Open ↗
▸Environmental & Asbestos7
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
12/01/2009120213839Open ↗
06/03/2009120054617Open ↗
06/03/2009120054617Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M00558118-I1Open ↗
08/13/2026M00883453-I1Open ↗
08/13/2026M00883453-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/10/2015122466492Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS2
01/23/2017122466492Open ↗
10/25/2016122466492Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/10/2015122466492Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/23/2017122466492Open ↗
10/25/2016122466492Open ↗
05/31/2011120213839Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
12/01/2009120213839Open ↗
06/03/2009120054617Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/05/2011120054617Open ↗
06/06/2009120054617Open ↗
▸BISSHED LETTER1
01/12/2016122027396Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
10/25/2016122466492Open ↗
08/10/2015122466492Open ↗
05/31/2011120213839Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
08/10/2015122466492Open ↗
07/02/2014122027396Open ↗
12/01/2009120213839Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
02/01/2016122027396Open ↗
01/28/2016122027396Open ↗
02/09/2010120213839Open ↗