← Back
Miscellaneous educational facility
Independence High School
850 10 AVENUE · BIN 1026841
💬 Discuss this project
1924Year Built
6Stories
W9Building Class
C6-2Zoning
243,459 sfGross Floor Area
4Units
LL97 Covered4 Open Violations 3 unresolved · 1 paperwork only ▸
Miscellaneous educational facility · Owner of record: 444 56TH STREET REALTY CO. LLC · 60,300 sf lot · 4.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction46p · 9 filings · 20 docs
Bulkhead5p · 1 filing · 7 docs
Floor 6Under Construction22p · 4 filings · 20 docs
Floor 52p · 3 filings · 20 docs
Floor 43p · 4 filings · 20 docs
Floor 32p · 3 filings · 20 docs
Floor 24p · 5 filings · 20 docs
Floor 11p · 2 filings · 9 docs
Cellar7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ENTERPRISE ASSET MANAGEMENT10609/17/2026
444 56TH STREET REALTY1503/22/2026
DEPARTMENT OF EDUCATION1103/22/2026
DOE HS FOR ENVIRON ST040403/22/2026
444 REALTY COMPANY LLC CU203/22/2026
DOE 040403/22/2026
444 REALTY3503/22/2026
DOE HS FOR ENVIRONMEN040203/22/2026
D.O.E. M 834 0103/22/2026
M834 D.O.E. 040103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES1603/21/2026
JMV ASSOCIATES403/21/2026
KERI ENGINEERING P C403/21/2026
RA1203/21/2026
AE DESIGN SOLUTION603/21/2026
RIZZO GROUP303/21/2026
GOSHOW ARCHITECTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVENUE CONTRACTING INCGeneral Contractor2107/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor603/21/2026
EBRO DIQUE GROUP, LLCGeneral Contractor603/21/2026
HAYDEN BLDG. MAINTENANCEGeneral Contractor403/21/2026
ACS SYSTEM ASSOCIATES INC.General Contractor207/04/2026
UNGARO, DOMENICOElectrical103/21/2026
NIKHI CONTRACTING CORPGeneral Contractor109/15/2026
SIGNATURE CONSTRUCTION GROUPGeneral Contractor108/08/2026
FORSYTHE PLBG & HTG CORPPlumbing109/17/2026
CLIFTON WALDRONElectrical103/21/2026
VARSITY PLBG AND HTG INCPlumbing107/08/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
JOSEPH BRAMANElectrical103/21/2026
LASER ELEC'L CONSTR'G INCElectrical103/22/2026
THOMAS STONEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 INSPECTIONS INC14711007/01/2026
SHAHRISH SHUVO ENGINEERIN8524106/03/2026
KS ENGINEERS, P.C.7715303/03/2025
MERRITT ENGINEERING CONSU460204/22/2024
AK CONSULTING SERVICES, I6198207/07/2023
JPC LOGISTICS DBA JPCL EN351210/21/2022
ASE ENGINEERING PLLC5785105/21/2021
Building Lifecycle
All (210)Filed (43)Permit Issued (27)Signed Off (3)Violation (60)Inspection (2)Objection (45)Special Inspection (30)
09/16/2026
Permit issued — Plumbing
M01181419-S2-PL
09/14/2026
Permit issued — General Construction
M01181419-I1-GC
08/07/2026
Permit issued — General Construction
M01431597-I1-GC
08/05/2026
Filed — Alteration
Propose to remove and install interior non-bearing partitions as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
M01431597-I1
07/28/2026
Signed off — Alteration
Remove/replace (6) existing roof drains and provide new. Replace existing storm leaders up to and including the first elbow; (6) existing vent stack to be protected during demo; cut and remove concrete at ceiling to install storm leader piping.
M00708773-S3
07/15/2026
Special inspection requirement — Final
JAMES VASSALOTTI
07/02/2026
Special inspection requirement — Final
JACOB HAAS
07/02/2026
Special inspection requirement — Mechanical Systems
JACOB HAAS
07/01/2026
Filed — Alteration
Remove/replace (6) existing roof drains and provide new. Replace existing storm leaders up to and including the first elbow; (6) existing vent stack to be protected during demo; cut and remove concrete at ceiling to install storm leader piping.
