Public elementary, junior or senior high
179-01 90 AVENUE
QUEENS · BIN 4624455
💬 Discuss this project
1932Year Built
4Stories
W1Building Class
R4-1Zoning
109,400 sfGross Floor Area
0Units
LL97 Covered20 Open Violations 4 unresolved · 16 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 62,339 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction81p · 2 filings · 20 docs
Floor 4Under Construction9p · 1 filing · 20 docs
Floor 3Under Construction99p · 2 filings · 20 docs
Floor 2Under Construction98p · 2 filings · 20 docs
Floor 1Under Construction100p · 2 filings · 20 docs
CellarUnder Construction102p · 2 filings · 20 docs
Sub-BasementUnder Construction21p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION1809/13/2026
NYC SCHOOL CONSTRUCTION AUTHORITY6208/11/2026
NAVILLUS CONTRACTING404/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES5203/21/2026
JMV ASSOCIATES LLC603/21/2026
LOMBARDO PROFESSIONAL ENGINEERING103/21/2026
TAREK M ZEID P E603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NAVILLUS TILE INCGeneral Contractor2907/08/2026
MARIC PLBG & HTG INCFire Protection606/28/2026
NORTH SHORE CLIMATE CONTRGeneral Contractor606/28/2026
PAR PLUMBING CO., INCPlumbing508/11/2026
PHASE 1 GROUP INCGeneral Contractor303/21/2026
PHASE 1 GROUP INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP ENGINEERS & ARCHITECTS1438407/30/2026
TECTONIC ENGINEERING CONS1063107/30/2026
Building Lifecycle
All (187)Filed (42)Permit Issued (44)Signed Off (4)Violation (6)Inspection (18)Objection (43)Special Inspection (30)
08/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/21/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/21/2026
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
08/21/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Lighting controls
JAMES WILSON
08/12/2026
Special inspection requirement — Structural Cold-Formed Steel
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
John Pizzi
08/12/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Air barrier — testing
JAMES WILSON
08/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES WILSON
08/12/2026
Special inspection requirement — Exterior lighting power
JAMES WILSON
08/12/2026
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
08/12/2026
Special inspection requirement — Air barrier - visual inspection
JAMES WILSON
08/12/2026
Special inspection requirement — Interior lighting power
JAMES WILSON
08/12/2026
Special inspection requirement — Fenestration areas
JAMES WILSON
08/12/2026
Special inspection requirement — Vestibules
JAMES WILSON
08/12/2026
Special inspection requirement — Fenestration air leakage
JAMES WILSON
08/10/2026
Filed — No Work
Q00841868-P1
08/10/2026
Permit issued — Plumbing
Q08023576-S2-PL
08/07/2026
Special inspection requirement — Public Assembly Emergency Lighting
GEORGE GHEBRYAL
08/04/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
08/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
GEORGE GHEBRYAL
08/03/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
GEORGE GHEBRYAL
07/31/2026
Special inspection requirement — Air barrier — testing
JAMES WILSON
07/30/2026
Filed — New Building
P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, electric heating coils and exhaust fans.
Q08023576-B3
07/30/2026
Filed — New Building
P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, electric heating coils and exhaust fans.
Q08023576-B2
07/29/2026
Special inspection requirement — Mechanical Systems
JAMES WILSON
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/27/2026
Objection resolved — Addressed
07/24/2026
Filed — New Building
P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, electric heating coils and exhaust fans.
Q08023576-B1
07/21/2026
Objection resolved — Addressed
07/20/2026
Signed off — Alteration
SOE FOR 4 STORY NEW SCHOOL ADDITION.
Q00990552-I1
07/17/2026
Signed off — Alteration
SUPPORTED SCAFFOLD FILED IN CONJUNCTION WITH 4 STORY ADDITION TO SCHOOL BUILDING Q08023576. ALL AS PER PLANS FILED HEREWITH.
Q01245728-I1
07/17/2026
Signed off — Alteration
SIDEWALK SHED FILED IN CONJUNCTION WITH 4 STORY ADDITION TO SCHOOL BUILDING Q08023576. ALL AS PER PLANS FILED HEREWITH.
Q00979347-I1
07/16/2026
Objection raised — Other
07/13/2026
Filed — Alteration
P.S. 95-Q: SPRINKLER AND STANDPIPE SYSTEM FOR A NEW SCHOOL BUILDING.
Q08034682-P2
07/10/2026
Filed — New Building
P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, electric heating coils and exhaust fans.
Q08023576-A6
07/06/2026
Objection raised — Other
07/02/2026
Filed — New Building
P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, electric heating coils and exhaust fans.
