← Back
Predominantly retail with other uses
8701 4 AVENUE
BROOKLYN · BIN 3153753
💬 Discuss this project
1926Year Built
2Stories
K4Building Class
C4-2AZoning
36,500 sfGross Floor Area
2Units
LL97 Covered1 Open Violation ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 8701 FOURTH AVENUE LLC · 11,099 sf lot · 3.29 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 6 docs
Floor 21p · 1 filing · 3 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARBOR FITNESS707/08/2026
HKS CONSTRUCTION807/08/2026
DII ENTERPRISES4307/08/2026
8701 FOURTH AVENUE2503/22/2026
CENTURY MANAGEMENT103/22/2026
8701 4TH AVE703/22/2026
OWNER OF 8701 4 AVENUE103/22/2026
B D STORE INC103/22/2026
RCY CONSTRUCTION103/22/2026
EXOTIC DESIGN WIRE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR403/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
KSTM EXPEDIRING SERVICES103/21/2026
S R SOLAR DESIGN203/21/2026
4444 PPPP CORP203/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HKS CONSTRUCTION CORPGeneral Contractor707/08/2026
CRITICAL TEMP, INCGeneral Contractor303/21/2026
CITY SIGNSScaffold207/08/2026
T.M.T ELECTRIC INCElectrical103/22/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
DEMHA TILE INCGeneral Contractor107/08/2026
MAC ELECT'L CONTR. INC.Electrical103/22/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244111/05/2025
AA BUILDING & INSPECTION1519106/21/2023
Building Lifecycle
All (55)Filed (6)Permit Issued (7)Signed Off (4)Violation (26)Special Inspection (12)
02/12/2026
Permit issued — Solar
B01310226-I1-SL
11/21/2025
Violation issued (ECB, closed)
Construction
11/05/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01310226-I1
10/29/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
10/29/2025
Special inspection requirement — Final
NARESH MAHANGU
12/10/2024
Violation issued (FDNY_NOV, closed)
07/10/2023
Signed off — Alteration
Propose to directly replace (2) 7.5 Packaged Roof Top units and (1) 15 ton roof top packaged unit on existing steel dunnage at roof, all as per plans filed herewith. There is no change in use occupancy or egress under this application.
B00860931-I1
06/30/2023
Permit issued — Mechanical Systems
B00860931-I1-MS
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2023
Filed — Alteration
Propose to directly replace (2) 7.5 Packaged Roof Top units and (1) 15 ton roof top packaged unit on existing steel dunnage at roof, all as per plans filed herewith. There is no change in use occupancy or egress under this application.
B00860931-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/16/2023
Special inspection requirement — Permanent certificate
Younes Abouyaala
06/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
06/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
06/16/2023
Special inspection requirement — Maintenance information
Younes Abouyaala
06/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/18/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/18/2023
Special inspection requirement — Final
NAVEEN KUMAR
06/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/29/2019
Filed — No Work
B00139757-I1
05/24/2019
Violation issued (FDNY_ORDER, closed)
04/29/2019
Signed off — Alteration
B00120116-I1
04/29/2019
Signed off — Alteration
B00120092-I1
02/14/2019
Permit issued — Sign
B00120116-I1-SG
02/14/2019
Permit issued — Sign
B00120092-I1-SG
02/07/2019
Filed — Alteration
B00120116-I1
02/07/2019
Filed — Alteration
B00120092-I1
09/05/2018
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00010422-I1
07/13/2018
Permit issued — Sidewalk Shed
B00010422-I1-SH
03/08/2018
Permit issued — Sidewalk Shed
B00010422-I1-SH
01/11/2018
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00010422-I1
01/11/2018
Permit issued — Sidewalk Shed
B00010422-I1-SH
01/10/2018
Special inspection requirement — Final
JAFAR HAIDER
10/11/2017
Violation issued (ECB, closed)
Construction
10/11/2017
Violation issued (ECB, closed)
Construction
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/29/2010
Violation issued (ECB, closed)
Construction
07/29/2010
Violation issued (ECB, closed)
Construction
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/09/2007
Violation issued (ECB, closed)
Zoning
06/10/2006
Violation issued (ECB, closed)
Construction
06/04/2003
Violation issued (ECB, closed)
Construction
04/12/2001
Violation issued (ECB, closed)
Construction
04/12/2001
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/13/1995
Violation issued (ECB, closed)
