81-60 UTOPIA PARKWAY · BIN 4833509
💬 Discuss this project
1950Year Built
5Stories
W6Building Class
R4Zoning
4,687,440 sfGross Floor Area
6Units
LL97 Covered0 Active Violations 49 likely answered 3 old, status unconfirmed ▸FDNY Report ↗
Other college and university · 4,106,280 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRooftop equipment and antenna removal2p · 1 filing · 4 docs
CellarSt. John's UniversityUnder Construction27p · 1 filing · 17 docs
Sub-BasementSt. John's UniversityUnder Construction7p · 2 filings · 17 docs
Site & exteriorRooftop equipment and antenna removal1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St John's University51708/16/2026
St Johns Associates903/21/2026
Dormitory Authority103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Burns Engineering301/17/2024
Grant206/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 2147603/21/2026
Construction Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Moskowitz StuartElectrical203/21/2026
Coppola & Son Electric, IElectrical203/21/2026
Matros Automated ElectricalElectrical203/21/2026
Arco Plumbing and HeatingPlumbing208/16/2026
Jam ElectricalElectrical203/21/2026
Par Plumbing Co., Inc.oFire Protection103/21/2026
Concept Air Conditioningspecialty_contractor104/09/2026
Watch Hill Wireless SoluGeneral Contractor107/08/2026
Polo Electric Corp D/B/AElectrical103/21/2026
Electric EssentialsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Philibert Engineering223201/17/2024
Grant Engineering Consulting3512206/09/2023
Building Lifecycle
All (124)Filed (5)Permit Issued (4)Signed Off (1)Violation (60)Inspection (2)Objection (30)Special Inspection (22)
10/02/2026
Inspection — Under Review Boiler Equipment Inspection
Under Review
View inspection ↗
08/18/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/14/2026
Permit issued — Plumbing
Q00940333-S1-PL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/27/2025
Violation issued (FDNY_ORDER, closed)
08/27/2025
Violation issued (FDNY_ORDER, closed)
08/27/2025
Violation issued (FDNY_ORDER, closed)
08/27/2025
Violation issued (FDNY_ORDER, closed)
07/31/2025
Permit issued — Plumbing
Q00940333-S1-PL
05/29/2025
Permit issued — Mechanical Systems
Q00940333-I1-MS
04/28/2025
Violation issued (FDNY_ORDER, closed)
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacky Philibert
01/25/2024
Special inspection requirement — Post-installed Anchors
Jacky Philibert
01/25/2024
Special inspection requirement — Mechanical Systems
Jacky Philibert
01/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Jacky Philibert
01/25/2024
Special inspection requirement — Final
Jacky Philibert
01/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jacky Philibert
01/25/2024
Special inspection requirement — Electrical motors and elevators
Jacky Philibert
01/25/2024
Special inspection requirement — Maintenance information
Jacky Philibert
01/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jacky Philibert
01/25/2024
Special inspection requirement — Shutoff dampers
Jacky Philibert
01/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jacky Philibert
01/24/2024
Objection resolved — Addressed
01/22/2024
Objection raised — Admin
01/17/2024
Filed — Alteration
HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00940333-P1
12/14/2023
Special inspection requirement — Mechanical Systems
Jacky Philibert
12/14/2023
Special inspection requirement — Post-installed Anchors
Jacky Philibert
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacky Philibert
12/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Jacky Philibert
12/14/2023
Special inspection requirement — Final
Jacky Philibert
12/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
Jacky Philibert
12/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
Jacky Philibert
12/14/2023
Special inspection requirement — Maintenance information
Jacky Philibert
12/14/2023
Special inspection requirement — Shutoff dampers
Jacky Philibert
12/14/2023
Special inspection requirement — Electrical motors and elevators
Jacky Philibert
12/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jacky Philibert
11/15/2023
Objection resolved — Addressed
11/15/2023
Objection resolved — Addressed
11/02/2023
Objection raised — Other
11/02/2023
Objection resolved — Addressed
10/26/2023
Objection resolved — Addressed
10/26/2023
Objection resolved — Addressed
10/26/2023
Objection resolved — Addressed
10/26/2023
