Elevator cooperative
880 5 AVENUE
MANHATTAN · BIN 1041291
💬 Discuss this project
1948Year Built
20Stories
D4Building Class
R10Zoning
322,346 sfGross Floor Area
170Units
LL97 CoveredRent Stabilized37 Open Violations 34 unresolved · 3 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 880 FIFTH AVENUE CORPORATION · 29,283 sf lot · 11.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 2 filings · 17 docs
Floor 20Under Construction4p · 1 filing · 12 docs
Floor 19Under Construction4p · 1 filing · 12 docs
Floor 18Under Construction4p · 1 filing · 12 docs
Floor 17Under Construction4p · 1 filing · 12 docs
Floor 16Under Construction4p · 1 filing · 12 docs
Floor 15Under Construction4p · 1 filing · 12 docs
Floor 14Under Construction5p · 2 filings · 18 docs
Floor 13Under Construction4p · 1 filing · 12 docs
Floor 12Under Construction4p · 1 filing · 12 docs
Floor 11Under Construction5p · 2 filings · 20 docs
Floor 10Under Construction4p · 1 filing · 12 docs
Floor 9Under Construction4p · 1 filing · 12 docs
Floor 8Under Construction4p · 1 filing · 12 docs
Floor 7Under Construction22p · 4 filings · 20 docs
Floor 6Under Construction8p · 2 filings · 20 docs
Floor 5Under Construction9p · 4 filings · 20 docs
Floor 4Under Construction4p · 1 filing · 12 docs
Floor 3Under Construction13p · 3 filings · 20 docs
Floor 2Under Construction10p · 5 filings · 20 docs
Floor 1Under Construction20p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY2307/19/2026
BROWN HARRIS STEVENS6307/08/2026
880 FIFTH AVENUE12103/22/2026
WILLIAM K CONSTRUCTION OF503/22/2026
880 5TH AVENUE10803/22/2026
CERCONE EXTERIOR REST COR103/22/2026
880 5TH CORP BHS103/22/2026
BASONAS CONSTRUCTION103/22/2026
BROWN HARRIS STEVENS RESIDENTIAL1303/22/2026
OWNER OF 880 5 AVENUE103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEXUS CONSULTING NYC, INC1803/21/2026
4444 PPPP CORP1603/21/2026
NOEL BUILDING CONSULTING INC1003/21/2026
KX CONSULTING1803/21/2026
QUICK FILING OF NY INC903/21/2026
BUILTIN STUDIO303/21/2026
AE DESIGN SOLUTION1003/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
JAM CONSULTANTS, INC.203/21/2026
SOL BUILDING CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor1607/19/2026
RGA MECHANICAL CORPGeneral Contractor706/07/2026
PRESERV BLD RESTOR MGT INGeneral Contractor607/08/2026
V. DISALVO CONTRACTING COGeneral Contractor604/09/2026
MXP LLCGeneral Contractor507/08/2026
WILLIAM K CONSTRUCTION OFGeneral Contractor507/08/2026
H.I.I. CORPGeneral Contractor507/08/2026
ORBIT PLBG & HTG INCPlumbing507/08/2026
K.J. REMODELING OF NY CO*General Contractor509/24/2026
HAMILTON AIR COMPANY, INC.General Contractor407/08/2026
DEMAR PLUMBING CORPPlumbing407/08/2026
LL RENOVATION GROUP LLCGeneral Contractor303/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing307/08/2026
NSR II COMPANY INCGeneral Contractor304/09/2026
A & E GENERAL PAINTING INGeneral Contractor303/21/2026
Z.W. PLBG & HTG CORPPlumbing307/08/2026
DISALVO CONTRACTINGGeneral Contractor307/01/2026
DESIGN SMART NYC INCGeneral Contractor307/08/2026
VECTRA CONSTRUCTION CORPGeneral Contractor207/08/2026
GKF ELECL CONTRACTORS INCElectrical203/22/2026
MCGEACHY, DONALDElectrical203/21/2026
CUSTOM ASSOCIATES INCGeneral Contractor207/08/2026
CARRERAS HOME IMPROV INCPlumbing207/08/2026
BLACK SQUARE BUILDERS CORPGeneral Contractor203/21/2026
DENMAR ELECTRIC CORPElectrical203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROJECT TACTICAL SOLUTION5859308/17/2026
FIDATO CONSULTANTS8834307/28/2026
LEO Y LEE ASSOCIATES2481405/14/2026
INTEGRITY CONSULTING SERV666905/07/2026
ERIC SHEFFIELD ARCHITECT2195203/12/2026
CORTNEY WALLESTON ARCHITE3881111/13/2025
