Pier, dock, bulkhead
821 12TH AVENUE
MANHATTAN · BIN 1091663
💬 Discuss this project
2023Year Built
1Stories
T2Building Class
M2-3Zoning
235,412 sfGross Floor Area
1Units
Pier, dock, bulkhead · Owner of record: NYC Department of Transportation · 238,675 sf lot · 0.99 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHudson River Park125p · 5 filings · 20 docs
Floor 1Hudson River Park140p · 7 filings · 20 docs
MezzanineHudson River Park118p · 5 filings · 20 docs
CellarHudson River Park10p · 1 filing · 20 docs
Site & exterior56p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hudson River Park Trust5708/29/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Toshiko Mori507/17/2026
Jacob Feinberg Katz & Michaeli Cons903/11/2026
Thornton Tomasetti312/16/2024
Howard I. Shapiro & Associates511/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates3203/21/2026
Howard I Shapiro Associates1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
John Civetta & SonsGeneral Contractor1807/08/2026
ACS System AssociatesGeneral Contractor807/08/2026
John Civetta & SonsScaffold707/08/2026
Aspro PlumbingPlumbing407/08/2026
Eastern Plumbing & Mechanical ContractingPlumbing407/08/2026
Joe Parziale Plumbing CoPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bureau Veritas Na69021407/17/2026
Building Lifecycle
All (142)Filed (22)Permit Issued (33)Signed Off (8)Inspection (7)Objection (42)Special Inspection (30)
08/20/2026
Signed off — New Building
ERECT ONE STORY NEW BUILDING.
M00493589-I1
08/06/2026
Special inspection requirement — Fenestration air leakage
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Interior lighting power
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Lighting controls
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Air barrier - visual inspection
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Exterior lighting power
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Metering
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Fenestration areas
IBRAHIM MOURAD
08/06/2026
Special inspection requirement — Insulation placement and R values
IBRAHIM MOURAD
07/17/2026
Filed — New Building
ERECT ONE STORY NEW BUILDING.
M00493589-P4
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Lighting controls
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Fenestration air leakage
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Exterior lighting power
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Air barrier - visual inspection
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Interior lighting power
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Insulation placement and R values
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Metering
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Fenestration areas
IBRAHIM MOURAD
07/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
03/30/2026
Signed off — Alteration
PROVIDE NEW 6" INCOMING COLD WATER SERVICE IN TO PIER 97 COMFORT STATION.
M00510535-S1
03/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/11/2026
Filed — Alteration
PROVIDE NEW 6" INCOMING COLD WATER SERVICE IN TO PIER 97 COMFORT STATION.
M00510535-P2
09/11/2025
Filed — New Building
ERECT ONE STORY NEW BUILDING.
M00493589-P3
09/09/2025
Signed off — Alteration
M00512436-I1
09/09/2025
Signed off — Alteration
MECHANICAL WORK BEING FILED IN CONJUNCTION WITH NEW BUILDING #M00493589.
M00510543-I1
09/09/2025
Signed off — Alteration
PROVIDE NEW 6" INCOMING COLD WATER SERVICE IN TO PIER 97 COMFORT STATION.
M00510535-I1
09/09/2025
Signed off — Alteration
BOILER WORK BEING FILED IN CONJUNCTION WITH NEW BUILDING.
M00511581-I1
09/09/2025
Signed off — Alteration
FILING FOR STRUCTURAL WORK IN CONJUCTION WITH NEW BUILDING #M00493589.
M00510540-I1
06/20/2025
Permit issued — Plumbing
M00510535-S1-PL
05/07/2025
Signed off — Alteration
Installation of temporary construction fence as per plans filed herewith.
M00708872-I1
04/28/2025
Permit issued — Mechanical Systems
M00510543-I1-MS
04/15/2025
Special inspection requirement — Duct leakage testing, insulation and design
IBRAHIM MOURAD
04/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
04/15/2025
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
04/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
03/25/2025
Filed — Alteration
MECHANICAL WORK BEING FILED IN CONJUNCTION WITH NEW BUILDING #M00493589.
M00510543-P1
03/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2025
Permit issued — Plumbing
M00510535-I1-PL
02/05/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/15/2025
Filed — Alteration
BOILER WORK BEING FILED IN CONJUNCTION WITH NEW BUILDING.