Objection resolved — Addressed
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedArco Plumbing and Heating08/14/2026
DOB NOWPlumbingPermit IssuedArco Plumbing and Heating07/31/2025
DOB NOWMechanical SystemsPermit IssuedConcept Air Conditioning05/29/2025
DOB NOWAntennaSigned-offWatch Hill Wireless Solu09/22/2022
BISOTISSUEDMed-Tek Contracting03/31/2022
BISOTISSUEDMed-Tek Contracting09/20/2021
BISFSISSUEDDouglas Simmons12/10/2018
BIS—ISSUEDWJ Regan & Company07/20/2017
BIS—ISSUEDW.J. Regan & Company07/18/2017
BIS—ISSUEDW.J. Regan & Company07/18/2017
BIS—ISSUEDW.J. Regan & Company08/09/2016
BIS—ISSUEDW.J. Regan & Company08/04/2016
BIS—ISSUEDW.J. Regan & Company08/04/2016
BISOTISSUEDW.J. Regan & Company07/13/2016
BISMHISSUEDW.J. Regan & Company07/13/2016
BISMHISSUEDKing Freeze Mechanical Co09/24/2015
BISOTISSUEDBechtel Infrastructure An08/05/2014
BISPLISSUEDNew Plumbing & Heating05/19/2014
BISOTISSUEDSite Structural Services04/16/2014
BISMHISSUEDWindsor Construction Enterprises03/07/2014
BISOTISSUEDWindsor Construction Enterprises03/07/2014
BISFPISSUEDFiremasters10/15/2013
BISOTISSUEDConstructomics10/09/2013
BISMHISSUEDConstructomics10/09/2013
BISSPISSUEDSirina Fire Protection09/12/2013
BISPLISSUEDTristate Plumbing Services08/14/2013
BISMHISSUEDDNP Builders08/09/2013
BISOTISSUEDDNP Builders08/09/2013
BISPLISSUEDPar Plumbing Co08/02/2013
BISMHISSUEDConstructomics08/01/2013
BISOTISSUEDConstructomics08/01/2013
BISPLISSUEDI.M.P. Plumbing & Heating05/07/2013
BISOTISSUEDOdyssia Global Commercial01/08/2013
BISOTISSUEDCommunication Component S12/07/2012
BISOTISSUEDCommunication Component S10/17/2012
BISPLISSUEDTristate Plumbing Services08/22/2012
BISMHISSUEDConstructomics02/16/2012
BISOTISSUEDConstructomics02/16/2012
BISMHISSUEDWindsor Construction Enterprises10/21/2011
BISOTISSUEDWindsor Construction Enterprises10/21/2011
+ 14 more permits on file
1 project · most recent 01/17/2024
Others Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/17/2024Permit IssuedConcept Air ConditioningOthers, Refrigeration Systems, Ventilation Systems
Ventilation
Greenheck BSQ-180 3,250 CFM · Exhaust Fan ×2
Refrigeration
Carrier 19DV-F43F483345H5 400 tons · Chiller ×4
Other
Bell & Gossett e-HSC-5x8x12 Pump ×4
e-HSC-5x8x14 Pump ×4
Federal Pump CCV-1520-4CI-2 ×2
CCV-620-4CI-2 ×2
1 project · most recent 01/17/2024
Water/Sanitary
FiledStatusContractorScope
01/17/2024Permit IssuedArco Plumbing and HeatingWater/Sanitary
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/02/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
08/18/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
01/25/2024Fire-Resistant Penetrations and JointsJacky Philibertspecial
01/25/2024Post-installed AnchorsJacky Philibertspecial
01/25/2024Mechanical SystemsJacky Philibertspecial
01/25/2024Energy Code Compliance InspectionsJacky Philibertprogress
01/25/2024FinalJacky Philibertprogress
01/25/2024HVAC-R and service water piping design and insulationJacky Philibertenergy_progress
01/25/2024Electrical motors and elevatorsJacky Philibertenergy_progress
01/25/2024Maintenance informationJacky Philibertenergy_progress
01/25/2024HVAC-R and service water heating equipmentJacky Philibertenergy_progress
01/25/2024Shutoff dampersJacky Philibertenergy_progress
01/25/2024HVAC-R and service water heating system controlsJacky Philibertenergy_progress
12/14/2023Mechanical SystemsJacky Philibertspecial
12/14/2023Post-installed AnchorsJacky Philibertspecial
12/14/2023Fire-Resistant Penetrations and JointsJacky Philibertspecial
12/14/2023Energy Code Compliance InspectionsJacky Philibertprogress
12/14/2023FinalJacky Philibertprogress
12/14/2023HVAC-R and service water heating system controlsJacky Philibertenergy_progress
12/14/2023HVAC-R and service water heating equipmentJacky Philibertenergy_progress
12/14/2023Maintenance informationJacky Philibertenergy_progress
12/14/2023Shutoff dampersJacky Philibertenergy_progress
12/14/2023Electrical motors and elevatorsJacky Philibertenergy_progress
12/14/2023HVAC-R and service water piping design and insulationJacky Philibertenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
St. John's UniversityEducationCellar, Sub-basement
Project Q00940333 Alteration · Permit Entire · 10/06/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,067 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026Q07997410-P1Request digital key ↗
08/23/2026Q00940333-I1Request digital key ↗
