General warehouse
845 EAST 136TH STREET
BRONX · Mott Haven-Port Morris · BIN 2004000
💬 Discuss this project
1929Year Built
2Stories
E1Building Class
M3-1Zoning
88,000 sfGross Floor Area
3Units
LL97 Covered0 Active ViolationsFDNY Report ↗
General warehouse · Owner of record: Bsrep III 845 E 136th Street · 55,773 sf lot · 1.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBrookfield Warehouse35p · 6 filings · 20 docs
Floor 2Brookfield WarehouseUnder Construction38p · 6 filings · 20 docs
Floor 1Brookfield PropertiesUnder Construction74p · 11 filings · 20 docs
MezzanineBrookfield Warehouse24p · 5 filings · 20 docs
CellarBrookfield Properties4p · 1 filing · 14 docs
BasementBrookfield Warehouse Landlord ImprovementsUnder Construction2p · 1 filing · 9 docs
Sub-BasementBrookfield Warehouse Landlord ImprovementsUnder Construction1p · 1 filing · 9 docs
Site & exteriorLba LogisticsUnder Construction4p · 3 filings · 8 docs
Filed — no permit issuedBsrep Iii 845 E 136th Street LLC7p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brookfield Properties807/08/2026
Tuck It Away Associates403/21/2026
Lba Realty310/04/2026
Bsrep III 845 E 136th Street103/22/2026
LRM Construction & Maintenance103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2025$21.7M—BSREP III 845 E 136TH STREET LLC → 845 E 136TH ST, LLC$247/sf building
12/08/2020$27.9M—845 EAST 136 PROPERTY LLC → BSREP III 845 E 136TH STREET LLC$317/sf building
08/17/2017$19.1M—— → —$217/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Studio Huji209/17/2026
Emtec Consulting Engineers306/09/2026
TDM Consulting Engineering106/08/2026
Alexander Badalamenti106/04/2026
Highpoint Associates202/25/2026
Design Management Group105/08/2025
Capitol Fire Sprinkler Co104/08/2025
CHA1003/27/2025
Cha Consulting1011/14/2023
Cha Companies203/29/2023
Rosa Consulting Engineers110/13/2021
Cha Architecture208/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning4803/21/2026
RPO203/21/2026
DVA Advisors103/21/2026
Capitol Fire Sprinkler203/21/2026
Highpoint Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&K PartnersGeneral Contractor1707/08/2026
Tri-State DismantlingScaffold407/08/2026
Signs CadSign hanger209/19/2026
Capitol Fire Sprinkler CoFire Protection207/08/2026
Luxury Residential ManagementGeneral Contractor204/09/2026
L&K PartnersScaffold203/21/2026
Rico ElectricElectrical103/21/2026
Raptor MechanicalPlumbing107/08/2026
Hirsch BarryElectrical103/21/2026
Power Source Electric of NYElectrical103/22/2026
Titan Electrical & Elev ContractingElectrical103/22/2026
M&G Plumbing and HeatingPlumbing107/08/2026
P & D MechanicalFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Age Engineering6695406/09/2026
Alan Margolin & Associates423205/08/2025
W. Allen Engineering664104/08/2025
Bureau Veritas Na69021403/27/2025
Building Lifecycle
All (170)Filed (35)Permit Issued (24)Signed Off (11)Violation (46)Inspection (6)Objection (18)Special Inspection (30)
09/18/2026
Permit issued — Sign
X01427689-I1-SG
09/18/2026
Permit issued — Sign
X01427694-I1-SG
09/17/2026
Filed — Alteration
SIGN TAG AS NON ILLUMINATED F.C.O. ADDRESS NUMBER /LOGO (SIGN 3) @ WALNUT AVENUE ELEVATION FOR 845 WITH LOGO
X01427694-I1
09/17/2026
Filed — Alteration
SIGN TAG AS NON ILLUMINATED F.C.O. ADDRESS NUMBER /LOGO (SIGN 2) @ WALNUT AVENUE ELEVATION FOR 845 WITH LOGO
X01427689-I1
08/20/2026
Objection resolved — Resolved
08/11/2026
Objection raised — Other
07/29/2026
Objection resolved — Resolved
07/16/2026
Objection resolved — Resolved
07/16/2026
Objection resolved — Resolved
07/16/2026
Objection resolved — Resolved
07/15/2026
Objection resolved — Open
07/09/2026
Objection resolved — Addressed
07/08/2026
Special inspection requirement — Final
Ryan Hung
07/08/2026
Special inspection requirement — Final
Ryan Hung
07/01/2026
Objection raised — Other
07/01/2026
Objection raised — Scope
07/01/2026
Objection raised — Cost
07/01/2026
Objection raised — Structural
06/25/2026
Objection raised — Other
06/24/2026
Objection raised — Cost
06/09/2026
Filed — Alteration
ILING HEREWITH ALT 2 APPLICATION FOR INTERIOR ALTERATIONS TO A EXISTINGMASONRY & STEEL FRAMED WAREHOUSE BUILDING. PARTIAL REMOVAL OF EXISTINGMEZZANINE LEVEL. CHANGE IN EGRESS PATH AS PER SUBMITTED EGRESS PLANS.
