← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
832 57 STREET
BROOKLYN · BIN 3140175
💬 Discuss this project
1920Year Built
5Stories
RMBuilding Class
R6Zoning
7,433 sfGross Floor Area
9Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 832 BROOKLYN BUILDING LLC · 2,500 sf lot · 2.97 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Cellar10p · 1 filing · 20 docs
Basement11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCK GROUP NY1107/08/2026
MASTER WORKS CONTRACTOR903/22/2026
DZ IMAGE INC503/22/2026
EMPIRE CONSTRUCTION103/22/2026
832 BROOKLYN BUILDING1703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
XIAO ENGINEERING PLLC805/07/2026
YOUN DESIGN CORP.112/07/2025
ASIF JAMIL, RA109/11/2018
MOHAMMAD AHEAD, PE108/24/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO403/21/2026
CONVERSANO ASSOCIATES, INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK GROUP NY CORPGeneral Contractor807/08/2026
CASE PLUMBING LLCFire Protection107/08/2026
TOP BUILD CONTRACTORS INCGeneral Contractor107/08/2026
WELLDONE INSPECTIONS INCGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WELLDONE INSPECTION INC.8628805/07/2026
Building Lifecycle
All (145)Filed (11)Permit Issued (9)Signed Off (6)Violation (48)Inspection (11)Objection (30)Special Inspection (30)
05/28/2026
Signed off — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-I1
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
05/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
QIUFAN JIANG
05/22/2026
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
05/22/2026
Special inspection requirement — Lighting controls
QIUFAN JIANG
05/22/2026
Special inspection requirement — Metering
QIUFAN JIANG
05/22/2026
Special inspection requirement — Interior lighting power
QIUFAN JIANG
05/07/2026
Filed — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-P4
05/06/2026
Special inspection requirement — Metering
QIUFAN JIANG
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
05/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
QIUFAN JIANG
05/06/2026
Special inspection requirement — Lighting controls
QIUFAN JIANG
05/06/2026
Special inspection requirement — Interior lighting power
QIUFAN JIANG
05/01/2026
Violation issued (HPD, closed)
A
03/30/2026
Signed off — Alteration
B01325867-I1
03/13/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
02/20/2026
Permit issued — Sign
B01325867-I1-SG
01/20/2026
Signed off — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-S1
01/20/2026
Signed off — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-S2
01/20/2026
Signed off — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-S3
01/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/11/2025
Special inspection requirement — Final
QIUFAN JIANG
12/11/2025
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
QIUFAN JIANG
12/11/2025
Special inspection requirement — Mechanical Systems
QIUFAN JIANG
12/11/2025
Special inspection requirement — Duct leakage testing, insulation and design
QIUFAN JIANG
12/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
QIUFAN JIANG
12/11/2025
Special inspection requirement — Maintenance information
QIUFAN JIANG
12/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
QIUFAN JIANG
12/11/2025
Special inspection requirement — Shutoff dampers
QIUFAN JIANG
12/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QIUFAN JIANG
12/07/2025
Filed — Alteration
B01325867-I1
12/02/2025
Filed — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-P3
12/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
QIUFAN JIANG
12/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
QIUFAN JIANG
12/01/2025
Special inspection requirement — Maintenance information
QIUFAN JIANG
12/01/2025
Special inspection requirement — Duct leakage testing, insulation and design
QIUFAN JIANG
12/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/01/2025
Special inspection requirement — Mechanical Systems
QIUFAN JIANG
12/01/2025
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
12/01/2025
Special inspection requirement — Final
QIUFAN JIANG
