← Back
Condo, hotel / boatel
Times Square
851 8 AVENUE · BIN 1025211
💬 Discuss this project
1962Year Built
11Stories
RHBuilding Class
C6-4Zoning
264,932 sfGross Floor Area
600Units
LL97 CoveredRent Stabilized13 Open Violations 12 unresolved · 1 paperwork only ▸FISP: SWARMP
Condo, hotel / boatel · 26,340 sf lot · 10.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 8 docs
Floor 113p · 3 filings · 11 docs
Floor 103p · 3 filings · 11 docs
Floor 93p · 3 filings · 11 docs
Floor 83p · 3 filings · 11 docs
Floor 73p · 3 filings · 11 docs
Floor 63p · 3 filings · 11 docs
Floor 53p · 3 filings · 11 docs
Floor 43p · 3 filings · 11 docs
Floor 33p · 3 filings · 11 docs
Floor 25p · 5 filings · 20 docs
Floor 112p · 9 filings · 20 docs
Mezzanine8p · 6 filings · 20 docs
Cellar10p · 8 filings · 20 docs
Sub-Cellar2p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RPH HOTELS 48TH STREET OWNERS14009/25/2026
HIGHGATE HOTELS LP903/22/2026
RPH HOTELS 51ST STREET OWNERS LL403/22/2026
HJ PARKING LLC103/22/2026
THE OWNER OF THE PARKING303/22/2026
845 THIRD103/22/2026
51 8 AVE CORP DAD HOWA103/22/2026
51 8 AVE CORP CBA HOWARD103/22/2026
51 AND 8 AVE CORP103/22/2026
CORP CONT HOTEL DIV103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&K PARTNERS, INCGeneral Contractor1207/08/2026
RIDGE CONSTRUCTION CORPGeneral Contractor507/08/2026
PAR PLUMBING CO., INCPlumbing307/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
R.G.M. SIGNS INCGeneral Contractor303/21/2026
NATIONAL MAINTENANCEScaffold207/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
AGGRESSIVE FIRE PROT LLCFire Protection207/08/2026
HIDDEN HILL HOSPITALITY CGeneral Contractor207/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor207/16/2026
RALLY RESTORATION CORPGeneral Contractor107/08/2026
NOEL NASHElectrical103/21/2026
WARREN ELEVATOR SVC COElectrical103/22/2026
PACE PLUMBING CORPFire Protection107/08/2026
BARTON CONSTRUCTION LLCGeneral Contractor109/25/2026
ANTHONY RANIERIElectrical103/21/2026
PACE PLUMBING CORPPlumbing107/08/2026
A1 SPECIALIZED, INCScaffold107/08/2026
A M A HOLDINGSScaffold107/08/2026
CITY SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CFS ENGINEERING, PC615101/20/2026
SHAHRISH SHUVO ENGINEERIN8524106/23/2025
SURFACE DESIGN PROFESSION3968206/23/2025
PSI AGENCY INC.254109/27/2024
AK ENGINEERING PC6781404/30/2024
CATALPA SPECIAL INSPECTIO2004608/17/2023
Building Lifecycle
All (281)Filed (46)Permit Issued (36)Signed Off (26)Facade (FISP) (12)Violation (60)Inspection (15)Objection (56)Special Inspection (30)
09/24/2026
Permit issued — Mechanical Systems
M01329419-I1-MS
07/15/2026
Permit issued — Sidewalk Shed
M01383207-I1-SH
07/09/2026
Permit issued — Suspended Scaffold
M01245020-I1-SC
05/19/2026
Permit issued — General Construction
M01233105-I1-GC
04/21/2026
Permit issued — Sidewalk Shed
M01383207-I1-SH
04/11/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01383207-I1
01/20/2026
Filed — Alteration
M01329419-I1
08/28/2025
Signed off — Alteration
PAA FILED HEREIN TO UPDATE THE SPECIALTY CREW LETTER, ADD 3rd PERSON ON SCAFFOLD LETTER, AND REVISE THE PLANS TO ADD THE 3rd PERSON ON SCAFFOLD/INSPECTION OPTION. APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE WORK AND PAINTING.
