← Back
BuildNYC
Miscellaneous one family
878 GAR TIFFANY STREET
BRONX · Hunts Point · BIN 2116498
💬 Discuss this project
1910Year Built
3Stories
A9Building Class
R7-1Zoning
4,535 sfGross Floor Area
1Units
2 Active Violations 1 unresolved · 1 paperwork only ▸
Miscellaneous one family · Owner of record: R C Church St Athanas · 1,350 sf lot · 3.36 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorMasonry parapet repair for ECB violation2p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
R C Church St Athanas103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sam Mather Architect201/03/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Oasis PlomoScaffold303/21/2026
Oasis PlomoGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sam Mather Architect773101/03/2024
Building Lifecycle
02/23/2024
Signed off — Alteration
ECB VIOLATION 039101665K: ENTIRE LENGTH OF MASONRY FRONT PARAPET ( APPROX. 25-LINER FEET ) COLLAPSED ON TO PED. SIDEWALK AT EXPOSURE # 04 ALONG SOUTHERN BLVD. REMAINING SECTION HAS CRACKS, LOOSE AND DETERIORATED CONDITION. NO CHANGE IN USE, EGRESS OR OCC
X00981068-I1
02/21/2024
Signed off — Alteration
ERECT TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
X00980707-I1
02/21/2024
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
02/21/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/09/2024
Permit issued — General Construction
X00981068-I1-GC
15 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offOasis Plomo01/09/2024
DOB NOWConstruction FenceSigned-offOasis Plomo12/29/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/21/2024Pass-Final Fence Non-Directive 14PassView ↗
02/21/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/21/2023MasonrySAMUEL MATHERspecial
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account