← Back
Elevator apt, semi-fireproof with stores
8623 FLATLANDS AVENUE
BROOKLYN · BIN 3428996
💬 Discuss this project
2022Year Built
4Stories
D7Building Class
R5DZoning
13,497 sfGross Floor Area
13Units
5 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 8623 FLATLANDS PROPERTY LLC · 5,400 sf lot · 2.5 FAR built · Flood zone X500
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof1p · 1 filing · 2 docs
Bulkhead4p · 4 filings · 20 docs
Floor 42p · 2 filings · 20 docs
Floor 34p · 4 filings · 20 docs
Floor 25p · 4 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
8623 FLATLANDS PROPERTY3407/08/2026
V A N CONSTRUCTION2107/08/2026
8623 FLATLANDS REALTY503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/21/2016$635K—8623 FLATLANDS CORP → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOMBARDO BUILDING CONSULTANTS103/21/2026
BDP EXPEDITERS GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
V.A.N. CONSTRUCTION CORPGeneral Contractor2007/08/2026
PROFESSIONAL LINE CORPGeneral Contractor407/08/2026
AMOK INCFire Protection207/08/2026
JOHN AHRENSElectrical203/21/2026
TUXEDO ELECL CONTRG INC 004066General Contractor203/22/2026
RSLN ARCHITECTUREGeneral Contractor103/22/2026
AMOK INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROFESSIONAL SOLUTIONS GR1756603/01/2024
Building Lifecycle
All (100)Filed (13)Permit Issued (12)Signed Off (9)Violation (23)Inspection (9)Objection (4)Special Inspection (30)
05/11/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/16/2025
Violation issued (HPD, open)
A
04/24/2024
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00666965-I1
03/19/2024
Signed off — Alteration
B00501857-I1
03/18/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/14/2024
Signed off — Alteration
NEW VRF HVAC SYSTEM AND DUCTWORK FOR NEW BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00491901-I1
03/14/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/01/2024
Filed — Alteration
NEW VRF HVAC SYSTEM AND DUCTWORK FOR NEW BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00491901-P1
03/01/2024
Signed off — Alteration
NEW PLUMBING SYSTEM FOR NEW BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00492680-I1
03/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
03/01/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMER ABOU-GHAIDA
03/01/2024
Special inspection requirement — Final
SAMER ABOU-GHAIDA
03/01/2024
Special inspection requirement — Maintenance information
SAMER ABOU-GHAIDA
03/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMER ABOU-GHAIDA
03/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMER ABOU-GHAIDA
03/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
03/01/2024
Special inspection requirement — Mechanical Systems
SAMER ABOU-GHAIDA
03/01/2024
Special inspection requirement — Heating Systems
SAMER ABOU-GHAIDA
02/29/2024
Special inspection requirement — Heating Systems
SAMER ABOU-GHAIDA
02/29/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMER ABOU-GHAIDA
02/29/2024
Special inspection requirement — Final
SAMER ABOU-GHAIDA
02/29/2024
Special inspection requirement — Maintenance information
SAMER ABOU-GHAIDA
02/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMER ABOU-GHAIDA
02/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMER ABOU-GHAIDA
02/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
02/29/2024
Special inspection requirement — Mechanical Systems
SAMER ABOU-GHAIDA
02/22/2024
Signed off — Alteration
B00518840-I1
02/22/2024
Signed off — Alteration
B00492789-I1
02/22/2024
Signed off — Alteration
B00555710-I1
01/16/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/05/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00747554-I1
11/30/2023
Permit issued — Mechanical Systems
B00491901-I1-MS
11/28/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAMER ABOU-GHAIDA
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
SAMER ABOU-GHAIDA
11/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
SAMER ABOU-GHAIDA
11/28/2023
Special inspection requirement — Maintenance information
SAMER ABOU-GHAIDA
11/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMER ABOU-GHAIDA
11/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
11/21/2023
Permit issued — Curb Cut
B00518840-I1-CC
11/20/2023
Filed — Alteration