M01202337-I1
07/09/2025
Permit issued — Suspended Scaffold
M01245020-I1-SC
07/08/2025
Objection resolved — Addressed
07/07/2025
Objection raised — Other
07/03/2025
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01245020-I1
07/01/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
06/23/2025
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01233105-I1
06/11/2025
Filed — Alteration
PAA FILED HEREIN TO UPDATE THE SPECIALTY CREW LETTER, ADD 3rd PERSON ON SCAFFOLD LETTER, AND REVISE THE PLANS TO ADD THE 3rd PERSON ON SCAFFOLD/INSPECTION OPTION. APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE WORK AND PAINTING.
M01202337-P1
06/11/2025
Objection raised — Other
06/11/2025
Objection resolved — Addressed
06/04/2025
Violation issued (HPD, closed)
A
06/02/2025
Permit issued — Sign
M01203907-I1-SG
04/24/2025
Filed — Alteration
REPLACE EXISTING ILLUMINATED SIGN ON EXTERIOR WALL. PREVIOUSLY FILED UNDER SIGN APPLICATION # 104100731 (ROMER NEIGHBORHOOD HOTELS)
M01203907-I1
04/22/2025
Filed — Alteration
Installation of temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01205937-I1
04/22/2025
Permit issued — Suspended Scaffold
M01202337-I1-SC
04/22/2025
Permit issued — Sidewalk Shed
M01205937-I1-SH
04/14/2025
Objection resolved — Addressed
04/11/2025
Objection raised — Other
04/09/2025
Filed — Alteration
PAA FILED HEREIN TO UPDATE THE SPECIALTY CREW LETTER, ADD 3rd PERSON ON SCAFFOLD LETTER, AND REVISE THE PLANS TO ADD THE 3rd PERSON ON SCAFFOLD/INSPECTION OPTION. APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE WORK AND PAINTING.
M01202337-I1
04/01/2025
Special inspection requirement — Final
LEON SKVIRSKY
03/07/2025
Signed off — Alteration
M01114771-I1
12/11/2024
Permit issued — General Construction
M01114771-I1-GC
11/22/2024
Violation issued (HPD, closed)
I
09/27/2024
Filed — Alteration
M01114771-I1
09/27/2024
Special inspection requirement — Air barrier - visual inspection
MOLLY FORR
09/27/2024
Special inspection requirement — Energy Code Compliance Inspections
MOLLY FORR
09/20/2024
Special inspection requirement — Masonry
MOLLY FORR
09/20/2024
Special inspection requirement — Final
Benson Gillespie
09/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
MAURICIO ANDRADE
06/24/2024
Signed off — Alteration
M00813458-I1
05/24/2024
Cycle 9 facade report signed — SWARMP
05/09/2024
Signed off — Alteration
MECHANICAL MODIFICATION RELATED TO BUILD OUT OF PHASE 2 (RESTAURANT) AS PER DRAWINGS FILED HEREWITH.
M00812545-I1
04/30/2024
Filed — Alteration
MECHANICAL MODIFICATION RELATED TO BUILD OUT OF PHASE 2 (RESTAURANT) AS PER DRAWINGS FILED HEREWITH.
M00812545-P2
04/30/2024
Special inspection requirement — Duct leakage testing, insulation and design
Ari Kamo
04/30/2024
Special inspection requirement — Final
Ari Kamo
04/30/2024
Special inspection requirement — Maintenance information
Ari Kamo
04/30/2024
Special inspection requirement — Mechanical Systems
Ari Kamo
04/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
04/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
04/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
04/30/2024
Special inspection requirement — Shutoff dampers
Ari Kamo
04/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
04/16/2024
Signed off — Alteration
M08044805-I1
04/15/2024
Special inspection requirement — Final
Ari Kamo
04/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
04/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
04/15/2024
Special inspection requirement — Duct leakage testing, insulation and design
Ari Kamo
04/15/2024
Special inspection requirement — Shutoff dampers
Ari Kamo
04/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
04/15/2024
Special inspection requirement — Mechanical Systems
Ari Kamo
04/15/2024
Special inspection requirement — Maintenance information
Ari Kamo
04/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
04/12/2024
Signed off — Alteration
PLUMBING MODIFICATIONS RELATED TO BUILD OUT OF PHASE 2 (RESTATURANT) AS PER DRAWINGS FILED HEREWITH.
