| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00728387 ↗ | 822 55 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 05/03/2022 | 04/19/2024 | Design YANG ENGINEERING LLC Owner JRL SKYLINE INC Contractor JOHN EVAN CONTRACTING COR Filer SD DESIGN STUDIO LLC | THIS APPLICATION TO FILE STRUCTURE WORK IN CONJUNCTION WITH ALT-CO NEW BUILDING JOB #: B00728387. |
| M00874076 ↗ | 227 10 AVENUE MANHATTAN | Alteration CO | Permit Issued | 08/17/2023 | 01/22/2024 | Design JUNG H. CHOI, ARCHITECT, PC Contractor NY SIGNATURE BUILDERS LLC | Structural work for roof terrance |
| B00739174 ↗ | 822 55 STREET BROOKLYN | Alteration | Signed-off | 08/04/2022 | 09/28/2023 | Owner 55 STREET CHEN JIANG LLC Contractor CITYWIDE PLBG HTG & SPKLS Filer SD DESIGN STUDIO LLC | PLUMBING AND SPRINKLER APPLICATION FILE IN CONJUNCTION WITH ALTERATION-CO JOB#B00728387-I1. PROPOSED PLUMBING AND SPRINKLER WORK ON CELLAR, … |
| B00769438 ↗ | 641 62 STREET BROOKLYN | Alteration CO | Permit Issued | 07/06/2022 | 05/12/2023 | Design A & T ENGINEERING, P.C. Contractor TOP CONSTRUCTION GROUP, I Filer CNY ENGINEERING PC | MODIFY SPRINKLER SYSTEM ACCORDING TO NEW LAYOUT ON THE 1ST AND MEZZ FLOOR IN CONJUNCTION WITH #B00769438.NO CHANGE IN USE,EGRESS AND OCCUPAN… |
| X08023722 ↗ | 419 EAST 135 STREET BRONX | Alteration | Permit Issued | 10/19/2022 | 03/30/2023 | Design KBN SERVICES LLC Owner BLUE HILL REALTY Contractor BHR EQUITIES LLC Filer KBN SERVICES LLC | INSTALLATION OF TEMPORARY SUPPORT RAKERS FOR USE DURING PARTIAL DEMOLITION |
| Q00754308 ↗ | 83-05 116 STREET QUEENS | Alteration | Permit Issued | 06/09/2022 | 12/06/2022 | Design LMW ENGINEERING GROUP LLC Owner STARLINK CONDOMINIUM LLC Contractor YE'S NATIONAL CONSTRUCTIO | Foundation work type hereby filed for 421A program in conjunction with NB job number: 420663115 |
| Name | Projects together | Most recent |
|---|---|---|
| INDETAIL ARCHITECTURAL AND ENGIN | 2 | 04/11/2024 |
| JIMENEZ BUILDING CONSULTING LLC | 2 | 02/26/2025 |
| A & T ENGINEERING, P.C. | 1 | 05/02/2024 |
| BAYSIDE ENGINEERING PC | 1 | 02/26/2025 |
| CNY ENGINEERING P.C | 1 | 05/02/2024 |
| JUNG H. CHOI, ARCHITECT, PC | 1 | 04/11/2024 |
| KBN SERVICES LLC | 1 | 10/19/2022 |
| LMW ENGINEERING GROUP LLC | 1 | 06/09/2022 |
| YANG ENGINEERING LLC | 1 | 02/26/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| BHR EQUITIES LLC | 1 | 10/19/2022 |
| DYNAMIC PLBG & SPRKLR COR | 1 | 11/18/2023 |
| DYNAMIC PLBNG & SPRKR COR | 1 | 11/18/2023 |
| GANIC PLUMBING & HTG INC | 1 | 04/11/2024 |
| JEM FIRE PREVENTION INC | 1 | 05/02/2024 |
| JOHN EVAN CONTRACTING COR | 1 | 02/26/2025 |
| JRL SKYLINE INC | 1 | 02/26/2025 |
| NY SIGNATURE BUILDERS LLC | 1 | 04/11/2024 |
| PZ PAINTERS, LLC | 1 | 07/19/2022 |
| STONEHILL CONSTR SERV INC | 1 | 06/09/2022 |
| TOP CONSTRUCTION GROUP, I | 1 | 05/02/2024 |
| YE'S NATIONAL CONSTRUCTIO | 1 | 06/09/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| 55 STREET CHEN JIANG LLC | 1 | 11/18/2023 |
| BLUE HILL REALTY | 1 | 10/19/2022 |
| JRL SKYLINE INC | 1 | 02/26/2025 |
| STARLINK CONDOMINIUM LLC | 1 | 06/09/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| SD DESIGN STUDIO LLC | 2 | 02/26/2025 |
| ADVANCED BUILDERS SERVICES | 1 | 06/09/2022 |
| CNY ENGINEERING PC | 1 | 05/02/2024 |
| KBN SERVICES LLC | 1 | 10/19/2022 |
