← Back
Two stories - detached, small or mid-size
8408 7 AVENUE
BROOKLYN · BIN 3152904
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R4BZoning
1,934 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,227 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureOther
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/07/2022$1.6M—Private party → Private party$812/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANTHONY BONSIGNORE, RA310/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IOR DESIGN & CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIMOS PAPADIMASElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAJ ENGINEERING PLLC930310/17/2023
Building Lifecycle
All (33)Filed (3)Special Inspection (30)
10/17/2023
Filed — Alteration CO
REMOVE 1 STORY PORTIONS AT REAR OF BUILDING, ERECT NEW ONE STORY & CELLAR ADDITION AT REAR, INCLUDING INTERIOR RENOVATION WORK ON THE 1ST FLOOR, NEW ROOF DECK ABOVE ADDITION TOGETHER WITH DUCTLESS HVAC UNITS AND PLUMBING WORK ALL AS PER PLANS FILED.
B00878784-P1
10/16/2023
Special inspection requirement — Concrete - Cast-In-Place
Joseph Jabour
10/16/2023
Special inspection requirement — Maintenance information
Joseph Jabour
10/16/2023
Special inspection requirement — Protection of exposed foundation insulation
Joseph Jabour
10/16/2023
Special inspection requirement — Insulation placement and R values
Joseph Jabour
10/16/2023
Special inspection requirement — Interior lighting power
Joseph Jabour
10/16/2023
Special inspection requirement — Fenestration air leakage
Joseph Jabour
10/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Jabour
10/16/2023
Special inspection requirement — Fenestration areas
Joseph Jabour
10/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Jabour
10/16/2023
Special inspection requirement — Air barrier - visual inspection
Joseph Jabour
10/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Jabour
10/16/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Joseph Jabour
10/16/2023
Special inspection requirement — Footing and Foundation
Joseph Jabour
10/16/2023
Special inspection requirement — Final
Joseph Jabour
10/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
10/16/2023
Special inspection requirement — Vertical Masonry Foundation Elements
Joseph Jabour
10/16/2023
Special inspection requirement — Subgrade Inspections
Joseph Jabour
10/16/2023
Special inspection requirement — Structural Steel - Details
Joseph Jabour
10/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Jabour
10/16/2023
Special inspection requirement — Structural Cold-Formed Steel
Joseph Jabour
10/16/2023
Special inspection requirement — Mechanical Systems
Joseph Jabour
10/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
10/16/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Joseph Jabour
06/06/2023
Filed — Alteration CO
REMOVE 1 STORY PORTIONS AT REAR OF BUILDING, ERECT NEW ONE STORY & CELLAR ADDITION AT REAR, INCLUDING INTERIOR RENOVATION WORK ON THE 1ST FLOOR, NEW ROOF DECK ABOVE ADDITION TOGETHER WITH DUCTLESS HVAC UNITS AND PLUMBING WORK ALL AS PER PLANS FILED.
B00878784-I1
06/06/2023
Filed — Alteration
B00882096-I1
05/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
05/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
05/30/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Joseph Jabour
05/30/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
05/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
05/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
05/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nothing on file for this building.
1 project · most recent 10/17/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/17/2023——Heating and Air Conditioning Systems
Heat / Cool
Gree LIVV36HP230VIA11 3 tons · Condensing Unit ×2
LIVV30HP230VIA11 2 tons ×2
1 project · most recent 10/17/2023
Steel Concrete
FiledStatusContractorScope
10/17/2023——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
10/16/2023Concrete - Cast-In-PlaceJoseph Jabourspecial
10/16/2023Maintenance informationJoseph Jabourenergy_progress
10/16/2023Protection of exposed foundation insulationJoseph Jabourenergy_progress
10/16/2023Insulation placement and R valuesJoseph Jabourenergy_progress
10/16/2023Interior lighting powerJoseph Jabourenergy_progress
10/16/2023Fenestration air leakageJoseph Jabourenergy_progress
10/16/2023HVAC-R and service water heating system controlsJoseph Jabourenergy_progress
10/16/2023Fenestration areasJoseph Jabourenergy_progress
10/16/2023HVAC-R and service water piping design and insulationJoseph Jabourenergy_progress
10/16/2023Air barrier - visual inspectionJoseph Jabourenergy_progress
10/16/2023HVAC-R and service water heating equipmentJoseph Jabourenergy_progress
10/16/2023Fenestration and door U-factor and product ratingsJoseph Jabourenergy_progress
10/16/2023Footing and FoundationJoseph Jabourprogress
10/16/2023FinalJoseph Jabourprogress
10/16/2023Energy Code Compliance InspectionsJoseph Jabourprogress
10/16/2023Vertical Masonry Foundation ElementsJoseph Jabourspecial
10/16/2023Subgrade InspectionsJoseph Jabourspecial
10/16/2023Structural Steel - DetailsJoseph Jabourspecial
10/16/2023Structural Stability – Alterations of existing buildingsJoseph Jabourspecial
10/16/2023Structural Cold-Formed SteelJoseph Jabourspecial
10/16/2023Mechanical SystemsJoseph Jabourspecial
10/16/2023Fire-Resistant Penetrations and JointsJoseph Jabourspecial
10/16/2023Excavations - Sheeting, Shoring, and BracingJoseph Jabourspecial
05/30/2023HVAC-R and service water heating system controls—energy_progress
05/30/2023Fire-Resistant Penetrations and JointsJoseph Jabourspecial
Latest 25 of 54.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026B00882096-I1Request digital key ↗
08/27/2026B00878784-P1Request digital key ↗
08/27/2026B00878784-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/30/2010320196248Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00878784-I1Open ↗
08/13/2026B00878784-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00878784-P1Open ↗
08/13/2026B00878784-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00878784-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00878784-P1Open ↗
09/01/2026B00878784-P1Open ↗
08/25/2026B00878784-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026B00882096-I1Open ↗
08/27/2026B00878784-I1Open ↗
08/27/2026B00878784-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00878784-P1Open ↗
08/25/2026B00878784-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/30/2010320196248Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00878784-I1Open ↗
08/13/2026B00878784-P1Open ↗
▸BISSCHEDULE B - PLUMBING1
07/30/2010320196248Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00878784-P1Open ↗
08/13/2026B00878784-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B00882096-I1Open ↗
08/27/2026B00878784-I1Open ↗
08/27/2026B00878784-P1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/30/2010320196248Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00878784-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
07/30/2010320196248Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/30/2010320196248Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/30/2010320196248Open ↗
▸Other Documents10
▸DOB NOWPlot Diagram2
08/13/2026B00878784-P1Open ↗
08/13/2026B00878784-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/27/2026B00878784-I1Open ↗
08/27/2026B00878784-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00878784-I1Open ↗
08/13/2026B00878784-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00878784-I1Open ↗
08/13/2026B00878784-P1Open ↗
▸BISPLOT DIAGRAM1
07/30/2010320196248Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00878784-I1Open ↗