M00511581-P3
12/16/2024
Filed — Alteration
FILING FOR STRUCTURAL WORK IN CONJUCTION WITH NEW BUILDING #M00493589.
M00510540-P2
12/09/2024
Filed — Alteration
BOILER WORK BEING FILED IN CONJUNCTION WITH NEW BUILDING.
M00511581-P2
12/04/2024
Permit issued — Construction Fence
M00708872-I1-FN
12/04/2024
Permit issued — General Construction
M00493589-I1-GC
12/04/2024
Permit issued — Structural
M00510540-I1-ST
12/04/2024
Permit issued — Foundation
M00512436-I1-FO
12/02/2024
Filed — Alteration
PROVIDE NEW 6" INCOMING COLD WATER SERVICE IN TO PIER 97 COMFORT STATION.
M00510535-P1
11/26/2024
Permit issued — Structural
M00510540-I1-ST
11/22/2024
Permit issued — Construction Fence
M00708872-I1-FN
11/22/2024
Permit issued — Foundation
M00512436-I1-FO
07/11/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAspro Plumbing06/20/2025
DOB NOWMechanical SystemsSigned-offACS System Associates04/28/2025
DOB NOWPlumbingSigned-offEastern Plumbing & Mechanical Contracting02/20/2025
DOB NOWConstruction FenceSigned-offJohn Civetta & Sons12/04/2024
DOB NOWGeneral ConstructionPermit IssuedJohn Civetta & Sons12/04/2024
DOB NOWStructuralSigned-offJohn Civetta & Sons12/04/2024
DOB NOWFoundationSigned-offJohn Civetta & Sons12/04/2024
DOB NOWStructuralSigned-offJohn Civetta & Sons11/26/2024
DOB NOWConstruction FenceSigned-offJohn Civetta & Sons11/22/2024
DOB NOWFoundationSigned-offJohn Civetta & Sons11/22/2024
DOB NOWPlumbingSigned-offAspro Plumbing06/26/2024
DOB NOWMechanical SystemsSigned-offACS System Associates04/18/2024
DOB NOWMechanical SystemsSigned-offACS System Associates04/11/2024
DOB NOWPlumbingSigned-offEastern Plumbing & Mechanical Contracting02/16/2024
DOB NOWBoiler EquipmentSigned-offJoe Parziale Plumbing Co01/30/2024
DOB NOWConstruction FenceSigned-offJohn Civetta & Sons12/28/2023
DOB NOWFoundationSigned-offJohn Civetta & Sons12/28/2023
DOB NOWStructuralSigned-offJohn Civetta & Sons12/28/2023
DOB NOWGeneral ConstructionPermit IssuedJohn Civetta & Sons07/11/2023
DOB NOWPlumbingSigned-offAspro Plumbing06/20/2023
DOB NOWBoiler EquipmentSigned-offJoe Parziale Plumbing Co06/17/2023
DOB NOWMechanical SystemsSigned-offACS System Associates04/12/2023
DOB NOWConstruction FenceSigned-offJohn Civetta & Sons03/17/2023
DOB NOWStructuralSigned-offJohn Civetta & Sons03/17/2023
DOB NOWFoundationSigned-offJohn Civetta & Sons03/17/2023
DOB NOWPlumbingSigned-offEastern Plumbing & Mechanical Contracting02/22/2023
DOB NOWPlumbingSigned-offAspro Plumbing01/30/2023
DOB NOWGeneral ConstructionPermit IssuedJohn Civetta & Sons07/13/2022
DOB NOWMechanical SystemsSigned-offACS System Associates05/13/2022
DOB NOWConstruction FenceSigned-offJohn Civetta & Sons04/14/2022
DOB NOWPlumbingSigned-offEastern Plumbing & Mechanical Contracting03/21/2022
DOB NOWStructuralSigned-offJohn Civetta & Sons03/03/2022
DOB NOWFoundationSigned-offJohn Civetta & Sons03/03/2022
3 projects · most recent 04/20/2026
General Wiring
FiledStatusContractorScope
04/20/2026CompleteRegional Electrical Voice—
01/14/2026CompleteRegional Electrical VoiceGeneral Wiring
03/06/2025CompleteInterphase ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/21/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
08/06/2026Energy Code Compliance InspectionsIBRAHIM MOURADprogress
08/06/2026MeteringIBRAHIM MOURADenergy_progress
08/06/2026Lighting controlsIBRAHIM MOURADenergy_progress
08/06/2026Fenestration air leakageIBRAHIM MOURADenergy_progress
08/06/2026Fenestration areasIBRAHIM MOURADenergy_progress
08/06/2026Air barrier - visual inspectionIBRAHIM MOURADenergy_progress
08/06/2026Insulation placement and R valuesIBRAHIM MOURADenergy_progress
08/06/2026Interior lighting powerIBRAHIM MOURADenergy_progress
08/06/2026Fenestration and door U-factor and product ratingsIBRAHIM MOURADenergy_progress
08/06/2026Exterior lighting powerIBRAHIM MOURADenergy_progress
