← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
832 57TH STREET
BROOKLYN · BIN 3140175
💬 Discuss this project
1920Year Built
5Stories
RMBuilding Class
R6Zoning
7,433 sfGross Floor Area
9Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 832 Brooklyn Building · 2,500 sf lot · 2.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarUnity Care Medical19p · 1 filing · 20 docs
BasementUnity Care Medical11p · 1 filing · 20 docs
Sub-BasementUnity Care Medical14p · 1 filing · 20 docs
Site & exteriorErect illuminated sign14p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
832 Brooklyn Building1703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Xiao Engineering805/07/2026
Youn Design112/07/2025
Asif Jamil, RA109/11/2018
Mohammad Ahead, PE108/24/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio403/21/2026
Anne Building403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rock Group NYScaffold807/08/2026
Top Build ContractorsGeneral Contractor107/08/2026
Welldone InspectionsGeneral Contractor104/09/2026
Neptune Signs & AwningsSign hanger107/08/2026
American Standard P&H CororpPlumbing107/08/2026
Case PlumbingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Welldone Inspection8628805/07/2026
Building Lifecycle
All (141)Filed (11)Permit Issued (9)Signed Off (6)Violation (48)Inspection (7)Objection (30)Special Inspection (30)
05/28/2026
Signed off — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-I1
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
05/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
QIUFAN JIANG
05/22/2026
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
05/22/2026
Special inspection requirement — Lighting controls
QIUFAN JIANG
05/22/2026
Special inspection requirement — Metering
QIUFAN JIANG
05/22/2026
Special inspection requirement — Interior lighting power
QIUFAN JIANG
05/07/2026
Filed — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-P4
05/06/2026
Special inspection requirement — Metering
QIUFAN JIANG
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
05/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
QIUFAN JIANG
05/06/2026
Special inspection requirement — Lighting controls
QIUFAN JIANG
05/06/2026
Special inspection requirement — Interior lighting power
QIUFAN JIANG
05/01/2026
Violation issued (HPD, closed)
A
03/30/2026
Signed off — Alteration
B01325867-I1
03/13/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
02/20/2026
Permit issued — Sign
B01325867-I1-SG
01/20/2026
Signed off — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-S1
01/20/2026
Signed off — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-S2
01/20/2026
Signed off — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-S3
01/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/11/2025
Special inspection requirement — Final
QIUFAN JIANG
12/11/2025
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
QIUFAN JIANG
12/11/2025
Special inspection requirement — Mechanical Systems
QIUFAN JIANG
12/11/2025
Special inspection requirement — Duct leakage testing, insulation and design
QIUFAN JIANG
12/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
QIUFAN JIANG
12/11/2025
Special inspection requirement — Maintenance information
QIUFAN JIANG
12/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
QIUFAN JIANG
12/11/2025
Special inspection requirement — Shutoff dampers
QIUFAN JIANG
12/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QIUFAN JIANG
12/07/2025
Filed — Alteration
B01325867-I1
12/02/2025
Filed — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-P3
12/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
QIUFAN JIANG
12/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
QIUFAN JIANG
12/01/2025
Special inspection requirement — Maintenance information
QIUFAN JIANG
12/01/2025
Special inspection requirement — Duct leakage testing, insulation and design
QIUFAN JIANG
12/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/01/2025
Special inspection requirement — Mechanical Systems
QIUFAN JIANG
12/01/2025
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
12/01/2025
Special inspection requirement — Final
QIUFAN JIANG
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection resolved — Addressed
11/13/2025
Objection raised — Admin
11/13/2025
Objection raised — Scope
11/04/2025
Filed — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-P1
11/04/2025
Filed — Alteration CO
INSTALL NEW DUCT FOR AIR DISTRIBUTON ON EXISTING AC UNITS ATBASEMENT LEVEL:INSTALL TWO SPLIT HEAT PUMP UNITS AT CELLAR LEVEL FOR SUPPLEMENTAL COOLING/HEATING:NO CHANGE TO OTHER EXISTING BUILDING SYSTEMS SUCH AS VENTILATION SYSTEM, TOILET EXHAUST SYSTEM.
