DOB09/18/2024FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB07/18/2024FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE & APPURTENANCES: AT TIME OF INSPECTION IT WAS OBSERVED: AT EXPOSURE 4(WEST ELEVATION) BUILDING WALL AT MULTIPLE LOCATIONS. MAINTAIN EXTERIOR FACADE. TAKE SAFETY MEAS$-2,500 due
DOB07/18/2024EMERGENCY WORK ORDER DUE TO BULDGING WALL AT MULTIPLE LOCATIONS AT EXP 4 WEST ELEVATION.REMEDY:IMMEDIATELY PROVIDE AND TAKE SAFETY MEASURES T O SECURE AND PROTECT THE PUBLIC AND INSTALL PUBLIC PROTECTION AT ALL E XPOSURES.IMMEDIATELY REPAIR/REPLACE CRACKED WINDOWS
DOB02/22/2024FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
HPD05/03/1989SECTION 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS BULKHEAD SOUTH ROOF.
HPD05/03/1989SECTION 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF TABLES 6 STY PUBLIC HALL.
HPD08/22/1988SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION OPENING CREATED NORTH WALL REAR SECTION PUBLIC HALL TO ADJOINING BUILDING THROUGHOUT 6 STY.
ECB07/25/2024FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: OBSERVED AT EXP #3(SOUTH ELEV.) BROKEN WINDOW GLASS BETWEEN 10TH AND ROOF. REMEDY: MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. PROVNothing owed — awaiting certificate of correction
ECB03/28/201897R05. 97R UNREGISTERED DEVICE WAS INSTALLED WITHOUT PERMIT BEING OBTAINED AND APPLICATION BEING FILED.REMEDY:FILE APPLICATION AND OBTAIN PERMIT FOR WORK AND SCHEDULE TEST APPOINTMENT WITH DOB(CEASE USE).Nothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction
ECB01/27/2010FAILURE TO FILE AN ARCHITECT/ENGINEER REPORT CERTIFYING EXIT/DIRECTIONAL SIGNS ARE CONNECTED TO EMERGENCY POWER SOURCE/STORAGE BATTERY EQUIPMENT.REM:FILE ARCHITECT/ENGINEER REPORTNothing owed — awaiting certificate of correction