Factory, heavy manufacturing, fireproof
87-46 123 STREET
QUEENS · BIN 4440978
💬 Discuss this project
1931Year Built
3Stories
F1Building Class
M1-1Zoning
138,000 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Factory, heavy manufacturing, fireproof · Owner of record: ALPHAPOINTE · 95,905 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction28p · 2 filings · 16 docs
Floor 3Under Construction25p · 1 filing · 14 docs
Floor 2Under Construction30p · 2 filings · 20 docs
Floor 1Under Construction28p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALPHAPOINTE4409/19/2026
NEW SAFEWAY CONTRACTING CORP.1107/08/2026
GUL G CONTRACTING407/08/2026
TO THE OWNER OF 87-46 123103/22/2026
123 STREET HOLDING303/22/2026
H. REALTY203/22/2026
JPC CONTRACTING103/22/2026
123RD STREET HOLDING1103/21/2026
1223RD ST HOLDING203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/16/2017$18.1M—— → —$131/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRISTINE GUTTERS403/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
MIELE ASSOCIATES, LLP1503/21/2026
BUILDING BROTHERS403/21/2026
DANICO SERVICES403/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PA BUILDERS, INCGeneral Contractor1109/19/2026
NEW SAFEWAY CONTRACTINGGeneral Contractor507/08/2026
MO CONTRACTING INCGeneral Contractor507/08/2026
BLIZZARD COOLING INCGeneral Contractor303/21/2026
BUSKO REALTY CORPGeneral Contractor307/08/2026
LODUCA ASSOCIATES INCGeneral Contractor304/08/2026
RENNON CONSTRUCTION CORPGeneral Contractor203/21/2026
FSM ELECTRICAL CORPORATIOElectrical103/22/2026
L S SIGNScaffold107/08/2026
ROBERT S. COVELLOElectrical103/22/2026
GUL & G CONTRACTING INCGeneral Contractor107/08/2026
PREMIER CONSTRUCT SVC LLCGeneral Contractor104/09/2026
PASQUALE QUARATINO INCPlumbing107/08/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BEYOND ARCH LLC3600306/09/2026
D&B ENGINEERS AND ARCHITE2461109/12/2025
ENGINEERING CONSULTING SE2050404/18/2023
TRIANGLE INSPECTION & TES7495101/20/2021
Building Lifecycle
All (138)Filed (20)Permit Issued (23)Signed Off (10)Violation (32)Inspection (11)Objection (12)Special Inspection (30)
09/18/2026
Permit issued — Mechanical Systems
Q00836218-I1-GC
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
06/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Hackjong Choi
06/25/2026
Special inspection requirement — Duct leakage testing, insulation and design
Hackjong Choi
06/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
Hackjong Choi
06/25/2026
Special inspection requirement — Shutoff dampers
Hackjong Choi
06/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
Hackjong Choi
06/25/2026
Special inspection requirement — Maintenance information
Hackjong Choi
06/25/2026
Special inspection requirement — Final
Joel Miele
06/25/2026
Special inspection requirement — Structural Steel - Details
Hackjong Choi
06/25/2026
Special inspection requirement — Mechanical Systems
Hackjong Choi
06/09/2026
Filed — Alteration
Installation of HVAC including related ductwork on first, second and third floors in Building Segments 3, 6, 7, 10, 11, 12, 13, 16, 17 and 18 and related dunnage and FDNY access accessories on the roofs of Building Segments 5, 7, 8, 10, 11, 16, 17 and 18.
Q00836218-P1
04/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/18/2025
Signed off — Alteration
Q01290516-I1
12/03/2025
Permit issued — Antenna
Q01290516-I1-AN
10/16/2025
Filed — Alteration
Q01290516-I1
10/05/2025
Filed — Alteration
Q01273418-I1
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/24/2025
Permit issued — General Construction
Q01282989-I1-GC
09/23/2025
Permit issued — General Construction
Q01282989-I1-GC
09/12/2025
Filed — Alteration
Additional wythe of brick added to south wall after adjacent building demolition
Q01282989-I1
08/28/2025
Permit issued — Sidewalk Shed
Q01273402-I1-SH
08/19/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01273402-I1
06/27/2025
Signed off — Alteration
Propose to disconnect sprinkler piping that extends into the adjoining building on the adjoining zoning lot (tax lot 50) and cap piping. The building on the adjoining zoning lot is owned by the MTA and formerly leased to Alphapointe.
