830 ELTON AVENUE
BRONX · BIN 2001481
💬 Discuss this project
1906Year Built
5Stories
C1Building Class
R7-2Zoning
17,150 sfGross Floor Area
21Units
Rent Stabilized27 Active Violations 26 unresolved · 1 paperwork only 1 likely answered 1 old, status unconfirmed ▸
Over six families without stores · Owner of record: 830 Elton Ave · 5,000 sf lot · 3.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofChimney and boiler room work1p · 1 filing · 6 docs
Floor 4Unit 2D, Unit 4A5p · 2 filings · 9 docs
Floor 3
Floor 2
Floor 1Fence wall repairing2p · 1 filing · 4 docs
CellarChimney and boiler room work2p · 1 filing · 6 docs
Site & exteriorChimney and boiler room work9p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Highbridge Construction Group703/22/2026
Stonelock Properties504/09/2026
830 Elton503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2018$3.9M—830 ELTON LLC → 830 ELTON AVE LLC$227/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering105/14/2025
M C Structural Engineering111/01/2023
Ashraf108/31/2022
Lighthouse407/21/2022
Mohammad Ahead, PE106/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CB Expediting303/21/2026
Arsenal Building Consultants203/21/2026
Jack Jaffa & Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Watson's Plumbing, Heating, & BuildingPlumbing307/08/2026
DM ContractingGeneral Contractor203/21/2026
Robin ElectricalElectrical103/21/2026
J & G Construction ServicesScaffold107/08/2026
Ariston Chimneyspecialty_contractor104/09/2026
KW NY ConstructionGeneral Contractor107/08/2026
Highbridge Construction GroupGeneral Contractor110/23/2019
SMVP ManagementGeneral Contractor110/23/2018
Two Brothers ConstructionGeneral Contractor106/20/2012
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808105/14/2025
M C Structural Engineering4890111/01/2023
Lighthouse5538107/21/2022
Building Lifecycle
05/21/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
X01219512-I1-MS
05/14/2026
Boiler inspection report filed
Initial · no defects · Accepted
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation · open
10/08/2025
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 1D, 4th STORY,…
HPD violation · closed
10/08/2025
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE BATHROOM LOCATED AT APT 1D, 4th…
HPD violation · closed
242 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAriston Chimney05/21/2025
DOB NOWStructuralSigned-offDM Contracting01/29/2024
DOB NOWGeneral ConstructionSigned-offKW NY Construction07/27/2022
DOB NOWSidewalk ShedSigned-offJ & G Construction Services06/15/2022
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building02/04/2020
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building12/19/2019
DOB NOWPlumbingSigned-offWatson's Plumbing, Heating, & Building12/12/2019
BISOTISSUEDHighbridge Construction Group10/23/2019
BISOTISSUEDSMVP Management10/23/2018
BISOTISSUEDTwo Brothers Construction06/20/2012
BISBLISSUEDA & C Combustion Service01/13/1992
1 project · most recent 02/11/2020
Water/Sanitary
FiledStatusContractorScope
02/11/2020Signed-offWatson's Plumbing, Heating, & BuildingWater/Sanitary
4 projects · most recent 06/15/2022
General Wiring
FiledStatusContractorScope
06/15/2022CompleteRichard Neu—
02/03/2020CompleteRobin ElectricalGeneral Wiring
11/07/2019Permit IssuedJoseph Weinstein ElectricGeneral Wiring
08/29/2018Permit IssuedAccurate ElectricalGeneral Wiring
1 project · most recent 08/31/2022
Scaffold
FiledStatusContractorScope
08/31/2022——Scaffold
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/01/2025FinalJoseph Baziniprogress
05/01/2025Mechanical SystemsJoseph Bazinispecial
05/01/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
05/01/2025Chimneys and ventsJoseph Bazinispecial
09/11/2022Post-installed Anchors—special
07/19/2022Energy Code Compliance InspectionsSAMIR ABDALLAprogress
07/19/2022Air barrier - visual inspectionSAMIR ABDALLAenergy_progress
07/19/2022Structural Stability – Alterations of existing buildingsSAMIR ABDALLAspecial
07/19/2022MasonrySAMIR ABDALLAspecial
07/19/2022Fire-Resistant Penetrations and JointsSAMIR ABDALLAspecial
07/19/2022FinalSAMIR ABDALLAprogress
06/13/2022FinalMOHAMMAD AHEADprogress
122 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account