Site Safety
04/26/1995
Violation issued (ECB, closed)
Construction
06/19/1994
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
03/16/1994
Violation issued (DOB, closed)
V%*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedDEMHA TILE INC02/12/2026
DOB NOWMechanical SystemsSigned-offCRITICAL TEMP, INC06/30/2023
DOB NOWSignSigned-offELMER DAWSON02/14/2019
DOB NOWSignSigned-offELMER DAWSON02/14/2019
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP07/13/2018
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP03/08/2018
DOB NOWSidewalk ShedSigned-offHKS CONSTRUCTION CORP01/11/2018
BISSPISSUEDTRISTATE FIRE SPRINK INC01/16/2020
BIS—ISSUEDEXOTIC DESIGN & WIRE LLC03/25/2019
BIS—ISSUEDEXOTIC DESIGN & WIRE LLC03/20/2019
BISMHISSUEDEXOTIC DESIGN & WIRE LLC03/20/2019
BISOTISSUEDEXOTIC DESIGN & WIRE LLC03/20/2019
BISMHISSUEDEXOTIC DESIGN & WIRE LLC01/30/2019
BISMHISSUEDEXOTIC DESIGN & WIRE LLC12/06/2018
BISPLISSUEDNOPHIER PLUMBING & HTG IN11/27/2018
BISPLISSUEDNOPHIER PLUMBING & HTG IN10/31/2018
BISEQISSUEDEXOTIC DESIGN & WIRE LLC10/15/2018
BISEQISSUEDSILVERCUP SCFFLDNG I LLC10/10/2018
BISSDISSUEDTRISTATE FIRE SPRINK INC10/01/2018
BISOTISSUEDEXOTIC DESIGN & WIRE LLC08/28/2018
BIS—ISSUEDEXOTIC DESIGN & WIRE LLC03/20/2018
BIS—ISSUEDEXOTIC DESIGN & WIRE LLC03/20/2018
BIS—ISSUEDEXOTIC DESIGN & WIRE LLC03/20/2018
BIS—ISSUEDEXOTIC DESIGN & WIRE LLC03/16/2018
BISPLISSUEDNOPHIER PLUMBING & HTG IN11/30/2017
BIS—ISSUEDEXOTIC DESIGN & WIRE LLC10/27/2017
BIS—ISSUEDEXOTIC DESIGN & WIRE LLC10/27/2017
BISEQISSUEDEXOTIC DESIGN & WIRE LLC10/27/2017
BISPLISSUEDJADA PLUMBING & HTG LLC11/30/2016
BISMHISSUEDCOMJEM ASSOCIATES LTD02/11/2016
BISSPISSUEDC.W.C. FIRE SUPPRESSION12/22/2014
BISPLISSUEDC.W.C. FIRE SUPPRESSION12/22/2014
BISPLISSUEDPETER MICELI PLUMBING06/07/2013
BISOTISSUEDVASMO CORPORATION02/02/2012
BISPLISSUEDPFEIFFER P,HTG,SPKL CONT02/02/2012
BISOTISSUEDB & B IRON WORKS CORP05/03/2010
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO07/09/2003
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO07/09/2003
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO03/18/2002
BISMHISSUEDROBBINS & COWAN INC01/25/2002
+ 10 more permits on file
10 projects · most recent 01/15/2026
General Wiring
FiledStatusContractorScope
01/15/2026Permit IssuedTRINITY METRO ELECL CORPGeneral Wiring
11/04/2025CompleteELECTRIC A/C INC—
02/19/2021CompleteGEMINI ELECTRIC CO., INC.General Wiring
10/18/2019CompleteT.M.T ELECTRIC INCGeneral Wiring
10/18/2019CompleteT.M.T ELECTRIC INC—
10/18/2019CompleteT.M.T ELECTRIC INC—
03/14/2019CompleteMAC ELECT'L CONTR. INC.General Wiring
08/16/2018CompleteSTAR ELEC'L CONTRACTORS C—
01/10/2018Complete4000 ELECTRIC CORP—
01/04/2018CompleteV. VASS ELECTRIC CORP—
1 project · most recent 11/05/2025
FiledStatusContractorScope
11/05/2025Permit IssuedDEMHA TILE INC124 panels, 66.96 kw, 10,651 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/29/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
10/29/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/29/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
10/29/2025FinalNARESH MAHANGUprogress
06/16/2023Permanent certificateYounes Abouyaalaenergy_progress
06/16/2023HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
06/16/2023HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
06/16/2023Maintenance informationYounes Abouyaalaenergy_progress
06/16/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/18/2023Mechanical SystemsYounes Abouyaalaspecial
04/18/2023FinalNAVEEN KUMARprogress
01/10/2018FinalJAFAR HAIDERprogress
▾Documents — 412 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch3
09/03/2026B00010422-I1Request digital key ↗
08/27/2026B00860931-I1Request digital key ↗
08/20/2026B01310226-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
09/02/2026B00120116-I1Request digital key ↗
09/02/2026B00120092-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
09/02/2026B00139757-I1Request digital key ↗
▸Applications & Permits88
▸BISPLAN / WORK APPROVAL APPLICATION50
03/24/2020321171307Open ↗
03/05/2020321815489Open ↗
02/28/2020321171307Open ↗
Showing 3 of 50 on file for this type
▸BISWORK PERMIT APPLICATION25
03/25/2019321171307Open ↗
03/21/2019321815489Open ↗
03/21/2019321171307Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION8
02/29/2020321815489Open ↗
02/25/2020321171307Open ↗
01/30/2020321612215Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
03/21/2019321171307Open ↗
