← Back
Condo, residential unit in walk-up building
834 MYRTLE AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3378417
💬 Discuss this project
2003Year Built
4Stories
R2Building Class
R7DZoning
58,244 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized24 Open Violations ▸FDNY Report ↗
Condo, residential unit in walk-up building · 23,700 sf lot · 2.46 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 13p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EIGHT AVE BUILDERS103/22/2026
THE NEW YORK VIEW INC.103/22/2026
MYRTLE PALACE LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CNS INSPECTION SERVICES LLC206/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EZFILINGNYCORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YL CONSTRUCTION ADVISERGeneral Contractor303/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818206/06/2024
Building Lifecycle
All (66)Filed (2)Permit Issued (2)Signed Off (1)Violation (8)Objection (44)Special Inspection (9)
04/14/2026
Signed off — Alteration
HEREWITH FILING AN INTERIOR PLUMBING RENOVATION AT FLOORS 003 AND 004. FOR THE CAP AND REMOVAL OF PLUMBING FIXTURES AT FLOORS 003 AND 004. FILING FOR THE INSTALLATION OF NEW PLUMBING FIXTURES AT FLOORS 003 AND 004. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
B01060593-I1
11/15/2024
Permit issued — General Construction
B01060593-I1-GC
11/06/2024
Permit issued — Plumbing
B01060593-S1-PL
10/01/2024
Objection resolved — Addressed
10/01/2024
Objection resolved — Addressed
09/17/2024
Objection raised — Other
08/27/2024
Objection resolved — Addressed
08/06/2024
Objection resolved — Addressed
08/06/2024
Objection resolved — Addressed
08/05/2024
Objection raised — Other
08/05/2024
Objection raised — Other
08/05/2024
Objection raised — Other
07/25/2024
Objection raised — Zoning
07/24/2024
Objection raised — Other
07/24/2024
Objection resolved — Addressed
07/23/2024
Objection resolved — Addressed
07/18/2024
Objection raised — Other
07/18/2024
Objection resolved — Addressed
07/18/2024
Objection raised — Other
07/10/2024
Objection resolved — Addressed
07/10/2024
Objection resolved — Addressed
07/10/2024
Objection resolved — Addressed
07/10/2024
Objection resolved — Addressed
07/08/2024
Objection raised — Zoning
07/08/2024
Objection raised — Other
07/08/2024
Objection raised — Other
07/08/2024
Objection raised — Zoning
06/28/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/26/2024
Objection resolved — Addressed
06/12/2024
Objection raised — Zoning
06/12/2024
Objection raised — Other
06/12/2024
Objection raised — Zoning
06/12/2024
Objection raised — Other
06/12/2024
Objection raised — Admin
06/12/2024
Objection raised — Zoning
06/12/2024
Objection raised — Other
06/12/2024
Objection raised — Other
06/12/2024
Objection raised — Other
06/12/2024
Objection raised — Zoning
06/06/2024
Filed — Alteration
HEREWITH FILING AN INTERIOR PLUMBING RENOVATION AT FLOORS 003 AND 004. FOR THE CAP AND REMOVAL OF PLUMBING FIXTURES AT FLOORS 003 AND 004. FILING FOR THE INSTALLATION OF NEW PLUMBING FIXTURES AT FLOORS 003 AND 004. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
B01060593-I1
06/06/2024
Filed — Alteration
HEREWITH FILING AN INTERIOR PLUMBING RENOVATION AT FLOORS 003 AND 004. FOR THE CAP AND REMOVAL OF PLUMBING FIXTURES AT FLOORS 003 AND 004. FILING FOR THE INSTALLATION OF NEW PLUMBING FIXTURES AT FLOORS 003 AND 004. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
B01060593-S1
06/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NORMAN LOK
06/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NORMAN LOK
06/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
06/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
06/05/2024
Special inspection requirement — Lighting controls
NORMAN LOK
06/05/2024
Special inspection requirement — Energy Code Compliance Inspections
NORMAN LOK
06/05/2024
Special inspection requirement — Interior lighting power
NORMAN LOK
06/05/2024
Special inspection requirement — Lighting in dwelling units
NORMAN LOK
06/03/2024
Special inspection requirement — Final
ADITYA DESAI
04/22/2024
Violation issued (ECB, closed)
Construction
11/17/2023
Violation issued (HPD, closed)
I
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offYL CONSTRUCTION ADVISER11/15/2024
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.11/06/2024
BISEQISSUEDEIGHTH AVENUE BUILDERS01/20/2004
BIS—ISSUEDEIGHTH AVENUE BUILDERS01/20/2004
BIS—ISSUEDEIGHTH AVENUE BUILDERS06/02/2003
BISPLISSUEDS & J INDUSTRIAL CORP05/21/2003
BIS—ISSUEDEIGHTH AVENUE BUILDERS02/11/2003
BISEQISSUEDEIGHTH AVENUE BUILDERS02/04/2003
BISEQISSUEDEIGHTH AVENUE BUILDERS08/23/2002
BIS—ISSUEDEIGHTH AVENUE BUILDERS08/23/2002
1 project · most recent 06/06/2024
Water/Sanitary
FiledStatusContractorScope
06/06/2024Permit IssuedAMERICAN STANDARD P&H CORWater/Sanitary
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/05/2024Fire-Resistant Penetrations and JointsNORMAN LOKspecial
06/05/2024Fire-Resistant Penetrations and JointsNORMAN LOKspecial
06/05/2024Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
06/05/2024Tenant Protection Plan ComplianceNORMAN LOKspecial
06/05/2024Lighting controlsNORMAN LOKenergy_progress
06/05/2024Energy Code Compliance InspectionsNORMAN LOKprogress
06/05/2024Interior lighting powerNORMAN LOKenergy_progress
06/05/2024Lighting in dwelling unitsNORMAN LOKenergy_progress
06/03/2024FinalADITYA DESAIprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026B01060593-S1Request digital key ↗
08/15/2026B01060593-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026B01060593-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/15/2026B01060593-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01060593-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026B01060593-I1Open ↗
08/30/2026B01060593-I1Open ↗
08/30/2026B01060593-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026B01060593-S1Open ↗
08/24/2026B01060593-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026B01060593-I1Open ↗
08/26/2026B01060593-S1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/15/2026B01060593-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026B01060593-I1Open ↗
▸DOB NOWPlot Diagram1
08/15/2026B01060593-I1Open ↗