Q08023576-A8
06/26/2026
Permit issued — General Construction
Q08023576-I1-FO
06/26/2026
Permit issued — Structural
Q08023576-I1-ST
06/26/2026
Permit issued — Support of Excavation
Q08023576-S9-SE
06/26/2026
Permit issued — General Construction
Q08023576-S1-GC
06/26/2026
Permit issued — General Construction
Q08023576-S8-GC
06/24/2026
Permit issued — Structural
Q08023576-I1-GC
06/22/2026
Permit issued — Sprinklers
Q08034682-I1-EW-SP
06/22/2026
Permit issued — Sprinklers
Q08034682-I1-EW-SD
06/17/2026
Objection raised — Other
06/16/2026
Filed — New Building
P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, electric heating coils and exhaust fans.
Q08023576-A9
05/14/2026
Signed off — Alteration
95Q- SOE/Utilities for onsite drainage system & site utilities & plumbing, filed in conjunction with New 4 story school building # Q08023576
Q01146750-I1
Latest 60 of 187 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC08/10/2026
DOB NOWGeneral ConstructionPermit IssuedNAVILLUS TILE INC06/26/2026
DOB NOWStructuralPermit IssuedNAVILLUS TILE INC06/26/2026
DOB NOWSupport of ExcavationPermit IssuedNAVILLUS TILE INC06/26/2026
DOB NOWGeneral ConstructionPermit IssuedNAVILLUS TILE INC06/26/2026
DOB NOWGeneral ConstructionPermit IssuedNAVILLUS TILE INC06/26/2026
DOB NOWStructuralPermit IssuedNAVILLUS TILE INC06/24/2026
DOB NOWSprinklersPermit IssuedMARIC PLBG & HTG INC06/22/2026
DOB NOWSprinklersPermit IssuedMARIC PLBG & HTG INC06/22/2026
DOB NOWMechanical SystemsPermit IssuedNORTH SHORE CLIMATE CONTR04/14/2026
DOB NOWPlumbingPermit IssuedPHASE 1 GROUP INC04/06/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedNAVILLUS TILE INC03/31/2026
DOB NOWConstruction FencePermit IssuedNAVILLUS TILE INC03/30/2026
DOB NOWMechanical SystemsPermit IssuedNORTH SHORE CLIMATE CONTR02/17/2026
DOB NOWPlumbingPermit IssuedPHASE 1 GROUP INC02/12/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedNAVILLUS TILE INC12/15/2025
DOB NOWSidewalk ShedSigned-offNAVILLUS TILE INC10/31/2025
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC10/14/2025
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC09/08/2025
DOB NOWSupport of ExcavationSigned-offNAVILLUS TILE INC08/29/2025
DOB NOWGeneral ConstructionPermit IssuedNAVILLUS TILE INC08/27/2025
DOB NOWSprinklersPermit IssuedMARIC PLBG & HTG INC07/23/2025
DOB NOWSprinklersPermit IssuedMARIC PLBG & HTG INC07/23/2025
DOB NOWSupported ScaffoldSigned-offNAVILLUS TILE INC07/21/2025
DOB NOWStandpipePermit IssuedMARIC PLBG & HTG INC07/18/2025
DOB NOWStandpipePermit IssuedMARIC PLBG & HTG INC07/18/2025
DOB NOWConstruction FencePermit IssuedNAVILLUS TILE INC05/13/2025
DOB NOWGeneral ConstructionPermit IssuedNORTH SHORE CLIMATE CONTR05/12/2025
DOB NOWSupport of ExcavationPermit IssuedNAVILLUS TILE INC04/24/2025
DOB NOWMechanical SystemsPermit IssuedNORTH SHORE CLIMATE CONTR04/03/2025
DOB NOWGeneral ConstructionPermit IssuedNAVILLUS TILE INC04/02/2025
DOB NOWGeneral ConstructionPermit IssuedNAVILLUS TILE INC04/02/2025
DOB NOWStructuralPermit IssuedNAVILLUS TILE INC04/01/2025
DOB NOWGeneral ConstructionPermit IssuedNAVILLUS TILE INC04/01/2025
DOB NOWSupport of ExcavationSigned-offPHASE 1 GROUP INC03/28/2025
DOB NOWStructuralPermit IssuedNAVILLUS TILE INC03/28/2025
DOB NOWPlumbingPermit IssuedPHASE 1 GROUP INC02/12/2025
DOB NOWSidewalk ShedSigned-offNAVILLUS TILE INC10/31/2024
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC10/08/2024
DOB NOWFoundationPermit IssuedNAVILLUS TILE INC10/08/2024
+ 4 more permits on file
1 project · most recent 07/30/2026
Air Conditioning Systems Heating Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2026Permit IssuedNAVILLUS TILE INCAir Conditioning Systems, Heating Systems, Refrigeration Systems, Ventilation Systems
Cooling
Lg LSN363HLV3 36,000 BTU · Split System ×4
LSU363HLV3 36,000 BTU · Condensing Unit ×4
LAN180HYV3 18,000 BTU · Vrf Indoor ×2
LAU180HYV3 18,000 BTU · Condensing Unit ×2