M00708773-P7
06/03/2026
Filed — Alteration
FACADE AND ROOF REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01400852-I1
05/29/2026
Objection resolved — Resolved
05/27/2026
Objection resolved — Resolved
05/22/2026
Objection raised — Scope
05/22/2026
Objection raised — Admin
05/12/2026
Special inspection requirement — Masonry
Shahrish Shuvo
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
05/12/2026
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
05/12/2026
Special inspection requirement — Final
Domingo Diaz
05/05/2026
Filed — Alteration
INSTALLATION OF NEW SUPPLEMENTAL COOLING SPLIT AC SYSTEM IN TWO CLASSROOMS ON 4TH FLOOR.
M01389650-I1
04/30/2026
Permit issued — Mechanical Systems
M00708773-S3-MS
04/30/2026
Special inspection requirement — Mechanical Systems
JACOB HAAS
04/30/2026
Special inspection requirement — Final
JACOB HAAS
04/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/20/2026
Special inspection requirement — Post-installed Anchors
04/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/20/2026
Special inspection requirement — Mechanical Systems
04/20/2026
Special inspection requirement — Energy Code Compliance Inspections
04/20/2026
Special inspection requirement — Maintenance information
04/20/2026
Special inspection requirement — Final
04/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/16/2026
Violation issued (ECB, open)
Construction
03/12/2026
Filed — Alteration
Remove/replace (6) existing roof drains and provide new. Replace existing storm leaders up to and including the first elbow; (6) existing vent stack to be protected during demo; cut and remove concrete at ceiling to install storm leader piping.
M00708773-P6
08/29/2025
Violation issued (ECB, closed)
Construction
08/29/2025
Violation issued (ECB, closed)
Construction
08/29/2025
Violation issued (ECB, closed)
Construction
04/30/2025
Permit issued — Mechanical Systems
M00708773-S3-MS
04/23/2025
Objection resolved — Addressed
04/09/2025
Objection resolved — Addressed
04/07/2025
Objection resolved — Addressed
04/07/2025
Objection resolved — Addressed
03/12/2025
Objection raised — Scope
03/11/2025
Objection raised — Scope
03/07/2025
Objection raised — Scope
03/07/2025
Objection raised — Fire_Protection
03/03/2025
Filed — Alteration
M834-High School for Environmental Studies: Interior conversion of an existing classroom with two closets to a culinary arts classroom with two storage rooms.
M01181419-I1
03/03/2025
Filed — Alteration
M834-High School for Environmental Studies: Interior conversion of an existing classroom with two closets to a culinary arts classroom with two storage rooms.
M01181419-S2
03/03/2025
Filed — Alteration
M834-High School for Environmental Studies: Interior conversion of an existing classroom with two closets to a culinary arts classroom with two storage rooms.
M01181419-S1
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LEOVIGILDO FONTANA
01/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/17/2024
Objection raised — Other
12/17/2024
Objection raised — Other
12/17/2024
Objection raised — Other
12/10/2024
Filed — Alteration
M834-High School for Environmental Studies: Interior conversion of an existing classroom with two closets to a culinary arts classroom with two storage rooms.
M01148861-S2
12/10/2024
Filed — Alteration
M834-High School for Environmental Studies: Interior conversion of an existing classroom with two closets to a culinary arts classroom with two storage rooms.
M01148861-S1
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/10/2024
Special inspection requirement — Post-installed Anchors
12/04/2024
Filed — Alteration
M834-High School for Environmental Studies: Interior conversion of an existing classroom with two closets to a culinary arts classroom with two storage rooms.