RYAN SPECIAL ENGINEERING2018203/13/2025
MARCH CHADWICK, ARCHITECT2253303/03/2025
AR ARCHITECT P.C.1171202/06/2025
STEVEN B. RABINOFF, ARCHI4375209/19/2024
Building Lifecycle
All (300)Filed (57)Permit Issued (61)Signed Off (27)Violation (11)Inspection (34)Objection (80)Special Inspection (30)
09/23/2026
Permit issued — General Construction
M01283747-S2-GC
09/08/2026
Permit issued — Plumbing
M01375482-I1-PL
08/24/2026
Permit issued — Mechanical Systems
M01375468-I1-MS
08/24/2026
Permit issued — General Construction
M01375162-I1-GC
08/17/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATIONS CONSTRUCTION# M01375162-i1.OF APT 7H AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. GENERAL
M01375482-P1
08/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
08/14/2026
Special inspection requirement — Post-installed Anchors
Max Lee
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROMIT GAJJAR
07/28/2026
Filed — Alteration
General construction work is proposed for unit #10H on the 10th floor. A subsequent plumbing application will be filed. All work is in accordance with the submitted plans. There are no changes to use, egress, or occupancy under this application.
M01145266-P1
07/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/20/2026
Objection resolved — Addressed
07/17/2026
Permit issued — Supported Scaffold
M00917537-I1-SH
07/17/2026
Permit issued — Supported Scaffold
M00917537-I1-SF
07/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/16/2026
Objection resolved — Addressed
07/16/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/10/2026
Violation issued (ECB, open)
Unknown
07/09/2026
Objection raised — Scope
07/09/2026
Objection raised — Scope
07/09/2026
Objection raised — Mechanical
07/09/2026
Objection raised — Admin
07/09/2026
Objection raised — Inspections
07/06/2026
Objection resolved — Addressed
07/06/2026
Objection resolved — Addressed
06/30/2026
Signed off — Alteration
Work in apt 19B only, 2 new ptac opening within apt, no change in use, egress or occupancy
M01185753-S1
06/30/2026
Signed off — Alteration
Work in apt 19B only, 2 new ptac opening within apt, no change in use, egress or occupancy
M01185753-I1
06/30/2026
Objection raised — Scope
06/30/2026
Objection raised — Admin
06/30/2026
Objection raised — Mechanical
06/30/2026
Objection raised — Admin
06/30/2026
Objection raised — Scope
06/29/2026
Permit issued — Mechanical Systems
M01000278-S3-MS
06/26/2026
Signed off — Alteration
Work in apt 19B only, 2 new ptac opening within apt, no change in use, egress or occupancy
M01185753-S3
06/26/2026
Permit issued — General Construction
M01000278-I1-GC
06/26/2026
Permit issued — General Construction
M01000278-S4-GC
06/11/2026
Filed — Alteration
M01375162-I1
06/11/2026
Filed — Alteration
M01375468-I1
06/11/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATIONS CONSTRUCTION# M01375162-i1.OF APT 7H AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. GENERAL
M01375482-I1
06/08/2026
Permit issued — General Construction
M01185753-I1-GC
06/05/2026
Permit issued — General Construction
M01185753-S3-GC-CX
06/05/2026
Permit issued — Protection and Mechanical Methods
M01233964-I1-PMM
06/04/2026
Permit issued — Suspended Scaffold
M01222508-I1-SC
05/16/2026
Special inspection requirement — Post-installed Anchors
Leo Lee
05/16/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
05/14/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01222508-P3
05/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
05/13/2026
Permit issued — Plumbing
M01354479-S1-PL
05/07/2026
Filed — Alteration
Work in apt 6K only, 2 new ptac opening within apt, no change in use, egress or occupancy