08/06/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
08/06/2026Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
08/06/2026Lowest Floor ElevationIBRAHIM MOURADprogress
07/17/2026Energy Code Compliance InspectionsIBRAHIM MOURADprogress
07/17/2026MeteringIBRAHIM MOURADenergy_progress
07/17/2026Interior lighting powerIBRAHIM MOURADenergy_progress
07/17/2026Insulation placement and R valuesIBRAHIM MOURADenergy_progress
07/17/2026Fenestration air leakageIBRAHIM MOURADenergy_progress
07/17/2026Fenestration and door U-factor and product ratingsIBRAHIM MOURADenergy_progress
07/17/2026Lighting controlsIBRAHIM MOURADenergy_progress
07/17/2026Lowest Floor ElevationIBRAHIM MOURADprogress
07/17/2026Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
07/17/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
07/17/2026Fenestration areasIBRAHIM MOURADenergy_progress
07/17/2026Air barrier - visual inspectionIBRAHIM MOURADenergy_progress
Latest 25 of 79.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hudson River ParkGovernment / CivicCellar, Floor 1, Mezzanine, Roof
Project M00511581 Alteration · LOC Issued · 05/20/2021
Project M00510535 Alteration · LOC Issued · 05/17/2021
Project M00510543 Alteration · LOC Issued · 05/17/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 164 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/03/2026M00510543-P1Request digital key ↗
09/03/2026M00510543-I1Request digital key ↗
09/03/2026M00511581-P3Request digital key ↗
Showing 3 of 22 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/27/2026M00493589-P4Open ↗
08/13/2026M00493589-P3Open ↗
08/13/2026M00493589-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026M00493589-I1Open ↗
▸Seals & Professional Certifications53
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/03/2026M00510543-P1Open ↗
09/03/2026M00510543-I1Open ↗
09/03/2026M00511581-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026M00510543-I1Open ↗
09/01/2026M00510543-I1Open ↗
08/28/2026M00510543-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026M00511581-I1Open ↗
09/01/2026M00510535-I1Open ↗
09/01/2026M00511581-P3Open ↗
Showing 3 of 13 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026M00493589-P1Open ↗
08/13/2026M00493589-P3Open ↗
08/13/2026M00493589-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/27/2026M00493589-P4Open ↗
08/27/2026M00493589-P3Open ↗
08/27/2026M00493589-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00510543-I1Open ↗
08/13/2026M00493589-I1Open ↗
▸Approvals, Objections & Sign-offs52
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)22
09/03/2026M00511581-P2Open ↗
09/03/2026M00511581-I1Open ↗
09/03/2026M00511581-P3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
09/03/2026M00510543-P1Open ↗
09/03/2026M00510543-I1Open ↗
09/03/2026M00511581-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
09/03/2026M00511581-I1Open ↗
08/28/2026M00708872-I1Open ↗
08/13/2026M00512436-I1Open ↗
Showing 3 of 8 on file for this type
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026M00493589-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026M00493589-I1Open ↗
▸Other Documents18
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/27/2026M00493589-P4Open ↗
08/13/2026M00493589-P1Open ↗
08/13/2026M00493589-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/27/2026M00493589-P4Open ↗
08/13/2026M00493589-P1Open ↗
08/13/2026M00493589-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFlood Plan Emergency Temporary Flood Shields5
08/27/2026M00493589-P4Open ↗
08/27/2026M00493589-P1Open ↗
08/27/2026M00493589-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026M00493589-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026M00493589-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00493589-I1Open ↗