M00812552-I1
Latest 60 of 281 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBARTON CONSTRUCTION LLC09/24/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC07/15/2026
DOB NOWSuspended ScaffoldPermit IssuedRALLY RESTORATION CORP07/09/2026
DOB NOWGeneral ConstructionPermit IssuedRALLY RESTORATION CORP05/19/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC04/21/2026
DOB NOWSuspended ScaffoldPermit IssuedRALLY RESTORATION CORP07/09/2025
DOB NOWSignPermit IssuedA.M.A HOLDINGS INC06/02/2025
DOB NOWSuspended ScaffoldSigned-offPPM TELECOM LLC04/22/2025
DOB NOWSidewalk ShedPermit IssuedARSENAL SCAFFOLD INC04/22/2025
DOB NOWGeneral ConstructionSigned-offRALLY RESTORATION CORP12/11/2024
DOB NOWGeneral ConstructionSigned-offL&K PARTNERS, INC04/05/2024
DOB NOWMechanical SystemsSigned-offL&K PARTNERS, INC04/05/2024
DOB NOWGeneral ConstructionSigned-offL&K PARTNERS, INC08/28/2023
DOB NOWGeneral ConstructionSigned-offR.G.M. SIGNS INC08/24/2023
DOB NOWSignSigned-offELMER DAWSON08/18/2023
DOB NOWSignSigned-offMAD SIGNS INC08/10/2023
DOB NOWMechanical SystemsSigned-offRIDGE CONSTRUCTION CORP07/11/2023
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC07/10/2023
DOB NOWGeneral ConstructionSigned-offRIDGE CONSTRUCTION CORP07/07/2023
DOB NOWGeneral ConstructionSigned-offRIDGE CONSTRUCTION CORP06/26/2023
DOB NOWSprinklersSigned-offMANENGEERING BUREAU, INC05/30/2023
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC05/18/2023
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC05/17/2023
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC05/15/2023
DOB NOWPlumbingSigned-offPACE PLUMBING CORP05/12/2023
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC05/03/2023
DOB NOWGeneral ConstructionSigned-offL&K PARTNERS, INC04/20/2023
DOB NOWMechanical SystemsSigned-offL&K PARTNERS, INC04/19/2023
DOB NOWGeneral ConstructionSigned-offL&K PARTNERS, INC04/17/2023
DOB NOWGeneral ConstructionSigned-offHIDDEN HILL HOSPITALITY C04/13/2023
DOB NOWMechanical SystemsSigned-offL&K PARTNERS, INC04/06/2023
DOB NOWStructuralSigned-offL&K PARTNERS, INC04/06/2023
DOB NOWMechanical SystemsSigned-offHIDDEN HILL HOSPITALITY C04/03/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/09/2022
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC07/25/2018
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC07/25/2018
BISEQISSUEDINTERSYSTEM S&S CORP10/01/2018
BISOTISSUEDLHOTSE CORP08/01/2018
BISOTISSUEDLHOTSE CORP11/30/2017
BISEQISSUEDINTERSYSTEM S&S CORP09/25/2017
+ 46 more permits on file
1 project
FiledStatusContractorScope
————
16 projects · most recent 08/31/2026
General Wiring Lighting
FiledStatusContractorScope
08/31/2026CompleteH. & L. ELECTRIC INCGeneral Wiring
04/10/2026Permit IssuedBOROWIDE ELECT'L CONTR'S—