X01400472-S3
06/08/2026
Filed — Alteration
ILING HEREWITH ALT 2 APPLICATION FOR INTERIOR ALTERATIONS TO A EXISTINGMASONRY & STEEL FRAMED WAREHOUSE BUILDING. PARTIAL REMOVAL OF EXISTINGMEZZANINE LEVEL. CHANGE IN EGRESS PATH AS PER SUBMITTED EGRESS PLANS.
X01400472-S2
06/08/2026
Filed — Alteration
ILING HEREWITH ALT 2 APPLICATION FOR INTERIOR ALTERATIONS TO A EXISTINGMASONRY & STEEL FRAMED WAREHOUSE BUILDING. PARTIAL REMOVAL OF EXISTINGMEZZANINE LEVEL. CHANGE IN EGRESS PATH AS PER SUBMITTED EGRESS PLANS.
X01400472-S1
06/08/2026
Filed — Alteration
ILING HEREWITH ALT 2 APPLICATION FOR INTERIOR ALTERATIONS TO A EXISTINGMASONRY & STEEL FRAMED WAREHOUSE BUILDING. PARTIAL REMOVAL OF EXISTINGMEZZANINE LEVEL. CHANGE IN EGRESS PATH AS PER SUBMITTED EGRESS PLANS.
X01400472-S4
06/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
ROBESPIERRE ARISTILDE
06/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
ROBESPIERRE ARISTILDE
06/05/2026
Special inspection requirement — Maintenance information
ROBESPIERRE ARISTILDE
06/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ROBESPIERRE ARISTILDE
06/04/2026
Filed — Alteration
ILING HEREWITH ALT 2 APPLICATION FOR INTERIOR ALTERATIONS TO A EXISTINGMASONRY & STEEL FRAMED WAREHOUSE BUILDING. PARTIAL REMOVAL OF EXISTINGMEZZANINE LEVEL. CHANGE IN EGRESS PATH AS PER SUBMITTED EGRESS PLANS.
X01400472-I1
06/01/2026
Special inspection requirement — Post-installed Anchors
ROBESPIERRE ARISTILDE
06/01/2026
Special inspection requirement — Post-installed Anchors
ROBESPIERRE ARISTILDE
05/29/2026
Special inspection requirement — Masonry
ROBESPIERRE ARISTILDE
05/29/2026
Special inspection requirement — Structural Cold-Formed Steel
ROBESPIERRE ARISTILDE
05/29/2026
Special inspection requirement — Structural Steel - High Strength Bolting
ROBESPIERRE ARISTILDE
05/29/2026
Special inspection requirement — Structural Steel - Welding
ROBESPIERRE ARISTILDE
05/29/2026
Special inspection requirement — Concrete - Cast-In-Place
ROBESPIERRE ARISTILDE
05/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBESPIERRE ARISTILDE
05/28/2026
Special inspection requirement — Final
ROBESPIERRE ARISTILDE
05/28/2026
Special inspection requirement — Structural Steel - Details
ROBESPIERRE ARISTILDE
05/11/2026
Special inspection requirement — Final
ROBESPIERRE ARISTILDE
05/11/2026
Special inspection requirement — Sprinkler Systems
ROBESPIERRE ARISTILDE
05/11/2026
Special inspection requirement — Mechanical Systems
ROBESPIERRE ARISTILDE
05/11/2026
Special inspection requirement — Final
ROBESPIERRE ARISTILDE
04/07/2026
Objection resolved — Resolved
03/25/2026
Objection raised — Scope
03/25/2026
Objection raised — Zoning
03/25/2026
Objection resolved — Addressed
02/25/2026
Filed — Alteration CO
Replacement of door at 1st floor and correction Certificate of Occupancy to list missing Cellar and Roof levels and number of stories.
X01318391-I1
01/21/2026
Signed off — Alteration
X00712409-I1
12/10/2025
Signed off — Alteration
Modification to Existing Sprinkler System by replacing existing Booster Pump with new Booster Pump. No change in use, egress or occupancy.
