← Back
Predominantly retail with other uses
84 UNIVERSITY PLACE
MANHATTAN · BIN 1009285
💬 Discuss this project
1900Year Built
7Stories
K4Building Class
C1-7Zoning
14,897 sfGross Floor Area
1Units
4 Open Violations 3 unresolved · 1 paperwork only ▸FISP: SAFE
Predominantly retail with other uses · Owner of record: VILLA 84 LLC · 2,302 sf lot · 6.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction45p · 1 filing · 20 docs
Floor 7Under Construction44p · 1 filing · 20 docs
Floor 6Under Construction44p · 1 filing · 20 docs
Floor 5Under Construction45p · 1 filing · 20 docs
Floor 4Under Construction43p · 1 filing · 20 docs
Floor 3Under Construction44p · 1 filing · 20 docs
Floor 2Under Construction43p · 1 filing · 20 docs
Floor 1Under Construction46p · 1 filing · 20 docs
CellarUnder Construction13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GD CAPITAL3307/08/2026
SMART CONSULTING NY204/09/2026
METHOD GENERAL CONTRACTOR404/09/2026
RELIABLE ENTERPRISES1604/09/2026
SMART CONSULTING NY.CORP203/22/2026
VILLA 84 LLC103/22/2026
GENERAL CONTRACTOR METHOD1203/22/2026
M S PROPERTY ASSOC803/22/2026
M&PROPERTIES ASSOCIATES103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/09/2024$11.2M—Private party → VILLA 84 LLC$755/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADAM KUSHNER804/10/2026
ABRAHAM TAWIL1002/26/2026
MCHENERY TESTING LAB104/23/2025
FENG LI104/11/2025
MJE PROFESSIONAL SERVICES401/02/2025
ROBERT SIQECA410/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS2103/21/2026
SNR EXPEDITING DESIGN803/21/2026
SIERRA SAFETY CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METHOD GENERAL CONTRACTORGeneral Contractor1507/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor604/09/2026
F.S. WORKS INCFire Protection407/08/2026
MEIR HERMANElectrical303/21/2026
P.H. WORKS INCPlumbing207/08/2026
STEWART, DUDLEYElectrical103/21/2026
BOLT BUILDS INCGeneral Contractor104/09/2026
RICHARD NEUElectrical103/22/2026
MAYO, EUGENEElectrical103/21/2026
ASHLEY, ANTHONYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAL H CHUN ENGINEER PC19721704/10/2026
STRUCTURAL ENGINEERING &5699410/10/2024
Building Lifecycle
All (167)Filed (28)Permit Issued (22)Signed Off (9)Facade (FISP) (12)Violation (37)Inspection (17)Objection (12)Special Inspection (30)
09/16/2026
Special inspection requirement — Lighting in dwelling units
JAMES CHUN
09/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
09/16/2026
Special inspection requirement — Metering
JAMES CHUN
09/16/2026
Special inspection requirement — Insulation placement and R values
JAMES CHUN
09/16/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
09/16/2026
Special inspection requirement — Interior lighting power
JAMES CHUN
09/16/2026
Special inspection requirement — Fenestration air leakage
JAMES CHUN
09/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES CHUN
09/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
09/16/2026
Special inspection requirement — Air barrier - visual inspection
JAMES CHUN
09/16/2026
Special inspection requirement — Lighting controls
JAMES CHUN
09/15/2026
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01208531-I1
09/08/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/13/2026
Signed off — Alteration
1ST FLOOR COMMERCIAL TENANT (MIMI'S FROYO) BUILDOUT INCLUDING NEW FLOOR & WALL FINISHES ALONG WITH NEW COUNTERTOP, DECORATIVE DROP CEILING, & NON-LOAD BEARING PARTITIONS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUCTION WITH GC #M01038433-I1
M01269863-I1
08/11/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01124696-I1
08/11/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01124683-I1
05/18/2026
Signed off — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01038433-I1 AS PER THE DRAWINGS FILED HEREIN.
M01038433-S1
04/10/2026
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01038433-I1 AS PER THE DRAWINGS FILED HEREIN.