LSN120HSV5 12,000 BTU · Split System ×2
LSU120HSV5 12,000 BTU · Condensing Unit ×2
Annexair AHU-E-07-HE-D-HR-SS-AZP40.4 Ventilation Systems: Capacity 7300 CFM, Efficiency 18 SEER Heating Systems: Capacity 4500 CFM, Efficiency 18 SEER 438,000 BTU · Rooftop Unit ×2
ERP-E-12-EW04-HE-D-HR-SS-AZP50.4 Ventilation System Capacity 13500 CFM, Efficiency 18 SEER Heating System: Capacity 5700 CFM, Efficiency 18 SEER 594,000 BTU · Rooftop Unit ×2
400ERP-E-12-EW04-HE-D-HR-SS-ASP48.8 13,000 CFM · Rooftop Unit ×2
450ERP-E-12-EW04-HE-D-HR-SS-ASP48.8 13,500 CFM · Rooftop Unit ×2
AHU-E-07-HE-D-HR-SS-ASP40.4 7,300 CFM · Rooftop Unit ×2
Heating
Annexair ERP-E-12-EW04-HE-D-HR-SS-AZP50.4 Ventilation Systems: Capacity 13000 CFM, Efficiency 18 SEER Air Conditioning Capacity 594000 BTU, Efficiency 18 SEER 5,000 CFM · Rooftop Unit ×2
400ERP-E-12-EW04-HE-D-HR-SS-ASP48.8 5,000 BTU · Rooftop Unit ×2
450ERP-E-12-EW04-HE-D-HR-SS-ASP48.8 5,700 CFM · Rooftop Unit ×2
AHU-E-07-HE-D-HR-SS-ASP40.4 4,500 CFM · Rooftop Unit ×2
Ventilation
Twin City Fan DSI-080AE 350 CFM · Exhaust Fan ×6
VC-120 500 CFM · Exhaust Fan ×4
080AW 350 CFM · Exhaust Fan ×1
100AE 1,000 CFM · Exhaust Fan ×2
BCRU-360BHP 12,000 CFM · Exhaust Fan ×2
BCVR 182 3,650 CFM · Exhaust Fan ×2
DCRD-170BE 2,550 CFM · Exhaust Fan ×2
DSI-090AE 225 CFM · Exhaust Fan ×2
VC-089 225 CFM · Exhaust Fan ×2
DSI-080AW 350 CFM · Exhaust Fan ×1
Pennbarry Z8GP 200 CFM · Exhaust Fan ×2
Greenheck G-98-VG 500 CFM · Exhaust Fan ×4
CSP-A290 200 CFM · Exhaust Fan ×2
CSP-A390-VG 250 CFM · Exhaust Fan ×2
CUBE-360HP-75 12,000 CFM · Exhaust Fan ×2
G-200HP-VG 2,550 CFM · Exhaust Fan ×2
G-97-VG 225 CFM · Exhaust Fan ×2
SQ-7-M1-VG 1,000 CFM · Exhaust Fan ×2
SQ-80-VG 250 CFM · Exhaust Fan ×2
SQ-95-VG 350 CFM · Exhaust Fan ×2
SQ-97-VG 225 CFM · Exhaust Fan ×2
SQ-98-VG 350 CFM · Exhaust Fan ×2
USF-20 3,650 CFM · Exhaust Fan ×2
Refrigeration
Kolpak AM26-094-1ECAFOEM-P 10 BTU · Condensing Unit ×4
EL26-090-2ECAFOEM-P 11 BTU · Condensing Unit ×4
MC-9.0-04-Z-2-OP-3 1 tons · Condensing Unit ×4
— ZF11KAE-TF5 / 348LZ 11 BTU · Condensing Unit ×4
ZS09KAE-TF5 / 98MZ 10 BTU · Condensing Unit ×4
1 project · most recent 07/13/2026
FiledStatusContractorScope
07/13/2026Permit IssuedMARIC PLBG & HTG INC793 heads, 17 outlets
1 project · most recent 07/30/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/30/2026Permit IssuedPAR PLUMBING CO., INCStorm, Water/Sanitary
6 projects · most recent 05/20/2025
General Wiring Lighting
FiledStatusContractorScope
05/20/2025Permit IssuedRMD ELECTRIC CORP—
05/20/2025Permit IssuedRMD ELECTRIC CORP—
05/01/2025Permit IssuedTITAN ELEC'L & ELEV CONTR—
02/14/2025Permit IssuedRMD ELECTRIC CORP1 meters, 1 new_meters
10/21/2024Permit IssuedRMD ELECTRIC CORPGeneral Wiring, Lighting
10/21/2024Permit IssuedRMD ELECTRIC CORP—
3 projects · most recent 07/30/2026
Steel Concrete Masonry
FiledStatusContractorScope
07/30/2026Permit IssuedPAR PLUMBING CO., INCSteel, Concrete, Masonry
11/26/2024Signed-offPHASE 1 GROUP INC1 scope_items
01/16/2024Signed-offNAVILLUS TILE INC1 scope_items
3 projects · most recent 07/30/2025
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
07/30/2025Signed-offNAVILLUS TILE INCScaffold
05/02/2025Signed-offNAVILLUS TILE INCSidewalk Shed
05/02/2025Permit IssuedNAVILLUS TILE INCFence
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
08/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/21/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/21/2026Pass-Final SD - Up to 9 Requested FloorsPassView ↗
08/21/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
02/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/04/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/21/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
05/21/2025Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
04/29/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/05/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