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection resolved — Addressed
11/13/2025
Objection raised — Admin
11/13/2025
Objection raised — Scope
11/04/2025
Filed — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-P1
11/04/2025
Filed — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-P2
10/31/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/22/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/30/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/22/2025
Permit issued — Mechanical Systems
B01239699-S2-MS
09/17/2025
Permit issued — Sprinklers
B01239699-S3-EW-SP
09/15/2025
Permit issued — Plumbing
B01239699-S1-PL
09/10/2025
Permit issued — General Construction
B01239699-I1-GC
09/04/2025
Objection resolved — Addressed
08/27/2025
Objection resolved — Addressed
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC02/20/2026
DOB NOWMechanical SystemsSigned-offWELLDONE INSPECTIONS INC09/22/2025
DOB NOWSprinklersSigned-offS & L PLUMBING INC09/17/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/15/2025
DOB NOWGeneral ConstructionPermit IssuedTOP BUILD CONTRACTORS INC09/10/2025
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP10/06/2022
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP08/18/2021
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP12/20/2018
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP08/24/2018
BISPLISSUEDVMC PLUMBING & HEATING IN06/10/2022
BIS—ISSUEDEMPRISE CONSTRUCTION INC07/19/2021
BIS—ISSUEDEMPRISE CONSTRUCTION INC07/19/2021
BISPLISSUEDVMC PLUMBING & HEATING IN07/13/2021
BIS—ISSUEDEMPRISE CONSTRUCTION INC06/03/2021
BISEQISSUEDEMPRISE CONSTRUCTION INC05/27/2021
BISEQISSUEDEMPRISE CONSTRUCTION INC02/16/2021
BISPLISSUEDVMC PLUMBING & HEATING IN02/11/2021
BIS—ISSUEDEMPRISE CONSTRUCTION INC01/22/2021
BISEQISSUEDMASTER WORKS CONTRACTOR I05/10/2019
BIS—ISSUEDMASTER WORKS CONTRACTOR I05/10/2019
BIS—ISSUEDMASTER WORKS CONTRACTOR I05/10/2019
BISPLISSUEDFLYTIGER P & H LTD05/08/2019
BIS—ISSUEDMASTER WORKS CONTRACTOR I07/24/2018
BIS—ISSUEDMASTER WORKS CONTRACTOR I07/24/2018
BISEQISSUEDMASTER WORKS CONTRACTOR I07/24/2018
BISPLISSUEDFLYTIGER P & H LTD02/06/2018
BIS—ISSUEDD Z IMAGE INC01/18/2018
BISEQISSUEDD Z IMAGE INC01/18/2018
BIS—ISSUEDD Z IMAGE INC01/18/2018
1 project · most recent 05/07/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2026Signed-offWELLDONE INSPECTIONS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree LIV09HP230V1R32AH 9,000 BTU · Fan Coil Indoor ×10
4LIV18HP230V1AH 17,600 BTU · Fan Coil Indoor ×4
4LIV18HP230V1AO 17,600 BTU · Condensing Unit ×4
LIV07HP230V1R32AH 7,000 BTU · Fan Coil Indoor ×4
MUL24HP230V1R32A0 24,000 BTU · Condensing Unit ×2
MUL36HP230V1R32A0 36,000 BTU · Condensing Unit ×2
4LIV18HP230VIA0 36,700 BTU · Condensing Unit ×2
4LIV18HP230VIAH 36,700 BTU · Fan Coil Indoor ×2
Mitsubishi Electric MSZ-GX36NL 33,800 BTU · Fan Coil Indoor ×2
MUZ-GX36NL 33,800 BTU · Condensing Unit ×2
Ventilation
Mitsubishi Electric TLGHF0300RVX02A 250 CFM · Vrf Indoor ×2
1 project · most recent 05/07/2026
Sprinkler System
FiledStatusContractorScope
05/07/2026Signed-offCASE PLUMBING LLCSprinkler System
1 project · most recent 05/07/2026
Water/Sanitary
FiledStatusContractorScope
05/07/2026Signed-offAMERICAN STANDARD P&H CORWater/Sanitary
8 projects · most recent 11/15/2025
General Wiring
FiledStatusContractorScope
11/15/2025CompleteJONG HYUN KIM—
09/15/2025CompleteJ Y ELECTRIC INCGeneral Wiring
07/25/2022CompleteW 8 ELECTRIC CORP—
07/25/2022CompleteW 8 ELECTRIC CORP—
05/09/2022CompleteW 8 ELECTRIC CORPGeneral Wiring
07/17/2020CompleteKJK ELECTRIC INC—
08/15/2018CompleteTOP SHELF ELECTRIC CORP—
03/08/2018CompleteROBIN ELECTRICAL CO., INC—
1 project · most recent 05/07/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
05/07/2026Signed-offWELLDONE INSPECTIONS INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/13/2026Pass-Final Sign Permit InspectionPassView ↗
01/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/30/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
05/22/2026Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