M01038433-A9
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
04/10/2026
Special inspection requirement — Metering
JAMES CHUN
04/10/2026
Special inspection requirement — Insulation placement and R values
JAMES CHUN
04/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
04/10/2026
Special inspection requirement — Lighting in dwelling units
JAMES CHUN
04/10/2026
Special inspection requirement — Lighting controls
JAMES CHUN
04/10/2026
Special inspection requirement — Air barrier - visual inspection
JAMES CHUN
04/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES CHUN
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
04/10/2026
Special inspection requirement — Fenestration air leakage
JAMES CHUN
04/10/2026
Special inspection requirement — Interior lighting power
JAMES CHUN
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/07/2026
Objection raised — Scope
02/26/2026
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01038433-I1 AS PER THE DRAWINGS FILED HEREIN.
M01038433-A8
02/23/2026
Objection raised — Scope
01/29/2026
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01038433-I1 AS PER THE DRAWINGS FILED HEREIN.
M01038433-A7
01/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES CHUN
01/22/2026
Special inspection requirement — Lighting in dwelling units
JAMES CHUN
01/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
01/22/2026
Special inspection requirement — Air barrier - visual inspection
JAMES CHUN
01/22/2026
Special inspection requirement — Metering
JAMES CHUN
01/22/2026
Special inspection requirement — Insulation placement and R values
JAMES CHUN
01/22/2026
Special inspection requirement — Fenestration air leakage
JAMES CHUN
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
01/21/2026
Signed off — Alteration
M01207674-I1
01/05/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
01/05/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
01/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/22/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/19/2025
Violation issued (ECB, open)
Construction
12/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/08/2025
Filed — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01038433-I1 AS PER THE DRAWINGS FILED HEREIN.
M01038433-A5
12/04/2025
Signed off — Alteration CO
INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH GC #M01038433-I1 AS PER THE DRAWINGS FILED HEREIN.
M01038433-S2
11/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2025
Permit issued — General Construction
M01269863-I1-GC
11/14/2025
Permit issued — General Construction
M01038433-I1-GC
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBOLT BUILDS INC11/18/2025
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR11/14/2025
DOB NOWMechanical SystemsSigned-offMETHOD GENERAL CONTRACTOR10/30/2025
DOB NOWSprinklersSigned-offF.S. WORKS INC10/22/2025
DOB NOWSprinklersSigned-offF.S. WORKS INC10/22/2025
DOB NOWPlumbingSigned-offP.H. WORKS INC10/22/2025
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC09/10/2025
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC09/10/2025
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR08/01/2025
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR05/02/2025
DOB NOWSupported ScaffoldSigned-offMETHOD GENERAL CONTRACTOR04/25/2025
DOB NOWProtection and Mechanical MethodsSigned-offMETHOD GENERAL CONTRACTOR04/22/2025
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR04/09/2025
DOB NOWGeneral ConstructionPermit IssuedMETHOD GENERAL CONTRACTOR10/27/2024
DOB NOWStructuralSigned-offMETHOD GENERAL CONTRACTOR10/25/2024
DOB NOWMechanical SystemsSigned-offMETHOD GENERAL CONTRACTOR10/25/2024
DOB NOWStandpipeSigned-offF.S. WORKS INC10/22/2024
DOB NOWPlumbingSigned-offP.H. WORKS INC10/22/2024
DOB NOWStandpipeSigned-offF.S. WORKS INC10/22/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC10/10/2024
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC10/10/2024
DOB NOWFoundationSigned-offMETHOD GENERAL CONTRACTOR10/08/2024
BISOTISSUEDEMPAC CONTRACTING CORP10/03/2019
BISEQISSUEDHI TECH BUILDING INC03/11/2005
BISPLISSUEDCALRAY SALES & SERVICES08/02/1990
BISBLISSUEDCALRAY SALES & SERVICES08/02/1990
1 project · most recent 04/10/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/10/2026Signed-offP.H. WORKS INCGas, Storm, Water/Sanitary
6 projects · most recent 09/22/2026
Boiler Controls General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedJOSEPH WEINSTEIN ELECTRIC1 meters
09/22/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICBoiler Controls
03/11/2026CompleteJAM ELECTRICAL CORP—
01/28/2026CompleteMETHOD ELECTRIC LLCGeneral Wiring
10/29/2024CompleteMETHOD ELECTRIC LLC—
10/10/2024Permit IssuedRICHARD NEU—
3 projects · most recent 04/23/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/23/2025Signed-offMETHOD GENERAL CONTRACTORScaffold
01/02/2025Signed-offRELIABLE ENTERPRISES INCSidewalk Shed