B01239699-P2
10/31/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/22/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/22/2025
Permit issued — Mechanical Systems
B01239699-S2-MS
09/17/2025
Permit issued — Sprinklers
B01239699-S3-EW-SP
09/15/2025
Permit issued — Plumbing
B01239699-S1-PL
09/10/2025
Permit issued — General Construction
B01239699-I1-GC
09/04/2025
Objection resolved — Addressed
08/27/2025
Objection resolved — Addressed
08/27/2025
Objection resolved — Addressed
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNeptune Signs & Awnings02/20/2026
DOB NOWMechanical SystemsSigned-offWelldone Inspections09/22/2025
DOB NOWSprinklersSigned-offS & L Plumbing09/17/2025
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp09/15/2025
DOB NOWGeneral ConstructionPermit IssuedTop Build Contractors09/10/2025
DOB NOWSidewalk ShedSigned-offRock Group NY10/06/2022
DOB NOWSidewalk ShedSigned-offRock Group NY08/18/2021
DOB NOWSidewalk ShedSigned-offRock Group NY12/20/2018
DOB NOWSidewalk ShedSigned-offRock Group NY08/24/2018
BISPLISSUEDVMC Plumbing & Heating06/10/2022
BIS—ISSUEDEmprise Construction07/19/2021
BIS—ISSUEDEmprise Construction07/19/2021
BISPLISSUEDVMC Plumbing & Heating07/13/2021
BIS—ISSUEDEmprise Construction06/03/2021
BISEQISSUEDEmprise Construction05/27/2021
BISEQISSUEDEmprise Construction02/16/2021
BISPLISSUEDVMC Plumbing & Heating02/11/2021
BIS—ISSUEDEmprise Construction01/22/2021
BISEQISSUEDMaster Works Contractor I05/10/2019
BIS—ISSUEDMaster Works Contractor I05/10/2019
BIS—ISSUEDMaster Works Contractor I05/10/2019
BISPLISSUEDFlytiger P & H05/08/2019
BIS—ISSUEDMaster Works Contractor I07/24/2018
BIS—ISSUEDMaster Works Contractor I07/24/2018
BISEQISSUEDMaster Works Contractor I07/24/2018
BISPLISSUEDFlytiger P & H02/06/2018
BIS—ISSUEDD Z Image01/18/2018
BISEQISSUEDD Z Image01/18/2018
BIS—ISSUEDD Z Image01/18/2018
1 project · most recent 05/07/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2026Signed-offWelldone InspectionsHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree LIV09HP230V1R32AH 9,000 BTU · Fan Coil Indoor ×10
4LIV18HP230V1AH 17,600 BTU · Fan Coil Indoor ×4
4LIV18HP230V1AO 17,600 BTU · Condensing Unit ×4
LIV07HP230V1R32AH 7,000 BTU · Fan Coil Indoor ×4
MUL24HP230V1R32A0 24,000 BTU · Condensing Unit ×2
MUL36HP230V1R32A0 36,000 BTU · Condensing Unit ×2
4LIV18HP230VIA0 36,700 BTU · Condensing Unit ×2
4LIV18HP230VIAH 36,700 BTU · Fan Coil Indoor ×2
Mitsubishi Electric MSZ-GX36NL 33,800 BTU · Fan Coil Indoor ×2
MUZ-GX36NL 33,800 BTU · Condensing Unit ×2
Ventilation
Mitsubishi Electric TLGHF0300RVX02A 250 CFM · Vrf Indoor ×2
1 project · most recent 05/07/2026
Sprinkler System
FiledStatusContractorScope
05/07/2026Signed-offCase PlumbingSprinkler System
1 project · most recent 05/07/2026
Water/Sanitary
FiledStatusContractorScope
05/07/2026Signed-offAmerican Standard P&HWater/Sanitary
8 projects · most recent 11/15/2025
General Wiring
FiledStatusContractorScope
11/15/2025CompleteJong Hyun Kim—
09/15/2025CompleteJ Y ElectricGeneral Wiring
07/25/2022CompleteW 8 Electric—
07/25/2022CompleteW 8 Electric—
05/09/2022CompleteW 8 ElectricGeneral Wiring
07/17/2020CompleteKJK Electric—
08/15/2018CompleteTop Shelf Electric—
03/08/2018CompleteRobin Electrical Co—
1 project · most recent 05/07/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
05/07/2026Signed-offWelldone InspectionsTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/13/2026Pass-Final Sign Permit InspectionPassView ↗
01/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
05/22/2026Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
05/22/2026Fire-Resistance Rated ConstructionQIUFAN JIANGprogress
05/22/2026Energy Code Compliance InspectionsQIUFAN JIANGprogress
05/22/2026Lighting controlsQIUFAN JIANGenergy_progress
05/22/2026MeteringQIUFAN JIANGenergy_progress
05/22/2026Interior lighting powerQIUFAN JIANGenergy_progress
05/06/2026MeteringQIUFAN JIANGenergy_progress
05/06/2026Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