Q01209850-I1
06/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/12/2025
Permit issued — Sprinklers
Q01209850-I1-EW-SP
05/01/2025
Objection resolved — Addressed
04/29/2025
Objection raised — Fire_Protection
04/18/2025
Filed — Alteration
Propose to disconnect sprinkler piping that extends into the adjoining building on the adjoining zoning lot (tax lot 50) and cap piping. The building on the adjoining zoning lot is owned by the MTA and formerly leased to Alphapointe.
Q01209850-I1
04/11/2025
Special inspection requirement — Sprinkler Systems
Hackjong Choi
03/13/2025
Special inspection requirement — Shutoff dampers
Hackjong Choi
03/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
03/13/2025
Special inspection requirement — Mechanical Systems
Hackjong Choi
03/13/2025
Special inspection requirement — Structural Steel - Details
Hackjong Choi
03/13/2025
Special inspection requirement — Final
Joel Miele
03/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Hackjong Choi
03/13/2025
Special inspection requirement — Duct leakage testing, insulation and design
Hackjong Choi
03/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Hackjong Choi
03/13/2025
Special inspection requirement — Maintenance information
Hackjong Choi
03/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Hackjong Choi
12/17/2024
Permit issued — Structural
Q00836218-I1-GC
05/13/2024
Violation issued (ECB, closed)
Unknown
04/29/2024
Signed off — Alteration
Q00557961-I1
03/11/2024
Permit issued — General Construction
Q00836218-I1-MS
09/28/2023
Signed off — Alteration
Proposed elevator shaft and machine room
Q00451619-I1
09/12/2023
Permit issued — Mechanical Systems
Q00836218-I1-GC
07/13/2023
Filed — Alteration
Installation of HVAC including related ductwork on first, second and third floors in Building Segments 3, 6, 7, 10, 11, 12, 13, 16, 17 and 18 and related dunnage and FDNY access accessories on the roofs of Building Segments 5, 7, 8, 10, 11, 16, 17 and 18.
Q00836218-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2023
Signed off — Alteration
Proposed installation of new drywell system in open space.
Q00443694-I1
04/29/2023
Special inspection requirement — Interior lighting power
PAUL MARINO
04/29/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
04/29/2023
Special inspection requirement — Underpinning
PAUL MARINO
04/29/2023
Special inspection requirement — Concrete - Cast-In-Place
PAUL MARINO
04/29/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/29/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PAUL MARINO
04/29/2023
Special inspection requirement — Insulation placement and R values
PAUL MARINO
04/29/2023
Special inspection requirement — Air barrier - visual inspection
PAUL MARINO
04/29/2023
Special inspection requirement — Fenestration areas
PAUL MARINO