05/22/2026Fire-Resistance Rated ConstructionQIUFAN JIANGprogress
05/22/2026Energy Code Compliance InspectionsQIUFAN JIANGprogress
05/22/2026Lighting controlsQIUFAN JIANGenergy_progress
05/22/2026MeteringQIUFAN JIANGenergy_progress
05/22/2026Interior lighting powerQIUFAN JIANGenergy_progress
05/06/2026MeteringQIUFAN JIANGenergy_progress
05/06/2026Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
05/06/2026Energy Code Compliance InspectionsQIUFAN JIANGprogress
05/06/2026Fire-Resistance Rated ConstructionQIUFAN JIANGprogress
05/06/2026Lighting controlsQIUFAN JIANGenergy_progress
05/06/2026Interior lighting powerQIUFAN JIANGenergy_progress
12/11/2025FinalQIUFAN JIANGprogress
12/11/2025Energy Code Compliance InspectionsQIUFAN JIANGprogress
12/11/2025Tenant Protection Plan ComplianceQIUFAN JIANGspecial
12/11/2025Mechanical SystemsQIUFAN JIANGspecial
12/11/2025Duct leakage testing, insulation and designQIUFAN JIANGenergy_progress
12/11/2025HVAC-R and service water heating equipmentQIUFAN JIANGenergy_progress
12/11/2025Maintenance informationQIUFAN JIANGenergy_progress
12/11/2025HVAC-R and service water heating system controlsQIUFAN JIANGenergy_progress
12/11/2025Shutoff dampersQIUFAN JIANGenergy_progress
12/11/2025HVAC-R and service water piping design and insulationQIUFAN JIANGenergy_progress
12/01/2025HVAC-R and service water heating equipmentQIUFAN JIANGenergy_progress
12/01/2025HVAC-R and service water heating system controlsQIUFAN JIANGenergy_progress
12/01/2025Maintenance informationQIUFAN JIANGenergy_progress
Latest 25 of 47.
▾Documents — 243 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/02/2026B00071239-I1Request digital key ↗
09/02/2026B00071239-P1Request digital key ↗
08/19/2026B01325867-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits49
▸BISWORK PERMIT APPLICATION34
07/21/2021321505260Open ↗
07/21/2021321505260Open ↗
07/14/2021340674103Open ↗
Showing 3 of 34 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
04/10/2023322160852Open ↗
10/12/2022321505260Open ↗
09/27/2022321505260Open ↗
Showing 3 of 13 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/12/2017340502370Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/15/2022321505260Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING EXHIBIT I: CERTIFICATION2
04/18/2023322160852Open ↗
06/12/2017321505260Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01239699-P1Open ↗
08/13/2026B01239699-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/18/2023322160852Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/18/2023322160852Open ↗
▸BISVERIFY TAX LOT1
02/15/2023321505260Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/12/2017321505260Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/20/2022321505260Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/12/2017321505260Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026B01239699-S1Open ↗
09/23/2026B01239699-S2Open ↗
09/23/2026B01239699-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026B00071239-I1Open ↗
09/02/2026B00071239-P1Open ↗
08/19/2026B01325867-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B01239699-S2Open ↗
09/23/2026B01239699-S1Open ↗
09/23/2026B01239699-S3Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
01/18/2018321505260Open ↗
01/18/2018321505260Open ↗
06/12/2017321505260Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
05/03/2019340674103Open ↗
05/12/2017340502370Open ↗
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING5
10/12/2022321505260Open ↗
09/02/2022321505260Open ↗
07/21/2021321505260Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
12/01/2023321505260Open ↗
04/12/2023321505260Open ↗
03/08/2023321505260Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
12/01/2023321505260Open ↗
04/12/2023321505260Open ↗
03/08/2023321505260Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/28/2017321505260Open ↗
01/05/2017321505260Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
10/20/2022321505260Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