M01148861-I1
12/04/2024
Special inspection requirement — Final
Latest 60 of 210 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFORSYTHE PLBG & HTG CORP09/16/2026
DOB NOWGeneral ConstructionPermit IssuedNIKHI CONTRACTING CORP09/14/2026
DOB NOWGeneral ConstructionSigned-offSIGNATURE CONSTRUCTION GROUP08/07/2026
DOB NOWMechanical SystemsSigned-offACS SYSTEM ASSOCIATES INC.04/30/2026
DOB NOWMechanical SystemsSigned-offACS SYSTEM ASSOCIATES INC.04/30/2025
DOB NOWConstruction FencePermit IssuedAVENUE CONTRACTING INC06/28/2024
DOB NOWSidewalk ShedPermit IssuedAVENUE CONTRACTING INC02/20/2024
DOB NOWConstruction FencePermit IssuedAVENUE CONTRACTING INC01/28/2024
DOB NOWSupported ScaffoldPermit IssuedAVENUE CONTRACTING INC01/26/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedAVENUE CONTRACTING INC01/26/2024
DOB NOWGeneral ConstructionPermit IssuedAVENUE CONTRACTING INC01/11/2024
DOB NOWGeneral ConstructionSigned-offHAYDEN BLDG. MAINTENANCE08/04/2023
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC06/29/2023
DOB NOWGeneral ConstructionPermit IssuedAVENUE CONTRACTING INC03/07/2023
DOB NOWSupported ScaffoldPermit IssuedAVENUE CONTRACTING INC02/21/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedAVENUE CONTRACTING INC02/21/2023
DOB NOWConstruction FencePermit IssuedAVENUE CONTRACTING INC02/21/2023
DOB NOWSidewalk ShedPermit IssuedAVENUE CONTRACTING INC12/30/2022
DOB NOWSupported ScaffoldPermit IssuedAVENUE CONTRACTING INC12/30/2022
DOB NOWConstruction FencePermit IssuedAVENUE CONTRACTING INC12/30/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedAVENUE CONTRACTING INC12/29/2022
DOB NOWGeneral ConstructionSigned-offHAYDEN BLDG. MAINTENANCE08/05/2022
DOB NOWSupported ScaffoldPermit IssuedEBRO DIQUE GROUP, LLC06/03/2022
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC05/15/2021
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/20/2020
DOB NOWSupported ScaffoldPermit IssuedEBRO DIQUE GROUP, LLC01/21/2020
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/13/2019
BISOTISSUEDPOSITIVE ELEC ASSOC INC07/05/2023
BISOTISSUEDPOSITIVE ELEC ASSOC INC07/05/2023
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/26/2023
BISOTISSUEDPOSITIVE ELEC ASSOC INC07/14/2022
BISOTISSUEDPOSITIVE ELEC ASSOC INC07/14/2022
BISSPISSUEDEAGLE MECHANICAL INC07/07/2022
BISMHISSUEDACS SYSTEM ASSOCIATES INC.05/09/2022
BISSPISSUEDEAGLE MECHANICAL INC07/28/2021
BISOTISSUEDPOSITIVE ELEC ASSOC INC07/27/2021
BISOTISSUEDPOSITIVE ELEC ASSOC INC07/27/2021
BISOTISSUEDPOSITIVE ELEC ASSOC INC07/09/2021
BISOTISSUEDPOSITIVE ELEC ASSOC INC07/09/2021
BISOTISSUEDHAYDEN BLDG. MAINTENANCE06/29/2021
+ 37 more permits on file
7 projects · most recent 07/01/2026
Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/01/2026Signed-offACS SYSTEM ASSOCIATES INCVentilation Systems
Ventilation
Greenheck USF-33 9,250 CFM · Exhaust Fan ×2
USF-6 800 CFM · Kitchen Exhaust ×2
USF-06-5-B6-00-02-02 800 CFM · Kitchen Exhaust ×1
USF-30-S-86-00-02-02 9,250 CFM · Exhaust Fan ×1
05/05/2026——Air Conditioning Systems
Cooling
Lg ZRNU183SKSA 19,100 BTU · Vrf Indoor ×1
ZRNU243SKSA 24,200 BTU · Vrf Outdoor ×1
ZRUM036GSSO 36,000 BTU · Vrf Outdoor ×1
03/03/2025Permit IssuedNIKHI CONTRACTING CORPVentilation Systems
Ventilation
12/10/2024——Ventilation Systems
Ventilation
Greenheck USF-18-B6 3,300 CFM · Kitchen Exhaust ×2
10/21/2022——Air Conditioning Systems
Cooling
Mitsubishi Electric PKFY-P30NKMU-E2.TH 30,000 BTU · Vrf Indoor ×2
PKA-A30KA7 30,000 BTU · Vrf Indoor ×1
PUMY-P60NKMU3 5 tons · Vrf Outdoor ×1
PUZ-A30NHA7 2 tons · Condensing Unit ×1
09/29/2022——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PKA-24KA7 24,000 BTU · Fan Coil Indoor ×1
PUY-A24NHA7 24,000 BTU · Condensing Unit ×1
Heating
Bell & Gossett SU-125-2 2,135,500 BTU · Heat Exchanger ×2
Ventilation
Loren Cook XWD VDF 4,500 CFM · Exhaust Fan ×2
06/24/2022——Ventilation Systems
Ventilation
Loren Cook XWD VF 4,500 CFM · Exhaust Fan ×2
2 projects · most recent 10/21/2022
Sprinkler System
FiledStatusContractorScope
10/21/2022——2 heads
06/24/2022——Sprinkler System
4 projects · most recent 07/01/2026
Water/Sanitary Storm Gas Plumbing-Sprinkler
FiledStatusContractorScope