04/10/2025Permit IssuedNASH ELECTRIC SERVICES IN—
02/22/2024CompleteSCHLESINGER ELECT'L CONTRGeneral Wiring
10/12/2023CompleteALL PRO ELEC. OF N.Y. INC—
07/12/2023CompleteBIG ANT ELECTRIC, INCGeneral Wiring, Lighting
06/07/2022Permit IssuedH. & L. ELECTRIC INCGeneral Wiring
05/31/2022CompleteH. & L. ELECTRIC INCGeneral Wiring
03/31/2022CompleteWARREN ELEVATOR SVC COGeneral Wiring
03/09/2022CompleteTOP SHELF ELECTRIC CORP—
02/09/2022CompleteH. & L. ELECTRIC INCGeneral Wiring
01/31/2022CompleteH. & L. ELECTRIC INCGeneral Wiring
12/08/2021CompleteH. & L. ELECTRIC INCGeneral Wiring
05/26/2020CompleteMANELECTRIC, INCGeneral Wiring
09/25/2018Permit IssuedNATIONAL MAINT. INC—
2 projects · most recent 04/11/2026
Sidewalk Shed
FiledStatusContractorScope
04/11/2026Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
04/22/2025Permit IssuedARSENAL SCAFFOLD INCSidewalk Shed
1 project · most recent 07/03/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/03/2025Permit IssuedRALLY RESTORATION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
01/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/02/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/26/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 104
DateRequirementInspectorRole
07/01/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
04/01/2025FinalLEON SKVIRSKYprogress
09/27/2024Energy Code Compliance InspectionsMOLLY FORRprogress
09/27/2024Air barrier - visual inspectionMOLLY FORRenergy_progress
09/20/2024MasonryMOLLY FORRspecial
09/20/2024Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
09/20/2024FinalBenson Gillespieprogress
04/30/2024HVAC-R and service water heating equipmentAri Kamoenergy_progress
04/30/2024HVAC-R and service water heating system controlsAri Kamoenergy_progress
04/30/2024HVAC-R and service water piping design and insulationAri Kamoenergy_progress
04/30/2024Shutoff dampersAri Kamoenergy_progress
04/30/2024Tenant Protection Plan ComplianceAri Kamospecial
04/30/2024Mechanical SystemsAri Kamospecial
04/30/2024FinalAri Kamoprogress
04/30/2024Maintenance informationAri Kamoenergy_progress
04/30/2024Duct leakage testing, insulation and designAri Kamoenergy_progress
04/15/2024Mechanical SystemsAri Kamospecial
04/15/2024HVAC-R and service water piping design and insulationAri Kamoenergy_progress
04/15/2024Shutoff dampersAri Kamoenergy_progress
04/15/2024HVAC-R and service water heating equipmentAri Kamoenergy_progress
04/15/2024HVAC-R and service water heating system controlsAri Kamoenergy_progress
04/15/2024Duct leakage testing, insulation and designAri Kamoenergy_progress
04/15/2024Maintenance informationAri Kamoenergy_progress
04/15/2024FinalAri Kamoprogress
04/15/2024Tenant Protection Plan Compliance—special
Latest 25 of 104.