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPA BUILDERS, INC09/18/2026
DOB NOWAntennaSigned-offPREMIER CONSTRUCT SVC LLC12/03/2025
DOB NOWGeneral ConstructionSigned-offLODUCA ASSOCIATES INC09/24/2025
DOB NOWGeneral ConstructionSigned-offLODUCA ASSOCIATES INC09/23/2025
DOB NOWSidewalk ShedPermit IssuedNEW SAFEWAY CONTRACTING08/28/2025
DOB NOWSprinklersSigned-offPASQUALE QUARATINO INC05/12/2025
DOB NOWStructuralPermit IssuedPA BUILDERS, INC12/17/2024
DOB NOWGeneral ConstructionPermit IssuedBLIZZARD COOLING INC03/11/2024
DOB NOWMechanical SystemsPermit IssuedPA BUILDERS, INC09/12/2023
DOB NOWPlumbingPermit IssuedM. SPINELLI PLB & HTG INC01/12/2023
DOB NOWGeneral ConstructionSigned-offPA BUILDERS, INC07/29/2022
DOB NOWSidewalk ShedPermit IssuedNEW SAFEWAY CONTRACTING07/20/2022
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI08/26/2021
DOB NOWSupported ScaffoldSigned-offGUL & G CONTRACTING INC07/22/2021
DOB NOWGeneral ConstructionSigned-offPA BUILDERS, INC07/14/2021
DOB NOWGeneral ConstructionSigned-offBUSKO REALTY CORP03/29/2021
DOB NOWGeneral ConstructionSigned-offBUSKO REALTY CORP03/22/2021
DOB NOWMechanical SystemsSigned-offMO CONTRACTING INC07/15/2020
DOB NOWCurb CutPermit IssuedMO CONTRACTING INC06/04/2020
DOB NOWCurb CutPermit IssuedMO CONTRACTING INC06/04/2020
DOB NOWSidewalk ShedPermit IssuedNEW SAFEWAY CONTRACTING02/24/2020
DOB NOWSignSigned-offWEINFELD, ELLIOT11/13/2018
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP07/30/2018
BISOTISSUEDPA BUILDERS, INC03/24/2022
BISOTISSUEDMO CONTRACTING INC07/21/2020
BISOTISSUEDFIVE STAR AWNINGS INC03/21/2019
BISOTISSUEDFIVE STAR AWNINGS INC11/08/2018
BISEQISSUEDJPC CONTRACTING INC08/20/2018
BISOTISSUEDJPC CONTRACTING INC08/20/2018
BISOTISSUEDJPC CONTRACTING INC03/12/2018
BISOTISSUEDJPC CONTRACTING INC12/22/2017
BISPLISSUEDREEM PLBG & HTG CORP08/22/2017
BISOTISSUEDJPC CONTRACTING INC07/06/2017
BISEQISSUEDJPC CONTRACTING INC07/06/2017
BISOTISSUEDSQUAN CONSTRUCTION SERVIC04/17/2017
BISMHISSUEDOBAR SYSTEMS, INC02/22/2017
BIS—ISSUEDN/A11/21/2006
BISEQISSUEDH & L PARTNERS,INC01/17/2006
BIS—ISSUEDH & L PARTNERS,INC01/17/2006
BISPLISSUEDBEDROCK PLBG. & HTG., INC11/02/2005
+ 6 more permits on file
1 project · most recent 06/09/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/09/2026Permit IssuedPA BUILDERS, INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUM144BTE5 144,000 BTU · Vrf Outdoor ×7
ARUM192BTE5 192,000 BTU · Vrf Outdoor ×8
ARUM072BSS5 72,000 BTU · Vrf Outdoor ×6
ARUM216BTE5 216,000 BTU · Vrf Outdoor ×6
LG ARUM096BSS5 96,000 BTU · Vrf Outdoor ×6
ARUM168BTE5 168,000 BTU · Vrf Outdoor ×5
ARUM216BTE5 and ARUM121BTE5 336,000 BTU · Vrf Outdoor ×3
Ventilation
Vts AVS020-R-FRCV 2,200 CFM · Erv ×4
AVS030-R-FRCV 3,300 CFM · Erv ×4
AVS016-R-FRCV 1,750 CFM · Erv ×2
AVS065-R-FRCV 6,800 CFM · Erv ×2
1 project · most recent 01/27/2023
