Roof5p · 3 filings · 9 docs
ElectricalFire ProtectionMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of temporary air pressurized standpipe system in conjunction with new building application #420663115.
On file for this project
3 documents · 1 drawing sheet
Installation of a temporary overhead protection and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
4 documents · 4 drawing sheets
INSTALLATION OF 4,500 LBS GJJ SC200GD SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH NB:420663115. WORK SHALL COMPLY WITH 2022 NYC BUILDING CODE. INSTALLATION AND TESTS AS PER ANSI A 10.4-2016, SAFETY REQUIREMENTS FOR PERSONNEL HOISTS
On file for this project
2 documents
Floor 81p · 2 filings · 5 docs
ArchitectureFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of temporary air pressurized standpipe system in conjunction with new building application #420663115.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF 4,500 LBS GJJ SC200GD SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH NB:420663115. WORK SHALL COMPLY WITH 2022 NYC BUILDING CODE. INSTALLATION AND TESTS AS PER ANSI A 10.4-2016, SAFETY REQUIREMENTS FOR PERSONNEL HOISTS
On file for this project
2 documents
Floor 71p · 2 filings · 5 docs
ElectricalFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of temporary air pressurized standpipe system in conjunction with new building application #420663115.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF 4,500 LBS GJJ SC200GD SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH NB:420663115. WORK SHALL COMPLY WITH 2022 NYC BUILDING CODE. INSTALLATION AND TESTS AS PER ANSI A 10.4-2016, SAFETY REQUIREMENTS FOR PERSONNEL HOISTS
On file for this project
2 documents
Floor 61p · 2 filings · 5 docs
ElectricalFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of temporary air pressurized standpipe system in conjunction with new building application #420663115.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF 4,500 LBS GJJ SC200GD SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH NB:420663115. WORK SHALL COMPLY WITH 2022 NYC BUILDING CODE. INSTALLATION AND TESTS AS PER ANSI A 10.4-2016, SAFETY REQUIREMENTS FOR PERSONNEL HOISTS
On file for this project
2 documents
Floor 51p · 2 filings · 5 docs
ElectricalFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of temporary air pressurized standpipe system in conjunction with new building application #420663115.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF 4,500 LBS GJJ SC200GD SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH NB:420663115. WORK SHALL COMPLY WITH 2022 NYC BUILDING CODE. INSTALLATION AND TESTS AS PER ANSI A 10.4-2016, SAFETY REQUIREMENTS FOR PERSONNEL HOISTS
On file for this project
2 documents
Floor 42 filings · 5 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of temporary air pressurized standpipe system in conjunction with new building application #420663115.
On file for this project
3 documents
INSTALLATION OF 4,500 LBS GJJ SC200GD SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH NB:420663115. WORK SHALL COMPLY WITH 2022 NYC BUILDING CODE. INSTALLATION AND TESTS AS PER ANSI A 10.4-2016, SAFETY REQUIREMENTS FOR PERSONNEL HOISTS
On file for this project
2 documents
Floor 32 filings · 5 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of temporary air pressurized standpipe system in conjunction with new building application #420663115.
On file for this project
3 documents
INSTALLATION OF 4,500 LBS GJJ SC200GD SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH NB:420663115. WORK SHALL COMPLY WITH 2022 NYC BUILDING CODE. INSTALLATION AND TESTS AS PER ANSI A 10.4-2016, SAFETY REQUIREMENTS FOR PERSONNEL HOISTS
On file for this project
2 documents
Floor 21p · 2 filings · 5 docs
ElectricalFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of temporary air pressurized standpipe system in conjunction with new building application #420663115.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF 4,500 LBS GJJ SC200GD SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH NB:420663115. WORK SHALL COMPLY WITH 2022 NYC BUILDING CODE. INSTALLATION AND TESTS AS PER ANSI A 10.4-2016, SAFETY REQUIREMENTS FOR PERSONNEL HOISTS
On file for this project
2 documents
Floor 11p · 2 filings · 5 docs
ArchitectureFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of temporary air pressurized standpipe system in conjunction with new building application #420663115.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF 4,500 LBS GJJ SC200GD SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH NB:420663115. WORK SHALL COMPLY WITH 2022 NYC BUILDING CODE. INSTALLATION AND TESTS AS PER ANSI A 10.4-2016, SAFETY REQUIREMENTS FOR PERSONNEL HOISTS
On file for this project
2 documents
Cellar1p · 2 filings · 5 docs
ElectricalFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of temporary air pressurized standpipe system in conjunction with new building application #420663115.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF 4,500 LBS GJJ SC200GD SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH NB:420663115. WORK SHALL COMPLY WITH 2022 NYC BUILDING CODE. INSTALLATION AND TESTS AS PER ANSI A 10.4-2016, SAFETY REQUIREMENTS FOR PERSONNEL HOISTS
On file for this project
2 documents
Sub-Cellar1p · 2 filings · 5 docs
ArchitectureFire Protection
Issued Permit Scope
Protection and Mechanical Methods · Standpipe
Installation of temporary air pressurized standpipe system in conjunction with new building application #420663115.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF 4,500 LBS GJJ SC200GD SINGLE CAR PERSONAL/MATERIAL HOIST AS PER PLAN IN CONJUNCTION WITH NB:420663115. WORK SHALL COMPLY WITH 2022 NYC BUILDING CODE. INSTALLATION AND TESTS AS PER ANSI A 10.4-2016, SAFETY REQUIREMENTS FOR PERSONNEL HOISTS
On file for this project
2 documents