07/01/2026Permit IssuedVARSITY PLBG AND HTG INCStorm
03/03/2025Permit IssuedFORSYTHE PLBG & HTG CORPWater/Sanitary
12/10/2024——Water/Sanitary
06/24/2022——Gas, Plumbing-Sprinkler, Water/Sanitary
14 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedLABCO ELETRT CONTNG CORPGeneral Wiring
05/08/2026CompleteGEMINI ELECTRIC CO., INC.—
01/30/2026CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
06/28/2023CompleteGEMINI ELECTRIC CO., INC.—
05/30/2023Permit IssuedAMIN ELECTRICAL CORP—
11/14/2022Permit IssuedP.S. MARCATO ELEV. CO INC—
12/22/2021Permit IssuedP.S. MARCATO ELEV. CO INC—
02/19/2021CompleteCHARAN ELEC'L ENTERP'S IN—
04/28/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
11/15/2019Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
11/14/2019CompleteNASH ELECTRIC SERVICES IN—
11/28/2018Permit IssuedCENTENNIAL ELEVATOR INDUSGeneral Wiring
09/27/2018CompletePOSITIVE ELECT'L ASSOC.IN—
07/09/2018CompleteLASER ELEC'L CONSTR'G INCGeneral Wiring
4 projects · most recent 08/05/2026
Concrete Steel
FiledStatusContractorScope
08/05/2026Signed-offSIGNATURE CONSTRUCTION GR1 scope_items
10/21/2022——Concrete
06/24/2022——Steel, Concrete
05/21/2021——Steel
4 projects · most recent 07/07/2023
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
07/07/2023Permit IssuedAVENUE CONTRACTING INCFence
07/07/2023Permit IssuedAVENUE CONTRACTING INCScaffold
07/06/2023Permit IssuedAVENUE CONTRACTING INCSidewalk Shed
01/20/2020Permit IssuedEBRO DIQUE GROUP, LLCScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/07/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
07/15/2026FinalJAMES VASSALOTTIprogress
07/02/2026FinalJACOB HAASprogress
07/02/2026Mechanical SystemsJACOB HAASspecial
05/12/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
05/12/2026MasonryShahrish Shuvospecial
05/12/2026FinalDomingo Diazprogress
05/12/2026Insulation placement and R valuesShahrish Shuvoenergy_progress
04/30/2026FinalJACOB HAASprogress
04/30/2026Mechanical SystemsJACOB HAASspecial
04/20/2026Final—progress
04/20/2026Mechanical Systems—special
04/20/2026Post-installed Anchors—special
04/20/2026Energy Code Compliance Inspections—progress
04/20/2026HVAC-R and service water heating equipment—energy_progress
04/20/2026HVAC-R and service water piping design and insulation—energy_progress
04/20/2026HVAC-R and service water heating system controls—energy_progress
04/20/2026Maintenance information—energy_progress
04/20/2026Fire-Resistant Penetrations and Joints—special
02/26/2025Fire-Resistant Penetrations and JointsLEOVIGILDO FONTANAspecial
01/23/2025Fire-Resistant Penetrations and Joints—special
12/10/2024Fire-Resistant Penetrations and Joints—special
12/10/2024Fire-Resistant Penetrations and Joints—special
12/10/2024Post-installed Anchors—special
12/04/2024Mechanical Systems—special
12/04/2024Final—progress
Latest 25 of 92.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hs For Environmental StudiesEducation—
Project M08009506 Alteration · Approved · 09/29/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 432 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch42
09/03/2026M00507858-I1Request digital key ↗
09/03/2026M00630867-I1Request digital key ↗
09/02/2026M00746649-I1Request digital key ↗
Showing 3 of 42 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/14/2026M00159211-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00259016-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00293633-I1Request digital key ↗
▸Applications & Permits62
▸BISPLAN / WORK APPROVAL APPLICATION36
08/11/2021123785234Open ↗
07/28/2021123785234Open ↗
08/10/2020123667264Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION15
10/23/2019123785234Open ↗
08/31/2016122861661Open ↗
08/31/2016122861661Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit11
09/03/2026M00630867-I1Open ↗
08/16/2026M01431597-I1Open ↗
08/15/2026M00630867-P1Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications124
▸DOB NOWDPL-1: Design Professional Seal & Signature45
09/03/2026M00630867-I1Open ↗
09/03/2026M00630867-S1Open ↗
09/03/2026M00630867-P1Open ↗
Showing 3 of 45 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