Water/Sanitary
FiledStatusContractorScope
01/27/2023Permit IssuedVMC PLUMBING & HEATING INWater/Sanitary
10 projects · most recent 03/05/2024
General Wiring HVAC Wiring
FiledStatusContractorScope
03/05/2024CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
11/30/2023CompleteFSM ELECTRICAL CORPORATIOHVAC Wiring
12/19/2022CompleteMEGA ELEC'L CONTR'G, INCGeneral Wiring
04/15/2022Permit Issued247 ELECTRICAL CORP—
04/02/2021Complete247 ELECTRICAL CORP—
02/25/2020Permit IssuedRICHARD NEU—
02/01/2019Permit IssuedROBERT S. COVELLOGeneral Wiring
02/01/2019Permit IssuedROBERT S. COVELLO—
07/24/2018Permit IssuedMEO ELECTRIC CORP—
12/19/2017CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 06/09/2026
Steel
FiledStatusContractorScope
06/09/2026Permit IssuedPA BUILDERS, INCSteel
2 projects · most recent 08/19/2025
Sidewalk Shed
FiledStatusContractorScope
08/19/2025Permit IssuedNEW SAFEWAY CONTRACTINGSidewalk Shed
02/21/2020Permit IssuedNEW SAFEWAY CONTRACTINGSidewalk Shed
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/03/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/03/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/29/2021Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
06/25/2026Fire-Resistant Penetrations and JointsHackjong Choispecial
06/25/2026HVAC-R and service water piping design and insulationHackjong Choienergy_progress
06/25/2026Duct leakage testing, insulation and designHackjong Choienergy_progress
06/25/2026HVAC-R and service water heating system controlsHackjong Choienergy_progress
06/25/2026Shutoff dampersHackjong Choienergy_progress
06/25/2026HVAC-R and service water heating equipmentHackjong Choienergy_progress
06/25/2026Maintenance informationHackjong Choienergy_progress
06/25/2026FinalJoel Mieleprogress
06/25/2026Structural Steel - DetailsHackjong Choispecial
06/25/2026Mechanical SystemsHackjong Choispecial
04/11/2025Sprinkler SystemsHackjong Choispecial
03/13/2025Shutoff dampersHackjong Choienergy_progress
03/13/2025Fire-Resistant Penetrations and JointsHackjong Choispecial
03/13/2025Mechanical SystemsHackjong Choispecial
03/13/2025Structural Steel - DetailsHackjong Choispecial
03/13/2025FinalJoel Mieleprogress
03/13/2025HVAC-R and service water heating equipmentHackjong Choienergy_progress
03/13/2025Duct leakage testing, insulation and designHackjong Choienergy_progress
03/13/2025HVAC-R and service water piping design and insulationHackjong Choienergy_progress
03/13/2025Maintenance informationHackjong Choienergy_progress
03/13/2025HVAC-R and service water heating system controlsHackjong Choienergy_progress
04/29/2023Interior lighting powerPAUL MARINOenergy_progress
04/29/2023Energy Code Compliance InspectionsPAUL MARINOprogress
04/29/2023UnderpinningPAUL MARINOspecial
04/29/2023Concrete - Cast-In-PlacePAUL MARINOspecial
Latest 25 of 38.
