Issued Permit Scope
General Construction · Standpipe · Supported Scaffold
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
8 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 27Under Construction6p · 2 filings · 20 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents · 2 drawing sheets
Temporary Interior Alteration . No change in use or occupancy
On file for this project
8 documents · 1 drawing sheet
Floor 26Under Construction5p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneral
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 25Under Construction4p · 4 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 24Under Construction5p · 4 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 23Under Construction5p · 4 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 22Under Construction5p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneral
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 21Under Construction4p · 4 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 20Under Construction5p · 4 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 19Under Construction4p · 4 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 18Under Construction7p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
8 documents · 2 drawing sheets
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 17Under Construction5p · 4 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 16Under Construction5p · 4 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 15Under Construction5p · 4 filings · 20 docs
ArchitectureDMFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 14Under Construction5p · 4 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 13Under Construction4p · 4 filings · 20 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 12Under Construction5p · 4 filings · 20 docs
ArchitectureDMFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 11Under Construction5p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneral
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 10Under Construction5p · 4 filings · 20 docs
ArchitectureDMFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 9Under Construction5p · 4 filings · 20 docs
ArchitectureCivilDMFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 8Under Construction5p · 4 filings · 20 docs
ArchitectureCivilDMFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 7Under Construction5p · 4 filings · 20 docs
ArchitectureCivilDMFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 6Under Construction5p · 4 filings · 20 docs
ArchitectureCivilDMFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 5Under Construction5p · 4 filings · 20 docs
ArchitectureCivilDMFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 4Under Construction5p · 4 filings · 20 docs
ArchitectureCivilDMFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 3Under Construction7p · 4 filings · 20 docs
ArchitectureCivilDMFire ProtectionStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents · 1 drawing sheet
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 2Under Construction10p · 4 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents · 4 drawing sheets
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1Under Construction6p · 4 filings · 20 docs
ArchitectureCivilDMFire Protection
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Standpipe
mechanical equipment to assist with demolition and chute will be built to lower debris
On file for this project
41 documents · 1 drawing sheet
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
PLANS PRESENT MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION IN CONJUNCTION WITH RELATED FULL DEMOLITION M01177085 TO CREATE FLOOR OPENINGS TO FACILITATE INSTALLATION OF DEBRIS CHUTE BY SEPARATE PERMIT APPLICATION.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
CellarUnder Construction7p · 3 filings · 20 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneral
Issued Permit Scope
General Construction · Standpipe
Installation of 7,100# temporary single car personnel hoist in conjunction with FD# M01177085, per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
8 documents · 2 drawing sheets
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01177085-I1. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupancy filed under this application.
On file for this project
4 documents
Temporary Interior Alteration . No change in use or occupancy