M01283747-S1
05/07/2026
Filed — Alteration
Work in apt 6K only, 2 new ptac opening within apt, no change in use, egress or occupancy
M01283747-S2
05/06/2026
Special inspection requirement — Post-installed Anchors
Leo Lee
05/06/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
05/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/30/2026
Permit issued — General Construction
M01354479-I1-GC
04/29/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedK.J. REMODELING OF NY CO*09/23/2026
DOB NOWPlumbingPermit IssuedJ&M PLUMBING OF WESTCHESTER09/08/2026
DOB NOWMechanical SystemsPermit IssuedOFLYNN PAINTING INC08/24/2026
DOB NOWGeneral ConstructionPermit IssuedOFLYNN PAINTING INC08/24/2026
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC07/17/2026
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC07/17/2026
DOB NOWMechanical SystemsPermit IssuedDISALVO CONTRACTING LLC06/29/2026
DOB NOWGeneral ConstructionPermit IssuedDISALVO CONTRACTING LLC06/26/2026
DOB NOWGeneral ConstructionPermit IssuedDISALVO CONTRACTING LLC06/26/2026
DOB NOWGeneral ConstructionSigned-offK.J. REMODELING OF NY CO*06/08/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN06/05/2026
DOB NOWGeneral ConstructionSigned-offRGA MECHANICAL CORP06/05/2026
DOB NOWSuspended ScaffoldPermit IssuedPRESERV BUILDING RESTORAT06/04/2026
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC05/13/2026
DOB NOWGeneral ConstructionPermit IssuedK.J. REMODELING OF NY CO*04/30/2026
DOB NOWPlumbingSigned-offDYNAMIC BLUE WATER MECH04/23/2026
DOB NOWGeneral ConstructionPermit IssuedV. DISALVO CONTRACTING CO03/04/2026
DOB NOWMechanical SystemsPermit IssuedV. DISALVO CONTRACTING CO03/04/2026
DOB NOWPlumbingPermit IssuedWALTER J.GRANDE P & H INC01/20/2026
DOB NOWGeneral ConstructionPermit IssuedV. DISALVO CONTRACTING CO01/05/2026
DOB NOWGeneral ConstructionPermit IssuedPRESERV BLD RESTOR MGT IN12/30/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN12/30/2025
DOB NOWGeneral ConstructionPermit IssuedV. DISALVO CONTRACTING CO12/22/2025
DOB NOWMechanical SystemsPermit IssuedV. DISALVO CONTRACTING CO12/22/2025
DOB NOWGeneral ConstructionPermit IssuedNSR II COMPANY INC08/06/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC07/21/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC07/21/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN06/20/2025
DOB NOWPlumbingPermit IssuedIMPACT PLUMBING INC06/20/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN06/06/2025
DOB NOWSuspended ScaffoldPermit IssuedPRESERV BUILDING RESTORAT06/04/2025
DOB NOWGeneral ConstructionPermit IssuedPRESERV BLD RESTOR MGT IN05/07/2025
DOB NOWPlumbingPermit IssuedAQUEDUCT MECHANICAL CORP04/25/2025
DOB NOWPlumbingSigned-offEVERGREEN MECHANICAL CORP04/24/2025
DOB NOWMechanical SystemsSigned-offCAREFREE AIR WATER MANG04/21/2025
DOB NOWGeneral ConstructionSigned-offLL RENOVATION GROUP LLC04/10/2025
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC04/02/2025
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP04/01/2025
DOB NOWGeneral ConstructionSigned-offK.J. REMODELING OF NY CO*03/27/2025
DOB NOWMechanical SystemsSigned-offDESIGN SMART NYC INC03/25/2025
+ 60 more permits on file
5 projects · most recent 05/07/2026
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2026Permit IssuedK.J. REMODELING OF NY CO*Heating and Air Conditioning Systems
Heat / Cool
Simon-Aire SSNS513H-32-AIO-UV 18,700 BTU · Ptac ×2
SS45513H 20,000 BTU · Ptac ×1
SS45818H 20,000 BTU · Ptac ×1
SSNS816H-32-AIO-UV 20,000 BTU · Ptac ×1
04/06/2026Permit IssuedDISALVO CONTRACTING LLCHeating Systems
Heating
General Electric AZ65H12DAD 11,800 BTU · Heat Pump Outdoor ×2