▾Documents — 266 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch12
08/28/2026Q00064277-I1Request digital key ↗
08/28/2026Q00082448-I1Request digital key ↗
08/27/2026Q00557961-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sign2
08/28/2026Q00082448-I1Request digital key ↗
08/28/2026Q00082448-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
08/28/2026Q00325331-I1Request digital key ↗
08/15/2026Q00325416-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
08/27/2026Q00451619-P1Request digital key ↗
08/15/2026Q00451619-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00315784-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026Q00443694-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026Q00254945-I1Request digital key ↗
▸Applications & Permits39
▸BISPLAN / WORK APPROVAL APPLICATION20
03/10/2023440561713Open ↗
11/04/2022440561713Open ↗
07/22/2022440561713Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION15
05/10/2022440561713Open ↗
07/21/2020440561713Open ↗
03/26/2019440514258Open ↗
Showing 3 of 15 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)2
07/21/2020440561713Open ↗
06/30/2017440407917Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
06/30/2017440407917Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
07/08/2020440561713Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00451619-P1Open ↗
08/13/2026Q00451619-I1Open ↗
▸BISZONING DIAGRAM1
09/19/2019440407917Open ↗
▸Seals & Professional Certifications58
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/28/2026Q00082448-P1Open ↗
08/28/2026Q00082448-I1Open ↗
08/28/2026Q00254945-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/30/2026Q00082448-I1Open ↗
09/01/2026Q00451619-I1Open ↗
09/01/2026Q00451619-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026Q01209850-I1Open ↗
09/01/2026Q00451619-I1Open ↗
09/01/2026Q00451619-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
06/03/2019440514258Open ↗
04/05/2018440241695Open ↗
04/12/2017421371731Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/02/2018440514258Open ↗
06/30/2017440407917Open ↗
02/16/2017421371731Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/02/2018440514258Open ↗
06/30/2017440407917Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/02/2018440514258Open ↗
06/30/2017440407917Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
10/04/2019440561713Open ↗
12/15/2015440241695Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/16/2017421371731Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
04/11/2018440407917Open ↗
03/30/2018440407917Open ↗
02/08/2018440407917Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00451619-P1Open ↗
08/13/2026Q00451619-I1Open ↗
▸BISSCHEDULE B - PLUMBING1
06/30/2017440407917Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/26/2018440241695Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
02/16/2017421371731Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/28/2026Q00082448-I1Open ↗
08/28/2026Q00082448-P1Open ↗
08/27/2026Q00451619-P1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/18/2019440561713Open ↗
06/30/2017440407917Open ↗
02/16/2017421371731Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/14/2020440561713Open ↗
11/18/2019440561713Open ↗
11/02/2018440514258Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/03/2019440514258Open ↗
04/05/2018440241695Open ↗
04/12/2017421371731Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
06/03/2019440514258Open ↗
04/05/2018440241695Open ↗
04/12/2017421371731Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/02/2018440514258Open ↗
06/30/2017440407917Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/05/2023440561713Open ↗
▸BISINTERIOR LIGHTING POWER1
04/05/2023440561713Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/05/2023440561713Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/05/2023440561713Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/05/2023440561713Open ↗
▸BISLIGHTING CONTROLS1
04/05/2023440561713Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/05/2023440561713Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00451619-I1Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY8
08/30/2022440561713Open ↗
07/14/2020440561713Open ↗
11/18/2019440561713Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026Q00451619-I1Open ↗
08/13/2026Q00451619-P1Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
04/05/2023440561713Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
04/05/2023440561713Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/05/2023440561713Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00451619-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00451619-I1Open ↗
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/25/2026Q00676503-P1Open ↗
08/25/2026Q00676503-I1Open ↗
08/16/2026Q00836218-I1Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
05/10/2022440561713Open ↗
04/30/2020440561713Open ↗
04/30/2020440561713Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/03/2019440514258Open ↗
04/17/2018440241695Open ↗
04/12/2017421371731Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT9
11/18/2019440561713Open ↗
06/03/2019440514258Open ↗
11/02/2018440514258Open ↗
Showing 3 of 9 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE6
05/10/2022440561713Open ↗
07/21/2020440561713Open ↗
09/19/2018440407917Open ↗
Showing 3 of 6 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
07/21/2020440561713Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026Q00451619-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026Q00451619-I1Open ↗
▸Filing & Intake Forms27
▸BISADDITIONAL INFORMATION18
05/25/2023440561713Open ↗
11/15/2022440561713Open ↗
10/28/2022440561713Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM4
02/03/2020440407917Open ↗
02/08/2018440407917Open ↗
02/07/2018440241695Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/04/2019440561713Open ↗
11/02/2018440514258Open ↗
06/30/2017440407917Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
02/16/2017421371731Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial2
08/13/2026Q00451619-I1Open ↗
08/13/2026Q00451619-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00451619-I1Open ↗
08/13/2026Q00451619-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00451619-I1Open ↗
08/13/2026Q00451619-P1Open ↗
▸BISPLOT DIAGRAM1
04/10/2018440407917Open ↗
▸BISVESTIBULES1
04/05/2023440561713Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
04/05/2023440561713Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026Q00064277-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026Q00451619-I1Open ↗