05/06/2026Energy Code Compliance InspectionsQIUFAN JIANGprogress
05/06/2026Fire-Resistance Rated ConstructionQIUFAN JIANGprogress
05/06/2026Lighting controlsQIUFAN JIANGenergy_progress
05/06/2026Interior lighting powerQIUFAN JIANGenergy_progress
12/11/2025FinalQIUFAN JIANGprogress
12/11/2025Energy Code Compliance InspectionsQIUFAN JIANGprogress
12/11/2025Tenant Protection Plan ComplianceQIUFAN JIANGspecial
12/11/2025Mechanical SystemsQIUFAN JIANGspecial
12/11/2025Duct leakage testing, insulation and designQIUFAN JIANGenergy_progress
12/11/2025HVAC-R and service water heating equipmentQIUFAN JIANGenergy_progress
12/11/2025Maintenance informationQIUFAN JIANGenergy_progress
12/11/2025HVAC-R and service water heating system controlsQIUFAN JIANGenergy_progress
12/11/2025Shutoff dampersQIUFAN JIANGenergy_progress
12/11/2025HVAC-R and service water piping design and insulationQIUFAN JIANGenergy_progress
12/01/2025HVAC-R and service water heating equipmentQIUFAN JIANGenergy_progress
12/01/2025HVAC-R and service water heating system controlsQIUFAN JIANGenergy_progress
12/01/2025Maintenance informationQIUFAN JIANGenergy_progress
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Unity Care MedicalMedical / HealthcareCellar, Sub-basement, Basement
Project B01239699 Alteration CO · LOC Issued · 07/02/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 243 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/02/2026B00071239-I1Request digital key ↗
09/02/2026B00071239-P1Request digital key ↗
08/19/2026B01325867-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits49
▸BISWORK PERMIT APPLICATION34
07/21/2021321505260Open ↗
07/21/2021321505260Open ↗
07/14/2021340674103Open ↗
Showing 3 of 34 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
04/10/2023322160852Open ↗
10/12/2022321505260Open ↗
09/27/2022321505260Open ↗
Showing 3 of 13 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/12/2017340502370Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/15/2022321505260Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING EXHIBIT I: CERTIFICATION2
04/18/2023322160852Open ↗
06/12/2017321505260Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01239699-P1Open ↗
08/13/2026B01239699-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/18/2023322160852Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/18/2023322160852Open ↗
▸BISVERIFY TAX LOT1
02/15/2023321505260Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/12/2017321505260Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/20/2022321505260Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/12/2017321505260Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026B01239699-S1Open ↗
09/23/2026B01239699-S2Open ↗
09/23/2026B01239699-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026B00071239-I1Open ↗
09/02/2026B00071239-P1Open ↗
08/19/2026B01325867-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B01239699-S2Open ↗
09/23/2026B01239699-S1Open ↗
09/23/2026B01239699-S3Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
01/18/2018321505260Open ↗
01/18/2018321505260Open ↗
06/12/2017321505260Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
05/03/2019340674103Open ↗
05/12/2017340502370Open ↗
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING5
10/12/2022321505260Open ↗
09/02/2022321505260Open ↗
07/21/2021321505260Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
12/01/2023321505260Open ↗
04/12/2023321505260Open ↗
03/08/2023321505260Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
12/01/2023321505260Open ↗
04/12/2023321505260Open ↗
03/08/2023321505260Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/28/2017321505260Open ↗
01/05/2017321505260Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
10/20/2022321505260Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
10/20/2022321505260Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/20/2022321505260Open ↗
▸BISSPRINKLER SYSTEMS1