08/23/2026Q00940333-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits249
▸BISPLAN / WORK APPROVAL APPLICATION140
04/28/2023410050625Open ↗
03/10/2021420855239Open ↗
04/21/2020410050625Open ↗
Showing 3 of 140 on file for this type
▸BISWORK PERMIT APPLICATION97
10/01/2021420867574Open ↗
12/20/2018421559398Open ↗
12/20/2018421559398Open ↗
Showing 3 of 97 on file for this type
▸BISPLACE OF ASSEMBLY11
10/02/2017421549088Open ↗
08/15/2017421480310Open ↗
05/10/2017421480310Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
05/10/2017421480310Open ↗
07/28/2016421352182Open ↗
▸Seals & Professional Certifications219
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION142
01/19/2019421559398Open ↗
01/19/2019421559398Open ↗
12/20/2018421559398Open ↗
Showing 3 of 142 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM34
03/27/2014420871596Open ↗
Showing 1 of 34 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
12/01/2018421559398Open ↗
07/11/2016421342041Open ↗
03/27/2014420871596Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00940333-I1Open ↗
09/01/2026Q00940333-I1Open ↗
09/01/2026Q00940333-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026Q07997410-I1Open ↗
08/24/2026Q07997410-P1Open ↗
08/23/2026Q00940333-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPC FULL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00940333-I1Open ↗
09/01/2026Q00940333-I1Open ↗
09/01/2026Q00940333-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/01/2018421559398Open ↗
07/12/2016421342041Open ↗
▸Trade Schedules & Equipment101
▸BISSELF-CERT PLUMBING NOTICE34
03/28/2014410143465Open ↗
Showing 1 of 34 on file for this type
▸BISSCHEDULE B - PLUMBING31
08/01/2014420871596Open ↗
Showing 1 of 31 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
12/03/2014420487654Open ↗
Showing 1 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
12/01/2018421559398Open ↗
Showing 1 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
02/03/2015420966404Open ↗
05/29/2014420966404Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection14
▸BISSTREET TREE CHECKLIST12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos71
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
07/12/2016421342041Open ↗
07/12/2016421342041Open ↗
04/14/2014420966404Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026Q07997410-P1Open ↗
08/15/2026Q07997410-I1Open ↗
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
01/19/2019421559398Open ↗
01/19/2019421559398Open ↗
12/01/2018421559398Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
02/23/2021420867574Open ↗
01/19/2019421559398Open ↗
07/18/2017421342041Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections8
03/04/2015420966404Open ↗
10/20/2014420595966Open ↗
05/13/2014420916897Open ↗
Showing 3 of 8 on file for this type
▸BISEMERGENCY LIGHTING - PA1
12/22/2025421549088Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/14/2025420214039Open ↗
03/14/2025420214039Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs163
▸BISADMINISTRATIVE OBJECTIONS68
12/01/2018421559398Open ↗
05/10/2017421480310Open ↗
07/13/2016421346350Open ↗
Showing 3 of 68 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST51
04/20/2022420867574Open ↗
03/28/2019421559398Open ↗
07/19/2017421342041Open ↗
Showing 3 of 51 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION37
10/01/2021420867574Open ↗
05/25/2017402041278Open ↗
05/25/2017402364767Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/23/2026Q00940333-I1Open ↗
08/13/2026Q00940333-S1Open ↗
08/13/2026Q00940333-P1Open ↗
▸BISSUPERSEDING LETTER2
08/12/2016410050625Open ↗
08/12/2016402041278Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership100
▸BISCOST AFFIDAVIT98
02/23/2021420867574Open ↗
03/20/2019421559398Open ↗
12/01/2018421559398Open ↗
Showing 3 of 98 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
07/13/2016421346350Open ↗
07/11/2016421342041Open ↗
▸Filing & Intake Forms86
▸BISEFILING COVER SHEET73
12/01/2018421559398Open ↗
07/28/2016421352182Open ↗
07/12/2016421346350Open ↗
Showing 3 of 73 on file for this type
▸BISADDITIONAL INFORMATION9
03/24/2015420595966Open ↗
11/24/2014420595966Open ↗
08/08/2014420916897Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM4
10/01/2021420867574Open ↗
04/21/2020410050625Open ↗
04/21/2020410050625Open ↗
Showing 3 of 4 on file for this type
▸Other Documents7
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type