10/20/2022321505260Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/20/2022321505260Open ↗
▸BISSPRINKLER SYSTEMS1
06/16/2022340674103Open ↗
▸BISFIRE ALARM TEST1
10/20/2022321505260Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/20/2022321505260Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/20/2022321505260Open ↗
▸BISSIGN HANGER CERTIFICATE1
02/19/2021321505260Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/17/2026B01239699-P4Open ↗
08/13/2026B01239699-P1Open ↗
08/13/2026B01239699-I1Open ↗
▸BISSTREET TREE CHECKLIST2
06/12/2017321505260Open ↗
05/12/2017340502370Open ↗
▸BISSTREET TREE SIGNOFF1
10/21/2022321505260Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
06/12/2017321505260Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/05/2019340502370Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/19/2018321505260Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/17/2026B01239699-I1Open ↗
08/17/2026B01239699-P3Open ↗
08/17/2026B01239699-P2Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
05/23/2019340674103Open ↗
01/18/2018321505260Open ↗
06/12/2017321505260Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/27/2023321505260Open ↗
02/27/2023321505260Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/18/2018321505260Open ↗
01/05/2017321505260Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/27/2023321505260Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/08/2023321505260Open ↗
03/08/2023321505260Open ↗
02/27/2023321505260Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/09/2023321505260Open ↗
01/18/2018321505260Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
05/03/2019340674103Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/12/2017321505260Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/18/2018321505260Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
06/12/2017321505260Open ↗
▸BISHYDRO FLOW TEST LETTER1
05/03/2019340674103Open ↗
▸Approvals, Objections & Sign-offs20
▸BISSUPERSEDING LETTER7
07/21/2021321505260Open ↗
02/26/2021321505260Open ↗
02/24/2021321505260Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
02/17/2021321505260Open ↗
02/17/2021321505260Open ↗
01/27/2021321505260Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
06/12/2017321505260Open ↗
05/03/2017321505260Open ↗
04/28/2017321505260Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
01/05/2017321505260Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
10/21/2022321505260Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/23/2022340674103Open ↗
▸Cost, Insurance & Ownership21
▸BISPROJECT-SPECIFIC GL INSURANCE8
07/21/2021321505260Open ↗
06/04/2021321505260Open ↗
06/01/2021321505260Open ↗
Showing 3 of 8 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
06/01/2021321505260Open ↗
01/27/2021321505260Open ↗
11/18/2020321505260Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE4
02/19/2021321505260Open ↗
02/17/2021321505260Open ↗
01/27/2021321505260Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT2
06/12/2017321505260Open ↗
01/05/2017321505260Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
02/27/2023321505260Open ↗
09/22/2022340674103Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION9
03/09/2023321505260Open ↗
10/17/2022321505260Open ↗
09/29/2022321505260Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM7
06/01/2021321505260Open ↗
05/06/2021321505260Open ↗
05/06/2021321505260Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
04/10/2023322160852Open ↗
04/27/2017321505260Open ↗
01/05/2017321505260Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
05/03/2019340674103Open ↗
05/12/2017340502370Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification3
08/17/2026B01239699-I1Open ↗
08/17/2026B01239699-P4Open ↗
08/17/2026B01239699-P1Open ↗
▸BISPLOT DIAGRAM2
04/17/2023322160852Open ↗
01/05/2017321505260Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
03/06/2023321505260Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/17/2023322160852Open ↗
▸BISSITE CONNECTION:DEP1
06/16/2017321505260Open ↗
▸DOB NOWFinal Survey1
08/17/2026B01239699-I1Open ↗