06/16/2022340674103Open ↗
▸BISFIRE ALARM TEST1
10/20/2022321505260Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/20/2022321505260Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/20/2022321505260Open ↗
▸BISSIGN HANGER CERTIFICATE1
02/19/2021321505260Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/17/2026B01239699-P4Open ↗
08/13/2026B01239699-P1Open ↗
08/13/2026B01239699-I1Open ↗
▸BISSTREET TREE CHECKLIST2
06/12/2017321505260Open ↗
05/12/2017340502370Open ↗
▸BISSTREET TREE SIGNOFF1
10/21/2022321505260Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
06/12/2017321505260Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/05/2019340502370Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/19/2018321505260Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/17/2026B01239699-I1Open ↗
08/17/2026B01239699-P3Open ↗
08/17/2026B01239699-P2Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
05/23/2019340674103Open ↗
01/18/2018321505260Open ↗
06/12/2017321505260Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/27/2023321505260Open ↗
02/27/2023321505260Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/18/2018321505260Open ↗
01/05/2017321505260Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/27/2023321505260Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/08/2023321505260Open ↗
03/08/2023321505260Open ↗
02/27/2023321505260Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/09/2023321505260Open ↗
01/18/2018321505260Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
05/03/2019340674103Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/12/2017321505260Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/18/2018321505260Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
06/12/2017321505260Open ↗
▸BISHYDRO FLOW TEST LETTER1
05/03/2019340674103Open ↗
▸Approvals, Objections & Sign-offs20
▸BISSUPERSEDING LETTER7
07/21/2021321505260Open ↗
02/26/2021321505260Open ↗
02/24/2021321505260Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
02/17/2021321505260Open ↗
02/17/2021321505260Open ↗
01/27/2021321505260Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
06/12/2017321505260Open ↗
05/03/2017321505260Open ↗
04/28/2017321505260Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
01/05/2017321505260Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
10/21/2022321505260Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/23/2022340674103Open ↗
▸Cost, Insurance & Ownership21
▸BISPROJECT-SPECIFIC GL INSURANCE8
07/21/2021321505260Open ↗
06/04/2021321505260Open ↗
06/01/2021321505260Open ↗
Showing 3 of 8 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
06/01/2021321505260Open ↗
01/27/2021321505260Open ↗
11/18/2020321505260Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE4
02/19/2021321505260Open ↗
02/17/2021321505260Open ↗
01/27/2021321505260Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT2
06/12/2017321505260Open ↗
01/05/2017321505260Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
02/27/2023321505260Open ↗
09/22/2022340674103Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION9
03/09/2023321505260Open ↗
10/17/2022321505260Open ↗
09/29/2022321505260Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM7
06/01/2021321505260Open ↗
05/06/2021321505260Open ↗
05/06/2021321505260Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
04/10/2023322160852Open ↗
04/27/2017321505260Open ↗
01/05/2017321505260Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
05/03/2019340674103Open ↗
05/12/2017340502370Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification3
08/17/2026B01239699-I1Open ↗
08/17/2026B01239699-P4Open ↗
08/17/2026B01239699-P1Open ↗
▸BISPLOT DIAGRAM2
04/17/2023322160852Open ↗
01/05/2017321505260Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
03/06/2023321505260Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/17/2023322160852Open ↗
▸BISSITE CONNECTION:DEP1
06/16/2017321505260Open ↗
▸DOB NOWFinal Survey1
08/17/2026B01239699-I1Open ↗