NEW PLUMBING SYSTEM FOR NEW BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00492680-P1
10/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
10/25/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAMER ABOU-GHAIDA
10/25/2023
Special inspection requirement — Energy Code Compliance Inspections
SAMER ABOU-GHAIDA
10/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMER ABOU-GHAIDA
10/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
09/21/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00678883-I1
05/19/2023
Permit issued — Sprinklers
B00492789-I1-EW-SP
05/19/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
05/19/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/17/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/25/2023
Violation issued (ECB, closed)
Construction
01/25/2023
Violation issued (ECB, closed)
Construction
01/25/2023
Violation issued (ECB, closed)
Construction
01/25/2023
Violation issued (ECB, closed)
Construction
01/25/2023
Violation issued (ECB, closed)
Construction
01/25/2023
Violation issued (ECB, closed)
Construction
10/31/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offV.A.N. CONSTRUCTION CORP11/30/2023
DOB NOWCurb CutSigned-offV.A.N. CONSTRUCTION CORP11/21/2023
DOB NOWSprinklersSigned-offAMOK INC05/19/2023
DOB NOWConstruction FenceSigned-offV.A.N. CONSTRUCTION CORP08/04/2022
DOB NOWPlumbingSigned-offAMOK INC06/07/2022
DOB NOWSprinklersSigned-offAMOK INC06/03/2022
DOB NOWSupported ScaffoldSigned-offPROFESSIONAL LINE CORP05/31/2022
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP02/16/2022
DOB NOWProtection and Mechanical MethodsSigned-offV.A.N. CONSTRUCTION CORP02/07/2022
DOB NOWStructuralSigned-offV.A.N. CONSTRUCTION CORP08/20/2021
DOB NOWConstruction FenceSigned-offV.A.N. CONSTRUCTION CORP08/16/2021
DOB NOWConstruction FenceSigned-offV.A.N. CONSTRUCTION CORP07/19/2021
BIS—ISSUEDV.A.N. CONSTRUCTION CORP08/01/2023
BIS—ISSUEDV.A.N. CONSTRUCTION CORP03/29/2023
BIS—ISSUEDV.A.N. CONSTRUCTION CORP08/02/2022
BIS—ISSUEDV.A.N. CONSTRUCTION CORP12/02/2021
BIS—ISSUEDV.A.N. CONSTRUCTION CORP09/08/2021
2 projects · most recent 03/27/2023
FiledStatusContractorScope
03/27/2023CompleteTUXEDO ELEC'L CONTR'G INC—
02/16/2022CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/18/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/14/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/16/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/19/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
05/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/31/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
03/01/2024Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
03/01/2024Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
03/01/2024FinalSAMER ABOU-GHAIDAprogress
03/01/2024Maintenance informationSAMER ABOU-GHAIDAenergy_progress
03/01/2024HVAC-R and service water piping design and insulationSAMER ABOU-GHAIDAenergy_progress
03/01/2024HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
03/01/2024HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
03/01/2024Mechanical SystemsSAMER ABOU-GHAIDAspecial
03/01/2024Heating SystemsSAMER ABOU-GHAIDAspecial
02/29/2024Heating SystemsSAMER ABOU-GHAIDAspecial
02/29/2024Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
02/29/2024FinalSAMER ABOU-GHAIDAprogress
02/29/2024Maintenance informationSAMER ABOU-GHAIDAenergy_progress
02/29/2024HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
02/29/2024HVAC-R and service water piping design and insulationSAMER ABOU-GHAIDAenergy_progress
02/29/2024HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
02/29/2024Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
02/29/2024Mechanical SystemsSAMER ABOU-GHAIDAspecial
11/28/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSAMER ABOU-GHAIDAspecial
11/28/2023Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
11/28/2023Energy Code Compliance InspectionsSAMER ABOU-GHAIDAprogress
11/28/2023HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
11/28/2023Maintenance informationSAMER ABOU-GHAIDAenergy_progress
11/28/2023HVAC-R and service water piping design and insulationSAMER ABOU-GHAIDAenergy_progress
11/28/2023HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
Latest 25 of 32.