| SAGACITY BUILDING SERVICES | 1 | 04/11/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00728387 ↗ | 822 55 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 05/03/2022 | 04/19/2024 | Design YANG ENGINEERING LLC Owner JRL SKYLINE INC Contractor JOHN EVAN CONTRACTING COR Filer SD DESIGN STUDIO LLC | THIS APPLICATION TO FILE STRUCTURE WORK IN CONJUNCTION WITH ALT-CO NEW BUILDING JOB #: B00728387. |
| M00874076 ↗ | 227 10 AVENUE MANHATTAN | Alteration CO | Permit Issued | 08/17/2023 | 01/22/2024 | Design JUNG H. CHOI, ARCHITECT, PC Contractor NY SIGNATURE BUILDERS LLC | Structural work for roof terrance |
| B00739174 ↗ | 822 55 STREET BROOKLYN | Alteration | Signed-off | 08/04/2022 | 09/28/2023 | Owner 55 STREET CHEN JIANG LLC Contractor CITYWIDE PLBG HTG & SPKLS Filer SD DESIGN STUDIO LLC | PLUMBING AND SPRINKLER APPLICATION FILE IN CONJUNCTION WITH ALTERATION-CO JOB#B00728387-I1. PROPOSED PLUMBING AND SPRINKLER WORK ON CELLAR, … |
| B00769438 ↗ | 641 62 STREET BROOKLYN | Alteration CO | Permit Issued | 07/06/2022 | 05/12/2023 | Design A & T ENGINEERING, P.C. Contractor TOP CONSTRUCTION GROUP, I Filer CNY ENGINEERING PC | MODIFY SPRINKLER SYSTEM ACCORDING TO NEW LAYOUT ON THE 1ST AND MEZZ FLOOR IN CONJUNCTION WITH #B00769438.NO CHANGE IN USE,EGRESS AND OCCUPAN… |
| X08023722 ↗ | 419 EAST 135 STREET BRONX | Alteration | Permit Issued | 10/19/2022 | 03/30/2023 | Design KBN SERVICES LLC Owner BLUE HILL REALTY Contractor BHR EQUITIES LLC Filer KBN SERVICES LLC | INSTALLATION OF TEMPORARY SUPPORT RAKERS FOR USE DURING PARTIAL DEMOLITION |
| Q00754308 ↗ | 83-05 116 STREET QUEENS | Alteration | Permit Issued | 06/09/2022 | 12/06/2022 | Design LMW ENGINEERING GROUP LLC Owner STARLINK CONDOMINIUM LLC Contractor YE'S NATIONAL CONSTRUCTIO | Foundation work type hereby filed for 421A program in conjunction with NB job number: 420663115 |
| X00763756 ↗ | 1610 BOSTON ROAD BRONX | Alteration | Signed-off | 07/19/2022 | 07/27/2022 | Contractor PZ PAINTERS, LLC | HEREBY FILING FOR THE INSTALLATION OF METAL PANEL CLADDING OF EXTERIOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Building | Filings | Most Recent |
|---|---|---|
| 641 62 STREET ↗ | 4 | 05/02/2024 |
| 822 55 STREET ↗ | 4 | 11/18/2023 |
| 227 10 AVENUE ↗ | 1 | 09/27/2023 |
| 419 EAST 135 STREET ↗ | 1 | 10/19/2022 |
| 1610 BOSTON ROAD ↗ | 1 | 07/19/2022 |
| 83-05 116 STREET ↗ | 1 | 06/09/2022 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 05/08/2024 | Fenestration and door U-factor and product ratings | 641 62 STREET | — | energy_progress |
| 05/08/2024 | Fenestration areas | 641 62 STREET | — | energy_progress |
| 05/08/2024 | Final | 641 62 STREET | Eric Sun | progress |
| 05/08/2024 | Fire-Resistance Rated Construction | 641 62 STREET | Eric Sun | progress |
| 05/08/2024 | Structural Steel - High Strength Bolting | 641 62 STREET | Lin Wang | special |
| 05/08/2024 | Structural Steel - Details | 641 62 STREET | Lin Wang | special |
| 05/08/2024 | Structural Cold-Formed Steel | 641 62 STREET | Lin Wang | special |
| 05/08/2024 | Fire-Resistant Penetrations and Joints | 641 62 STREET | Eric Sun | special |
| 05/08/2024 | Insulation placement and R values | 641 62 STREET | — | energy_progress |
| 05/08/2024 | Vestibules | 641 62 STREET | — | energy_progress |
| 05/08/2024 | Structural Steel - Welding | 641 62 STREET | Lin Wang | special |
| 05/08/2024 | Air barrier - visual inspection | 641 62 STREET | — | energy_progress |