X01174040-I1
11/19/2025
Signed off — Alteration
Modification to Existing Sprinkler System by replacing existing Booster Pump with new Booster Pump. No change in use, egress or occupancy.
X01174040-S2
11/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/17/2025
Signed off — Alteration
Modification to Existing Sprinkler System by replacing existing Booster Pump with new Booster Pump. No change in use, egress or occupancy.
X01174040-S1
10/31/2025
Permit issued — Sprinklers
X00573687-I1-EW-SP
10/16/2025
Signed off — Alteration
Structural application related to minor renovations to existing first and mezzanine floors per drawings filed herewith: No change to use, egress or occupancy.
X00538664-I1
09/30/2025
Signed off — Alteration
Interior renovation and facade repointing
X00571170-I1
07/17/2025
Signed off — Alteration
Proposed Side Walk Shed
X00567081-I1
07/16/2025
Signed off — Alteration
Application filed for structural work as per plans no change to use egress or occupancy
X00571178-I1
06/17/2025
Signed off — Alteration
Proposed SUBGRADE/SUBBASE PREPARATION SHALLOW FOUNDATION CONSTRUCTION, REINFORCED CONCRETE CONSTRUCTION & STEEL CONSTRUCTION WORK RELATED TO APPLICATION X00571170.
X00571191-I1
Latest 60 of 170 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedSigns Cad09/18/2026
DOB NOWSignPermit IssuedSigns Cad09/18/2026
DOB NOWSprinklersPermit IssuedCapitol Fire Sprinkler Co10/31/2025
DOB NOWGeneral ConstructionSigned-offLuxury Residential Management05/20/2025
DOB NOWMechanical SystemsSigned-offLuxury Residential Management05/20/2025
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co04/08/2025
DOB NOWPlumbingSigned-offM&G Plumbing and Heating07/13/2023
DOB NOWFoundationSigned-offL&K Partners06/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offTri-State Dismantling01/31/2023
DOB NOWStructuralSigned-offL&K Partners12/15/2022
DOB NOWStructuralSigned-offL&K Partners10/19/2022
DOB NOWMechanical SystemsSigned-offL&K Partners04/11/2022
DOB NOWProtection and Mechanical MethodsSigned-offTri-State Dismantling01/31/2022
DOB NOWGeneral ConstructionPermit IssuedL&K Partners12/14/2021
DOB NOWStructuralSigned-offL&K Partners12/14/2021
DOB NOWSprinklersPermit IssuedP & D Mechanical11/04/2021
DOB NOWStructuralSigned-offL&K Partners11/03/2021
DOB NOWProtection and Mechanical MethodsSigned-offTri-State Dismantling10/14/2021
DOB NOWGeneral ConstructionPermit IssuedL&K Partners08/30/2021
DOB NOWStructuralSigned-offL&K Partners08/30/2021
DOB NOWSidewalk ShedSigned-offL&K Partners08/06/2021
DOB NOWGeneral ConstructionPermit IssuedL&K Partners07/22/2021
DOB NOWStructuralSigned-offL&K Partners07/21/2021
DOB NOWPlumbingSigned-offRaptor Mechanical07/20/2021
BISOTISSUEDOnforce Solar06/19/2014
BISOTISSUEDOnforce Solar01/17/2014
BIS—ISSUEDElrene Realty07/28/2009
BISPLISSUEDForte Express P & H05/01/2009
BIS—ISSUEDJE Activities01/23/2007
BISCCISSUEDAvante Building Group12/29/2006
BISCCISSUEDAvante Building Group12/28/2006
BISPLISSUEDJ-J Plumbing09/07/2005
BISMHISSUEDJ.E. Activities07/11/2005
BIS—ISSUEDJE Activities01/25/2005
BISSPISSUEDCapitol Fire SPKL Co07/23/2004
BIS—ISSUEDJE Activities04/28/2004
BISEQISSUEDTFN Development Corp/Dba East Co04/22/2003
BIS—ISSUEDTFN Developement Corp/Dba East04/22/2003
BISSPISSUEDCapitol Fire SPKL Co12/05/2002
BIS—ISSUEDTFN Development Corp/Dba East Co07/24/2001
+ 1 more permits on file
1 project · most recent 06/09/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/09/2026——Ventilation Systems
Ventilation
N/A NA 100 CFM · Exhaust Fan ×1
1 project · most recent 06/09/2026
FiledStatusContractorScope
06/09/2026——217 heads
1 project · most recent 06/09/2026
Water/Sanitary
FiledStatusContractorScope
06/09/2026——Water/Sanitary
3 projects · most recent 08/19/2025
General Wiring
FiledStatusContractorScope
08/19/2025CompleteTitan Electrical & Elev ContractingGeneral Wiring
10/07/2021CompletePower Source Electric of NYGeneral Wiring
05/23/2018CompleteMeo Electric2 meters, 1 new_meters
1 project · most recent 06/09/2026
Steel Masonry
FiledStatusContractorScope
06/09/2026——Steel, Masonry
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
07/08/2026FinalRyan Hungprogress
07/08/2026FinalRyan Hungprogress
06/05/2026Maintenance informationROBESPIERRE ARISTILDEenergy_progress
06/05/2026HVAC-R and service water heating equipmentROBESPIERRE ARISTILDEenergy_progress
