← Back
Over six families without stores
812 8 AVENUE
BROOKLYN · BIN 3025887
💬 Discuss this project
1903Year Built
4Stories
C1Building Class
R7BZoning
10,532 sfGross Floor Area
8Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: TOWNHOUSE RENTAL, L.L.C. · 3,766 sf lot · 2.8 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof1p · 1 filing · 20 docs
Floor 44p · 2 filings · 20 docs
Floor 33p · 2 filings · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENBROOK PARTNERS1707/08/2026
ACE GROUP NY507/08/2026
TOWNHOUSE RENTAL, LLC203/22/2026
812 8 AVE LLC103/22/2026
SLOPE REALTY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/25/2023$12.7M—812 8 AVE, LLC → TOWNHOUSE RENTAL, L.L.C.$1,209/sf building
11/23/2020$5.5M—812 8TH AVENUE ASSOCIATES LLC → 812 8 AVE LLC$522/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VOLUME SPACE CONSULTING INC.109/09/2024
CPENGINEERING PC1012/14/2022
M. HAMDI GUNAL, PE, P. C.212/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSR EXPEDITERS203/21/2026
METROPOLIS GROUP INC1603/21/2026
CASA GROUP403/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEPTUNE MECHANICAL INCPlumbing807/08/2026
NEPTUNE MECHANICAL INCGeneral Contractor403/21/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.2541212/14/2022
Building Lifecycle
All (89)Filed (13)Permit Issued (5)Signed Off (3)Violation (32)Inspection (6)Special Inspection (30)
05/13/2026
Violation issued (HPD, closed)
C
10/22/2025
Violation issued (HPD, closed)
B
10/22/2025
Violation issued (HPD, closed)
A
10/22/2025
Violation issued (HPD, closed)
C
10/22/2025
Violation issued (HPD, closed)
B
10/22/2025
Violation issued (HPD, closed)
B
10/22/2025
Violation issued (HPD, closed)
B
10/22/2025
Violation issued (HPD, closed)
B
07/09/2025
Violation issued (FDNY_ORDER, closed)
04/21/2025
Signed off — Alteration
B00565435-I1
10/29/2024
Violation issued (ECB, open)
Construction
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/10/2024
Permit issued — Sidewalk Shed
B01107887-I1-SH
09/09/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01107887-I1
04/20/2024
Violation issued (HPD, closed)
C
04/20/2024
Violation issued (HPD, closed)
C
04/20/2024
Violation issued (HPD, closed)
C
04/20/2024
Violation issued (HPD, closed)
B
04/13/2024
Violation issued (HPD, closed)
B
04/13/2024
Violation issued (HPD, closed)
C
01/10/2024
Signed off — Alteration
INSTALLATION OF NEW GAS-FIRED BOILER FOR SPACE HEATING AND A SEPERATE GAS-FIRED DOMESTIC HOT WATER HEATING SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00705993-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/10/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/09/2023
Signed off — Alteration
RENOVATION OF APARTMENTS (INTERIOR ONLY). NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00489005-I1
12/28/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
12/19/2022
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
12/15/2022
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
12/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
12/15/2022
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
12/15/2022
Special inspection requirement — Final
MAURICIO ANDRADE
12/15/2022
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
12/14/2022
Filed — Alteration
RENOVATION OF APARTMENTS (INTERIOR ONLY). NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00489005-P3
12/12/2022
Filed — Alteration
B00565435-P5
12/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
12/08/2022
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
12/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
12/07/2022
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
12/06/2022
Filed — Alteration
INSTALLATION OF NEW GAS-FIRED BOILER FOR SPACE HEATING AND A SEPERATE GAS-FIRED DOMESTIC HOT WATER HEATING SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00705993-P1
12/06/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
12/06/2022
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
11/28/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/23/2022
Permit issued — Boiler Equipment
B00705993-I1-BE
08/05/2022
Filed — Alteration
INSTALLATION OF NEW GAS-FIRED BOILER FOR SPACE HEATING AND A SEPERATE GAS-FIRED DOMESTIC HOT WATER HEATING SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00705993-I1
07/25/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/20/2022
Filed — Alteration
RENOVATION OF APARTMENTS (INTERIOR ONLY). NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00489005-P2
07/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
07/20/2022
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
07/20/2022
Special inspection requirement — Final
MAURICIO ANDRADE
07/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
07/20/2022
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
07/12/2022
Filed — Alteration
B00565435-P4
06/21/2022
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
06/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
06/18/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/08/2022
Filed — Alteration
B00565435-P3
06/08/2022
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
06/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/19/2022
Filed — Alteration
B00565435-P2
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP09/10/2024
DOB NOWBoiler EquipmentSigned-offNEPTUNE MECHANICAL INC11/23/2022
DOB NOWGeneral ConstructionSigned-offNEPTUNE MECHANICAL INC02/02/2022
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC01/26/2022
DOB NOWGeneral ConstructionSigned-offNEPTUNE MECHANICAL INC01/11/2022
BISPLISSUEDELVERA SERV INC05/15/2000
BISOTISSUEDSEVENTH AVE MAINTANANCE CORP12/23/1998
BISBLISSUEDA & R FUELS SERVICE06/05/1995
2 projects · most recent 09/22/2026
HVAC Wiring General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedHYSA ELECTRICIANS CORPHVAC Wiring
01/03/2023CompleteCONDE ELECTRIC INCGeneral Wiring
1 project · most recent 09/09/2024
Sidewalk Shed
FiledStatusContractorScope
09/09/2024Permit IssuedACE GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/10/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/28/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/06/2022Pass-Final Boiler Equipment InspectionPassView ↗
11/28/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/25/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/18/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
12/19/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
12/19/2022Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
12/15/2022Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
12/15/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
12/15/2022Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
12/15/2022FinalMAURICIO ANDRADEprogress
12/15/2022Lighting in dwelling unitsMAURICIO ANDRADEenergy_progress
12/08/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
12/08/2022Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
12/07/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
12/07/2022Heating SystemsMAURICIO ANDRADEspecial
12/06/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
12/06/2022Heating SystemsMAURICIO ANDRADEspecial
07/20/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
07/20/2022Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
07/20/2022FinalMAURICIO ANDRADEprogress
07/20/2022Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
07/20/2022Lighting in dwelling unitsMAURICIO ANDRADEenergy_progress
06/21/2022Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
06/21/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
06/08/2022Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
06/08/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/18/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/18/2022Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
03/02/2022Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
Latest 25 of 31.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/31/2026B00565435-P1Request digital key ↗
08/31/2026B00565435-P2Request digital key ↗
08/31/2026B00565435-P3Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit10
08/31/2026B00489005-P3Open ↗
08/31/2026B00489005-P2Open ↗
08/31/2026B00489005-P1Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/31/2026B00565435-P1Open ↗
08/31/2026B00565435-P2Open ↗
08/31/2026B00565435-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00565435-P1Open ↗
08/29/2026B00489005-I1Open ↗
08/29/2026B00489005-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026B00705993-I1Open ↗
09/01/2026B00705993-P1Open ↗
09/01/2026B00565435-P1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/31/2026B00565435-P1Open ↗
08/31/2026B00565435-P2Open ↗
08/31/2026B00565435-P3Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/31/2026B00489005-I1Open ↗
▸Other Documents22
▸DOB NOWDHCR Document22
08/31/2026B00489005-P3Open ↗
08/31/2026B00489005-P3Open ↗
08/31/2026B00489005-P2Open ↗
Showing 3 of 22 on file for this type