| 05/08/2024 | Structural Stability – Alterations of existing buildings | 641 62 STREET | Lin Wang | special |
| 05/08/2024 | Fenestration air leakage | 641 62 STREET | — | energy_progress |
| 05/02/2024 | Insulation placement and R values | 641 62 STREET | — | energy_progress |
| 05/02/2024 | Fenestration areas | 641 62 STREET | — | energy_progress |
| 05/02/2024 | Vestibules | 641 62 STREET | — | energy_progress |
| 05/02/2024 | Fenestration and door U-factor and product ratings | 641 62 STREET | — | energy_progress |
| 05/02/2024 | Fenestration air leakage | 641 62 STREET | — | energy_progress |
| 05/02/2024 | Air barrier - visual inspection | 641 62 STREET | — | energy_progress |
| 05/02/2024 | Fire-Resistance Rated Construction | 641 62 STREET | Eric Sun | progress |
| 05/02/2024 | Final | 641 62 STREET | Eric Sun | progress |
| 05/02/2024 | Structural Steel - Welding | 641 62 STREET | Lin Wang | special |
| 05/02/2024 | Structural Steel - High Strength Bolting | 641 62 STREET | Lin Wang | special |
| 05/02/2024 | Structural Steel - Details | 641 62 STREET | Lin Wang | special |
| 05/02/2024 | Structural Stability – Alterations of existing buildings | 641 62 STREET | Lin Wang | special |
| 05/02/2024 | Structural Cold-Formed Steel | 641 62 STREET | Lin Wang | special |
| 05/02/2024 | Fire-Resistant Penetrations and Joints | 641 62 STREET | Eric Sun | special |
| 04/16/2024 | Air barrier - visual inspection | 641 62 STREET | — | energy_progress |
| 04/16/2024 | Fenestration areas | 641 62 STREET | — | energy_progress |
| 04/16/2024 | Fenestration air leakage | 641 62 STREET | — | energy_progress |
| 04/16/2024 | Fenestration and door U-factor and product ratings | 641 62 STREET | — | energy_progress |
| 04/16/2024 | Insulation placement and R values | 641 62 STREET | — | energy_progress |
| 04/16/2024 | Vestibules | 641 62 STREET | — | energy_progress |
| 03/01/2024 | Fire-Resistant Penetrations and Joints | 641 62 STREET | Eric Sun | special |
| 03/01/2024 | Structural Cold-Formed Steel | 641 62 STREET | Lin Wang | special |
| 03/01/2024 | Structural Stability – Alterations of existing buildings | 641 62 STREET | Lin Wang | special |
| 03/01/2024 | Structural Steel - Details | 641 62 STREET | Lin Wang | special |
| 03/01/2024 | Structural Steel - High Strength Bolting | 641 62 STREET | Lin Wang | special |
| 03/01/2024 | Structural Steel - Welding | 641 62 STREET | Lin Wang | special |
| 03/01/2024 | Final | 641 62 STREET | Eric Sun | progress |
| 03/01/2024 | Fire-Resistance Rated Construction | 641 62 STREET | Eric Sun | progress |
| 11/20/2023 | Fire-Resistant Penetrations and Joints | 822 55 STREET | Lin Wang | special |
| 11/20/2023 | Sprinkler Systems | 822 55 STREET | Lin Wang | special |
| 11/20/2023 | Energy Code Compliance Inspections | 822 55 STREET | Lin Wang | progress |
| 11/20/2023 | HVAC-R and service water heating system controls | 822 55 STREET | Lin Wang | energy_progress |
| 11/20/2023 | HVAC-R and service water heating equipment | 822 55 STREET | Lin Wang | energy_progress |
| 11/20/2023 | Maintenance information | 822 55 STREET | Lin Wang | energy_progress |
| 11/20/2023 | HVAC-R and service water piping design and insulation | 822 55 STREET | Lin Wang | energy_progress |
| 11/16/2023 | Fire-Resistant Penetrations and Joints | 822 55 STREET | Lin Wang | special |