10/11/2019123785234Open ↗
08/24/2018123433846Open ↗
07/13/2018123433846Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026M00259016-I1Open ↗
09/01/2026M00708773-S3Open ↗
09/01/2026M00708773-P7Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/01/2026M00708773-S3Open ↗
09/01/2026M00708773-P7Open ↗
08/28/2026M01181419-S2Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
10/11/2019123785234Open ↗
08/16/2016122861661Open ↗
04/15/2016122757329Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
10/11/2019123785234Open ↗
08/16/2016122861661Open ↗
04/15/2016122757329Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
08/24/2018123433846Open ↗
08/16/2016122861661Open ↗
04/15/2016122757329Open ↗
Showing 3 of 11 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
07/29/2022103649688Open ↗
07/29/2022104212335Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
07/31/2015121900826Open ↗
10/09/2014122029090Open ↗
▸BISSCHEDULE B - PLUMBING1
10/28/2014121900826Open ↗
▸BISEQUIPMENT USE PERMITS1
11/24/2017122757329Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/24/2017122757329Open ↗
▸Safety & Tenant Protection54
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist33
09/03/2026M00630867-I1Open ↗
09/02/2026M00731475-I1Open ↗
08/18/2026M00708773-P7Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWCertificate of No Harassment13
09/03/2026M00630867-I1Open ↗
09/02/2026M00731475-I1Open ↗
08/16/2026M01431597-I1Open ↗
Showing 3 of 13 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON6
08/16/2016122861661Open ↗
08/15/2016122863080Open ↗
04/19/2016122757329Open ↗
Showing 3 of 6 on file for this type
▸BISANTI-HARASSMENT CHECKLIST1
10/22/2019123785234Open ↗
▸BISSTREET TREE CHECKLIST1
07/13/2018123433846Open ↗
▸Environmental & Asbestos21
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
10/11/2019123785234Open ↗
05/17/2019123667264Open ↗
08/19/2016122861661Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026M00731475-I1Open ↗
08/16/2026M01431597-S1Open ↗
08/16/2026M01431597-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/18/2026M00708773-I1Open ↗
08/18/2026M00708773-S1Open ↗
08/18/2026M00708773-S3Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
10/11/2019123785234Open ↗
08/24/2018123433846Open ↗
11/29/2017122757329Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/23/2021123785234Open ↗
11/29/2017122757329Open ↗
03/02/2016122399234Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/01/2021123785234Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00723709-S2Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00731475-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/23/2021123785234Open ↗
07/28/2021123785234Open ↗
▸Approvals, Objections & Sign-offs35
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
09/03/2026M00630867-I1Open ↗
08/30/2026M08046235-I1Open ↗
08/30/2026M08046246-I1Open ↗
Showing 3 of 18 on file for this type
▸BISLANDMARKS APPROVAL6
07/07/2015122029090Open ↗
06/29/2015122399234Open ↗
05/06/2015122029090Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
09/01/2021123785234Open ↗
11/29/2017122757329Open ↗
11/14/2017122757329Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026M00708773-S3Open ↗
08/13/2026M00708773-I1Open ↗
08/13/2026M00731475-I1Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/10/2014121900826Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT17
08/23/2021123785234Open ↗
10/11/2019123785234Open ↗
05/17/2019123667264Open ↗
Showing 3 of 17 on file for this type
▸Filing & Intake Forms26
▸BISEFILING COVER SHEET14
10/11/2019123785234Open ↗
05/17/2019123667264Open ↗
08/24/2018123433846Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION7
01/20/2016121900826Open ↗
07/15/2015122029090Open ↗
07/07/2015122029090Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM5
04/23/2019123433846Open ↗
11/29/2017122757329Open ↗
11/16/2017122757329Open ↗
Showing 3 of 5 on file for this type
▸Other Documents11
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal10
09/03/2026M00630867-I1Open ↗
08/15/2026M00630867-P1Open ↗
08/14/2026M00630867-S1Open ↗
Showing 3 of 10 on file for this type
▸BISPLOT DIAGRAM1
08/24/2018123433846Open ↗