▾Documents — 414 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch45
09/06/2026M00012397-I1Request digital key ↗
09/06/2026M00012387-I1Request digital key ↗
09/02/2026M00692228-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/29/2026M00902425-I1Request digital key ↗
▸Applications & Permits59
▸BISPLAN / WORK APPROVAL APPLICATION44
10/26/2023141024790Open ↗
09/05/2023103744904Open ↗
09/05/2023103744904Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION11
08/01/2019123136962Open ↗
10/01/2018140695727Open ↗
08/01/2018123136962Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
03/08/2021100352896Open ↗
03/08/2021101478287Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/26/2023141024790Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M08053410-I1Open ↗
▸Seals & Professional Certifications117
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/02/2026M00692228-I1Open ↗
09/01/2026M08044746-I1Open ↗
09/01/2026M08044759-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/27/2026M00847374-I1Open ↗
09/25/2026M00915701-I1Open ↗
09/25/2026M00915701-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/27/2026M00847374-I1Open ↗
09/25/2026M00812545-P2Open ↗
09/25/2026M00915701-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
03/04/2020123136962Open ↗
02/05/2019140455898Open ↗
12/13/2018140695727Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/26/2023141024790Open ↗
09/19/2017140695727Open ↗
02/04/2016140455898Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/19/2017140695727Open ↗
02/04/2016140455898Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/19/2017140695727Open ↗
02/04/2016140455898Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/26/2023141024790Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/30/2012121000193Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/30/2012121000193Open ↗
▸Trade Schedules & Equipment10
▸BISEQUIPMENT USE PERMITS2
05/06/2013121000193Open ↗
04/26/2012121000193Open ↗
▸BISSCHEDULE B - PLUMBING2
02/04/2016140455898Open ↗
01/28/2010120253787Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/28/2017140455898Open ↗
08/24/2017140455898Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
04/02/2012120253787Open ↗
02/10/2012120253787Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
05/06/2013121000193Open ↗
04/26/2012121000193Open ↗
▸Safety & Tenant Protection49
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist42
08/29/2026M00855481-I1Open ↗
08/13/2026M00012387-I1Open ↗
08/13/2026M01233105-I1Open ↗
Showing 3 of 42 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON2
10/19/2017123136962Open ↗
03/30/2012121000193Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
09/19/2017140695727Open ↗
09/01/2017123136962Open ↗
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST1
02/04/2016140455898Open ↗
▸BISBPP: STREET TREES SITE PLAN1
10/26/2023141024790Open ↗
▸DOB NOWCertificate of No Harassment1
08/13/2026M08044746-I1Open ↗
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/29/2026M00855200-I1Open ↗
08/29/2026M00855200-P1Open ↗
08/29/2026M00855481-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
09/01/2026M08044805-I1Open ↗
09/01/2026M00812556-I1Open ↗
09/01/2026M00813458-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/30/2012121000193Open ↗
01/28/2010120253787Open ↗
01/28/2010120253787Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/18/2017123136962Open ↗
02/04/2016140455898Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/05/2019140455898Open ↗
09/01/2017123136962Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
02/05/2019140455898Open ↗
05/06/2013121000193Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/01/2020123136962Open ↗
02/04/2016140455898Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/06/2013121000193Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/19/2017140695727Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/04/2016140455898Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/30/2012121000193Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/01/2020123136962Open ↗
06/01/2020123136962Open ↗
09/21/2017140695727Open ↗
Showing 3 of 5 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
02/09/2010120253787Open ↗
▸Approvals, Objections & Sign-offs34
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
12/02/2020103744904Open ↗
06/01/2020123136962Open ↗
04/10/2019103744904Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
08/24/2023103744904Open ↗
08/14/2023103744904Open ↗
07/31/2023103744904Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
03/30/2012121000193Open ↗
01/27/2010120253787Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026M00847374-I1Open ↗
08/13/2026M08044759-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/13/2016140455898Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
09/02/2026M00692228-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
06/01/2020123136962Open ↗
03/04/2020123136962Open ↗
02/05/2019140455898Open ↗
Showing 3 of 10 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
09/21/2017140695727Open ↗
▸Filing & Intake Forms29
▸BISBOROUGH INTAKE FORM14
01/22/2020123136962Open ↗
04/10/2019103744904Open ↗
02/05/2019140455898Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION10
06/22/2023103744904Open ↗
05/12/2020123136962Open ↗
03/04/2020123136962Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/26/2023141024790Open ↗
09/19/2017140695727Open ↗
02/04/2016140455898Open ↗
▸BISEFILING COVER SHEET2
09/01/2017123136962Open ↗
03/30/2012121000193Open ↗
▸Other Documents13
▸DOB NOWCalculations3
08/13/2026M01202337-P1Open ↗
08/13/2026M01245020-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
08/13/2026M01245020-I1Open ↗
Showing 1 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/26/2023141024790Open ↗
02/04/2016140455898Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
08/13/2026M00012387-I1Open ↗
08/13/2026M00012397-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
08/13/2026M00012397-I1Open ↗
08/13/2026M00012387-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/21/2017140695727Open ↗