01/02/2025Signed-offRELIABLE ENTERPRISES INCScaffold
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
09/08/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/05/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
01/05/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/22/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/09/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/21/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/12/2025Pass-Final PL - UndergroundPassView ↗
02/10/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
09/16/2026Fenestration air leakageJAMES CHUNenergy_progress
09/16/2026Lighting controlsJAMES CHUNenergy_progress
09/16/2026Interior lighting powerJAMES CHUNenergy_progress
09/16/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
09/16/2026Energy Code Compliance InspectionsJAMES CHUNprogress
09/16/2026Fire-Resistance Rated ConstructionJAMES CHUNprogress
09/16/2026Lighting in dwelling unitsJAMES CHUNenergy_progress
09/16/2026Insulation placement and R valuesJAMES CHUNenergy_progress
09/16/2026Air barrier - visual inspectionJAMES CHUNenergy_progress
09/16/2026MeteringJAMES CHUNenergy_progress
09/16/2026Fenestration and door U-factor and product ratingsJAMES CHUNenergy_progress
04/10/2026Energy Code Compliance InspectionsJAMES CHUNprogress
04/10/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
04/10/2026Fire-Resistance Rated ConstructionJAMES CHUNprogress
04/10/2026MeteringJAMES CHUNenergy_progress
04/10/2026Insulation placement and R valuesJAMES CHUNenergy_progress
04/10/2026Interior lighting powerJAMES CHUNenergy_progress
04/10/2026Lighting controlsJAMES CHUNenergy_progress
04/10/2026Air barrier - visual inspectionJAMES CHUNenergy_progress
04/10/2026Fenestration air leakageJAMES CHUNenergy_progress
04/10/2026Fenestration and door U-factor and product ratingsJAMES CHUNenergy_progress
04/10/2026Lighting in dwelling unitsJAMES CHUNenergy_progress
01/22/2026Insulation placement and R valuesJAMES CHUNenergy_progress
01/22/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
01/22/2026Energy Code Compliance InspectionsJAMES CHUNprogress
Latest 25 of 92.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
08/25/2026M01124696-I1Request digital key ↗
08/25/2026M01124696-P1Request digital key ↗
08/25/2026M01124683-P1Request digital key ↗
Showing 3 of 28 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
11/26/2020122933665Open ↗
10/02/2019140871279Open ↗
10/28/2016122933665Open ↗
▸BISWORK PERMIT APPLICATION1
10/02/2019140871279Open ↗
▸Seals & Professional Certifications64
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/25/2026M01124683-I1Open ↗
08/25/2026M01124683-P1Open ↗
08/24/2026M01038433-P6Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/27/2026M01038433-I1Open ↗
09/27/2026M01038433-I1Open ↗
09/01/2026M01038433-P9Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/27/2026M01038433-I1Open ↗
09/01/2026M01038433-P9Open ↗
08/30/2026M01038433-S6Open ↗
Showing 3 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/02/2019140871279Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/02/2019140871279Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/02/2019140871279Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/29/2019140871279Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWFDNY: Letter of No Objection3
08/13/2026M01038433-A2Open ↗
08/13/2026M01038433-S3Open ↗
08/13/2026M01038433-P3Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/08/2023122933665Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist7
08/13/2026M01038433-A7Open ↗
08/13/2026M01038433-A9Open ↗
08/13/2026M01038433-P6Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/24/2026M01038433-P6Open ↗
08/24/2026M01038433-P5Open ↗
08/24/2026M01038433-P4Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/02/2019140871279Open ↗
10/28/2016122933665Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026M01038433-S6Open ↗
▸Energy Compliance4
▸BISAS-BUILT ENERGY ANALYSIS1
10/29/2019140871279Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/02/2019140871279Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/29/2019140871279Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/02/2019140871279Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/02/2019140871279Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/29/2019140871279Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/29/2019140871279Open ↗
10/02/2019140871279Open ↗
10/28/2016122933665Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM1
10/29/2019140871279Open ↗
▸BISEFILING COVER SHEET1
10/28/2016122933665Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/02/2019140871279Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification7
08/24/2026M01038433-P7Open ↗
08/24/2026M01038433-P6Open ↗
08/24/2026M01038433-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWFinal Survey1
08/13/2026M01038433-I1Open ↗