← Back
Two family brick
854 58 STREET
BROOKLYN · BIN 3140520
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R6Zoning
2,916 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 2,003 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY BUILDING ASSOCIATES IN403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/22/2025$1.9M—Private party → XING WANG 58 LLC$652/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAM ENGINEER PC402/26/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ERIC & NG ELEC'L, INC.Electrical103/22/2026
NY BUILDING ASSOCIATES INGeneral Contractor107/08/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM ENGINEER PC1180402/26/2026
Building Lifecycle
All (45)Filed (4)Permit Issued (2)Signed Off (2)Violation (4)Inspection (6)Special Inspection (27)
03/24/2026
Signed off — Alteration
PROPOSED INTERIOR RENOVATION WORK AT CELLAR, 1ST AND 2ND FLOOR. GENERAL CONSTRUCTION WORK AS PER THE PLAN SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01297154-S1
03/03/2026
Signed off — Alteration
PROPOSED INTERIOR RENOVATION WORK AT CELLAR, 1ST AND 2ND FLOOR. GENERAL CONSTRUCTION WORK AS PER THE PLAN SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01297154-I1
03/02/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/26/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK AT CELLAR, 1ST AND 2ND FLOOR. GENERAL CONSTRUCTION WORK AS PER THE PLAN SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01297154-P2
02/25/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/25/2026
Special inspection requirement — Maintenance information
YUK LAM
02/25/2026
Special inspection requirement — Interior lighting power
YUK LAM
02/25/2026
Special inspection requirement — Fenestration air leakage
YUK LAM
02/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
YUK LAM
02/25/2026
Special inspection requirement — Permanent certificate
YUK LAM
02/25/2026
Special inspection requirement — Fenestration areas
YUK LAM
02/25/2026
Special inspection requirement — Air barrier - visual inspection
YUK LAM
02/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
02/25/2026
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
02/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
YUK LAM
02/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK AT CELLAR, 1ST AND 2ND FLOOR. GENERAL CONSTRUCTION WORK AS PER THE PLAN SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01297154-P1
01/09/2026
Special inspection requirement — Fenestration air leakage
YUK LAM
01/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
YUK LAM
01/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
YUK LAM
01/09/2026
Special inspection requirement — Air barrier - visual inspection
YUK LAM
01/09/2026
Special inspection requirement — Fenestration areas
YUK LAM
01/09/2026
Special inspection requirement — Permanent certificate
YUK LAM
01/09/2026
Special inspection requirement — Maintenance information
YUK LAM
01/09/2026
Special inspection requirement — Interior lighting power
YUK LAM
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
01/07/2026
Violation issued (ECB, closed)
Construction
01/07/2026
Violation issued (ECB, closed)
Site Safety
12/17/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/17/2025
Violation issued (ECB, closed)
Unknown
11/17/2025
Violation issued (ECB, closed)
Construction
10/16/2025
Permit issued — General Construction
B01297154-I1-GC
10/15/2025
Permit issued — Plumbing
B01297154-S1-PL
10/11/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK AT CELLAR, 1ST AND 2ND FLOOR. GENERAL CONSTRUCTION WORK AS PER THE PLAN SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01297154-S1
10/11/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK AT CELLAR, 1ST AND 2ND FLOOR. GENERAL CONSTRUCTION WORK AS PER THE PLAN SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01297154-I1
10/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YUK LAM
10/11/2025
Special inspection requirement — Permanent certificate
YUK LAM
10/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
YUK LAM
10/11/2025
Special inspection requirement — Maintenance information
YUK LAM
10/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
YUK LAM
10/11/2025
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
10/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN10/16/2025
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO10/15/2025
1 project · most recent 11/25/2025
General Wiring
FiledStatusContractorScope
11/25/2025CompleteERIC & NG ELEC'L, INC.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/02/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/25/2026Fail-Final General Construction Non-Directive 14FailView ↗
02/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
02/25/2026Maintenance informationYUK LAMenergy_progress
02/25/2026Interior lighting powerYUK LAMenergy_progress
02/25/2026Fenestration air leakageYUK LAMenergy_progress
02/25/2026Fenestration and door U-factor and product ratingsYUK LAMenergy_progress
02/25/2026Permanent certificateYUK LAMenergy_progress
02/25/2026Fenestration areasYUK LAMenergy_progress
02/25/2026Air barrier - visual inspectionYUK LAMenergy_progress
02/25/2026Fire-Resistant Penetrations and JointsYUK LAMspecial
02/25/2026Energy Code Compliance InspectionsYUK LAMprogress
02/25/2026Fire-Resistance Rated ConstructionYUK LAMprogress
01/09/2026Fenestration air leakageYUK LAMenergy_progress
01/09/2026Fire-Resistance Rated ConstructionYUK LAMprogress
01/09/2026Fenestration and door U-factor and product ratingsYUK LAMenergy_progress
01/09/2026Air barrier - visual inspectionYUK LAMenergy_progress
01/09/2026Fenestration areasYUK LAMenergy_progress
01/09/2026Permanent certificateYUK LAMenergy_progress
01/09/2026Maintenance informationYUK LAMenergy_progress
01/09/2026Interior lighting powerYUK LAMenergy_progress
01/09/2026Fire-Resistant Penetrations and JointsYUK LAMspecial
01/09/2026Energy Code Compliance InspectionsYUK LAMprogress
10/11/2025HVAC-R and service water piping design and insulationYUK LAMenergy_progress
10/11/2025Permanent certificateYUK LAMenergy_progress
10/11/2025HVAC-R and service water heating system controlsYUK LAMenergy_progress
10/11/2025Maintenance informationYUK LAMenergy_progress
10/11/2025HVAC-R and service water heating equipmentYUK LAMenergy_progress
Latest 25 of 27.
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026B01297154-I1Request digital key ↗
08/19/2026B01297154-P2Request digital key ↗
08/19/2026B01297154-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
09/26/2026B01297154-S1Open ↗
09/26/2026B01297154-S1Open ↗
08/24/2026B01297154-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026B01297154-I1Open ↗
08/19/2026B01297154-P2Open ↗
08/19/2026B01297154-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/26/2026B01297154-S1Open ↗
08/24/2026B01297154-P2Open ↗
08/23/2026B01297154-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/19/2026B01297154-I1Open ↗
08/19/2026B01297154-P2Open ↗
08/19/2026B01297154-P1Open ↗
Showing 3 of 4 on file for this type