06/05/2026HVAC-R and service water piping design and insulationROBESPIERRE ARISTILDEenergy_progress
06/05/2026HVAC-R and service water heating system controlsROBESPIERRE ARISTILDEenergy_progress
06/01/2026Post-installed AnchorsROBESPIERRE ARISTILDEspecial
06/01/2026Post-installed AnchorsROBESPIERRE ARISTILDEspecial
05/29/2026Structural Steel - High Strength BoltingROBESPIERRE ARISTILDEspecial
05/29/2026Structural Steel - WeldingROBESPIERRE ARISTILDEspecial
05/29/2026MasonryROBESPIERRE ARISTILDEspecial
05/29/2026Structural Stability – Alterations of existing buildingsROBESPIERRE ARISTILDEspecial
05/29/2026Structural Cold-Formed SteelROBESPIERRE ARISTILDEspecial
05/29/2026Concrete - Cast-In-PlaceROBESPIERRE ARISTILDEspecial
05/28/2026Structural Steel - DetailsROBESPIERRE ARISTILDEspecial
05/28/2026FinalROBESPIERRE ARISTILDEprogress
05/11/2026FinalROBESPIERRE ARISTILDEprogress
05/11/2026Sprinkler SystemsROBESPIERRE ARISTILDEspecial
05/11/2026FinalROBESPIERRE ARISTILDEprogress
05/11/2026Mechanical SystemsROBESPIERRE ARISTILDEspecial
05/01/2025Shutoff dampersYoung Suhenergy_progress
05/01/2025Mastic and Intumescent Fire-resistant CoatingsYoung Suhspecial
05/01/2025MeteringYoung Suhenergy_progress
05/01/2025HVAC-R and service water heating system controlsYoung Suhenergy_progress
05/01/2025HVAC-R and service water piping design and insulationYoung Suhenergy_progress
Latest 25 of 88.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Lba LogisticsIndustrial / Warehouse—
Project X01427689 Alteration · Permit Entire · 09/17/2026
Project X01427694 Alteration · Permit Entire · 09/17/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 159 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch37
10/13/2026X01427689-I1Request digital key ↗
10/04/2026X01427694-I1Request digital key ↗
08/26/2026X00538642-I1Request digital key ↗
Showing 3 of 37 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
11/16/2025220339051Open ↗
10/24/2013220339051Open ↗
09/06/2013220211045Open ↗
▸BISWORK PERMIT APPLICATION2
06/25/2014220211045Open ↗
01/18/2014220211045Open ↗
▸Seals & Professional Certifications78
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/19/2026X01427694-I1Open ↗
09/19/2026X01427689-I1Open ↗
08/26/2026X00538642-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/01/2026X00573687-P1Open ↗
09/01/2026X00538664-P1Open ↗
09/01/2026X00538664-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026X01400472-I1Open ↗
09/01/2026X00538664-P1Open ↗
08/30/2026X01174040-S1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/18/2014220211045Open ↗
10/24/2013220339051Open ↗
09/09/2013220211045Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/24/2013220339051Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/24/2013220339051Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026X01318391-I1Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/17/2026X01318391-I1Open ↗
08/16/2026X01400472-S1Open ↗
08/16/2026X01400472-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/26/2026X00538642-I1Open ↗
08/25/2026X00571178-I1Open ↗
08/25/2026X00571170-I1Open ↗
Showing 3 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/09/2013220211045Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/24/2013220339051Open ↗
▸Energy Compliance9
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00571170-I1Open ↗
08/13/2026X00538609-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/20/2015220211045Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/20/2015220211045Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/06/2013220211045Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
01/20/2015220211045Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/18/2014220211045Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/09/2013220211045Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00712409-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/20/2015220211045Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/20/2015220211045Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
01/20/2015220211045Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/20/2015220211045Open ↗
10/24/2013220339051Open ↗
09/09/2013220211045Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
12/15/2014220211045Open ↗
▸BISEFILING COVER SHEET1
10/24/2013220339051Open ↗
▸BISeFiling Job Application Cover Sheet1
09/06/2013220211045Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/17/2026X01318391-I1Open ↗