03/13/2019321171307Open ↗
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/11/2019321171307Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
01/06/2020301290537Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/11/2019321171307Open ↗
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications69
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
03/17/2020321815489Open ↗
03/17/2020321815489Open ↗
03/17/2020321815489Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/28/2026B00860931-I1Open ↗
08/28/2026B00860931-I1Open ↗
08/28/2026B00860931-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026B00010422-I1Open ↗
09/02/2026B00120116-I1Open ↗
09/02/2026B00120092-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/09/2018340631472Open ↗
08/13/2018321815489Open ↗
08/13/2018321815489Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/13/2018321815489Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00860931-I1Open ↗
08/25/2026B01310226-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/09/2018340631472Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/09/2018340631472Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment47
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
02/27/2019321815489Open ↗
02/26/2019321815489Open ↗
02/26/2019321815489Open ↗
Showing 3 of 15 on file for this type
▸BISEQUIPMENT USE PERMITS12
03/28/2020321815489Open ↗
03/28/2020321815489Open ↗
03/28/2020321815489Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING5
03/24/2020321171307Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
03/28/2020321815489Open ↗
03/13/2020321171307Open ↗
04/30/2019321851518Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCANTILEVER FIRE ANALYSIS APPROVED BY DOB & FDNY2
05/07/2020321171307Open ↗
04/29/2020321171307Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
02/18/2020321320156Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
04/13/2018321612215Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
04/05/2019321171307Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos14
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
10/19/2018321851518Open ↗
08/13/2018321815489Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026B00120116-I1Open ↗
09/02/2026B00120092-I1Open ↗
08/13/2026B01310226-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
04/30/2019321851518Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
03/17/2020321815489Open ↗
03/17/2020321815489Open ↗
03/12/2020321815489Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/17/2020321815489Open ↗
07/18/2019321171307Open ↗
04/30/2019321851518Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports10
▸BISHYDRO FLOW TEST LETTER3
04/13/2018321612215Open ↗
Showing 1 of 3 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
04/29/2020321171307Open ↗
11/20/2019340631472Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/07/2018321171307Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
06/29/2018321171307Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs45
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
05/06/2020321171307Open ↗
03/28/2020321815489Open ↗
03/18/2020321815489Open ↗
Showing 3 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
05/01/2020321171307Open ↗
08/20/2019321320156Open ↗
Showing 2 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
02/28/2020321171307Open ↗
03/26/2019321171307Open ↗
04/12/2018321171307Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT23
05/06/2020321171307Open ↗
03/17/2020321815489Open ↗
02/22/2020321612215Open ↗
Showing 3 of 23 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
03/25/2019321171307Open ↗
03/21/2019321171307Open ↗
Showing 2 of 4 on file for this type
▸BISWELDERS AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms63
▸BISBOROUGH INTAKE FORM23
03/28/2020321815489Open ↗
03/18/2020321815489Open ↗
03/12/2020321171307Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET20
10/19/2018321851518Open ↗
08/13/2018321815489Open ↗
08/13/2018321815489Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION19
02/21/2020321815489Open ↗
02/21/2020321815489Open ↗
01/24/2020301290537Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/09/2018340631472Open ↗
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
07/11/2019321171307Open ↗
01/29/2019321851518Open ↗
Showing 2 of 7 on file for this type
▸BISPLOT DIAGRAM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/03/2026B00010422-I1Open ↗