05/28/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/16/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/04/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/12/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
08/12/2026Structural Cold-Formed SteelGEORGE GHEBRYALspecial
08/12/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
08/12/2026Post-installed AnchorsGEORGE GHEBRYALspecial
08/12/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
08/12/2026Interior lighting powerJAMES WILSONenergy_progress
08/12/2026Fenestration areasJAMES WILSONenergy_progress
08/12/2026VestibulesJAMES WILSONenergy_progress
08/12/2026Fenestration air leakageJAMES WILSONenergy_progress
08/12/2026Lighting controlsJAMES WILSONenergy_progress
08/12/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
08/12/2026Wall Panels, Curtain Walls, and VeneersGEORGE GHEBRYALspecial
08/12/2026Subgrade InspectionsGEORGE GHEBRYALspecial
08/12/2026Subsurface Investigations (Borings/Test Pits)John Pizzispecial
08/12/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
08/12/2026FinalGEORGE GHEBRYALprogress
08/12/2026Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
08/12/2026Footing and FoundationGEORGE GHEBRYALprogress
08/12/2026Air barrier — testing JAMES WILSONenergy_progress
08/12/2026Fenestration and door U-factor and product ratingsJAMES WILSONenergy_progress
08/12/2026Exterior lighting powerJAMES WILSONenergy_progress
08/12/2026Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
08/12/2026Air barrier - visual inspectionJAMES WILSONenergy_progress
08/07/2026Public Assembly Emergency LightingGEORGE GHEBRYALprogress
08/04/2026Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
Latest 25 of 150.
▾Documents — 477 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch40
08/23/2026Q00990552-I1Request digital key ↗
08/21/2026Q01146750-I1Request digital key ↗
08/20/2026Q00979319-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/25/2026Q00841868-I1Request digital key ↗
08/25/2026Q00841868-P1Request digital key ↗
▸Applications & Permits2
▸DOB NOWDEP Stormwater Construction Permit2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications214
▸DOB NOWProgress Inspector Seal & Signature94
09/02/2026Q08023576-P1Open ↗
09/02/2026Q08023576-P1Open ↗
09/02/2026Q08023576-P1Open ↗
Showing 3 of 94 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature78
09/26/2026Q08034682-I1Open ↗
09/26/2026Q08034682-I1Open ↗
09/26/2026Q08034682-I1Open ↗
Showing 3 of 78 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature42
08/25/2026Q00841868-I1Open ↗
08/25/2026Q00841868-P1Open ↗
08/20/2026Q00979347-I1Open ↗
Showing 3 of 42 on file for this type
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Safety & Tenant Protection24
▸DOB NOWStreet Tree Checklist13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWNYCSCA - Approved Site Safety Plans7
08/20/2026Q00979347-I1Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs86
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter42
08/25/2026Q00841868-I1Open ↗
08/25/2026Q00841868-P1Open ↗
08/20/2026Q00979347-I1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)39
08/20/2026Q00979347-I1Open ↗
Showing 1 of 39 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/23/2026Q00990552-I1Open ↗
08/21/2026Q01146750-I1Open ↗
08/20/2026Q00979347-I1Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms2
▸DOB NOWAI1 Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents81
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal42
08/25/2026Q00841868-I1Open ↗
08/25/2026Q00841868-P1Open ↗
08/20/2026Q00979347-I1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSite Survey: Initial13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWProperty Ownership Certification5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWNYCSCA Exhibit 24
08/23/2026Q00990552-I1Open ↗
08/21/2026Q01146750-I1Open ↗
08/20/2026Q00979347-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type