▾Documents — 161 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/01/2026B00491901-P1Request digital key ↗
09/01/2026B00492789-I1Request digital key ↗
09/01/2026B00492680-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
11/15/2023340777010Open ↗
03/28/2023340777010Open ↗
10/19/2021340777010Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/29/2023340777010Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
05/27/2021340777010Open ↗
10/26/2020340777010Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/19/2020340777010Open ↗
▸BISVERIFY TAX LOT1
02/25/2024340777010Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/21/2021340777010Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/21/2021340777010Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/21/2021340777010Open ↗
▸Seals & Professional Certifications56
▸DOB NOWProgress Inspector Seal & Signature25
08/30/2026B00491901-I1Open ↗
08/30/2026B00491901-I1Open ↗
08/30/2026B00491901-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
08/30/2026B00491901-I1Open ↗
08/30/2026B00491901-I1Open ↗
08/30/2026B00491901-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00491901-I1Open ↗
09/01/2026B00491901-P1Open ↗
09/01/2026B00492789-I1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/18/2021340812320Open ↗
10/19/2020340777010Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/19/2021340812320Open ↗
10/19/2020340777010Open ↗
▸Trade Schedules & Equipment3
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
05/21/2021340777010Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/28/2024340777010Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
03/18/2024340777010Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/21/2021340777010Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
09/25/2024340777010Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/18/2021340812320Open ↗
▸BISSTREET TREE CHECKLIST1
10/26/2020340777010Open ↗
▸BISSTREET TREE SIGNOFF1
05/20/2024340777010Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/20/2021340777010Open ↗
11/13/2020340777010Open ↗
10/19/2020340777010Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026B00491901-I1Open ↗
08/13/2026B00492680-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/28/2024340777010Open ↗
▸BISINTERIOR LIGHTING POWER1
02/28/2024340777010Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/28/2024340777010Open ↗
▸BISFENESTRATION AREAS1
02/28/2024340777010Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
03/19/2024340777010Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/28/2024340777010Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/28/2024340777010Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/28/2024340777010Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/28/2024340777010Open ↗
▸BISLIGHTING CONTROLS1
02/28/2024340777010Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/19/2020340777010Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
02/28/2024340777010Open ↗
▸BISEXTERIOR LIGHTING POWER1
02/28/2024340777010Open ↗
▸BISFENESTRATION AIR LEAKAGE1
02/28/2024340777010Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/23/2021340777010Open ↗
07/20/2021340777010Open ↗
10/19/2020340777010Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
02/25/2024340777010Open ↗
07/20/2021340777010Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
02/29/2024340777010Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
03/11/2024340777010Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/28/2024340777010Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/28/2024340777010Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
02/28/2024340777010Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
02/28/2024340777010Open ↗
▸BISSOIL REPORT1
10/19/2020340777010Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/20/2021340777010Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/20/2021340777010Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE3
11/15/2023340777010Open ↗
10/19/2021340777010Open ↗
05/19/2021340777010Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
04/23/2024340812320Open ↗
04/23/2024340812320Open ↗
▸Cost, Insurance & Ownership2
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
04/23/2024340812320Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/18/2021340777010Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION10
02/29/2024340777010Open ↗
11/17/2023340777010Open ↗
11/17/2023340777010Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/19/2021340812320Open ↗
10/19/2020340777010Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/18/2021340812320Open ↗
▸Other Documents18
▸BISBPP - SUPPORTING DOCUMENTATION10
04/23/2024340812320Open ↗
04/23/2024340812320Open ↗
04/23/2024340812320Open ↗
Showing 3 of 10 on file for this type
▸BISSHUTOFF DAMPERS1
02/28/2024340777010Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/19/2020340777010Open ↗
▸BISMAINTENANCE INFORMATION1
02/28/2024340777010Open ↗
▸BISTCO - Supporting Documents1
03/20/2024340777010Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
03/20/2024340777010Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
02/28/2024340777010Open ↗
▸BISPLOT DIAGRAM1
05/21/2021340777010Open ↗
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
04/23/2024340812320Open ↗