AZ65H07DAD 7,000 BTU · Heat Pump Outdoor ×1
AZ65H15DAD 14,100 BTU · Heat Pump Outdoor ×1
06/04/2025Signed-offK.J. REMODELING OF NY CO*Heating and Air Conditioning Systems
Heat / Cool
Simon-Aire SSNS513H-32-AIO-UV 18,700 BTU · Ptac ×2
SS45513H 20,000 BTU · Ptac ×1
SS45818H 20,000 BTU · Ptac ×1
SSNS816H-32-AIO-UV 20,000 BTU · Ptac ×1
10/12/2023Permit IssuedNSR II COMPANY INCAir Conditioning Systems
Cooling
Daikin FSXQ18TAVJU 18,000 BTU · Vrf Indoor ×1
RMXS48LVJU 54,000 BTU · Heat Pump Outdoor ×1
RX18RMVJU9A 18,000 BTU · Heat Pump Outdoor ×1
05/20/2021——Air Conditioning Systems, Ventilation Systems
Cooling
Carrier FV4CNF002 30,000 BTU · Fan Coil Indoor ×2
Ventilation
Wolf EX-01 400 CFM · Exhaust Fan ×2
7 projects · most recent 08/17/2026
Water/Sanitary Medical Gas Gas
FiledStatusContractorScope
08/17/2026Permit IssuedJ&M PLUMBING OF WESTCHESTWater/Sanitary
07/28/2026Signed-offDYNAMIC BLUE WATER MECHWater/Sanitary
04/06/2026Permit IssuedWALTER J.GRANDE P & H INCWater/Sanitary
02/24/2026Permit IssuedORBIT PLBG & HTG INCWater/Sanitary
06/04/2025Signed-offORBIT PLBG & HTG INCWater/Sanitary
10/12/2023Permit IssuedAQUEDUCT MECHANICAL CORPMedical Gas, Water/Sanitary
12/04/2020Signed-offSMART PLBG & HTG CORPGas, Water/Sanitary
25 projects · most recent 05/18/2026
General Wiring
FiledStatusContractorScope
05/18/2026Permit IssuedDENMAR ELECTRIC CORPGeneral Wiring
02/10/2026CompleteGLENDALE ELECTL CONTNG IN—
01/22/2026Permit IssuedJ.G.C. ELECTRIC, LLCGeneral Wiring
12/31/2025CompleteDENMAR ELECTRIC CORP—
09/30/2025Permit IssuedIKAROS ELECTRICAL ENT INCGeneral Wiring
07/29/2025CompleteSD ELECTL DIVISION NYC COGeneral Wiring
05/14/2025CompleteROMCON ELECTRIC, INCGeneral Wiring
05/05/2025Permit IssuedDENMAR ELECTRIC CORPGeneral Wiring
04/07/2025Permit IssuedLIPPOLIS ELECTRIC, INC.General Wiring
11/18/2024CompleteKJK ELECTRIC INCGeneral Wiring
07/23/2024CompleteMETHOD ELECTRIC LLCGeneral Wiring
10/17/2023Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
08/03/2023CompleteACCURATE ELEC'L CORP.General Wiring
06/13/2023CompleteVALENTIS ELECTRIC, INC.General Wiring
05/17/2023CompleteNY CITY ELECTRIC INCGeneral Wiring
3 projects · most recent 05/07/2026
Masonry Concrete
FiledStatusContractorScope
05/07/2026Permit IssuedK.J. REMODELING OF NY CO*Masonry
10/24/2025Permit IssuedPRESERV BLD RESTOR MGT INConcrete
06/04/2025Signed-offK.J. REMODELING OF NY CO*Masonry
1 project · most recent 08/10/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/10/2025Permit IssuedPLATINUM SERVICES NY LLCScaffold, Sidewalk Shed
1 project · most recent 05/14/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/14/2026Permit IssuedPRESERV BUILDING RESTORATSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 52
DateTypeResultReport
07/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/29/2026Fail-Final CND-Occupancy InspectionFailView ↗
04/13/2026Fail-Final CND-Occupancy InspectionFailView ↗
02/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 52.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/14/2026Tenant Protection Plan ComplianceMax Leespecial
08/14/2026Post-installed AnchorsMax Leespecial
08/14/2026Fire-Resistant Penetrations and JointsMax Leespecial
08/11/2026Fire-Resistant Penetrations and JointsROMIT GAJJARspecial
05/16/2026Post-installed AnchorsLeo Leespecial
05/16/2026Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
05/14/2026Tenant Protection Plan ComplianceMax Leespecial
05/06/2026Post-installed AnchorsLeo Leespecial
05/06/2026Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
04/20/2026FinalEric Sheffieldprogress
04/20/2026Post-installed AnchorsEric Sheffieldspecial
04/20/2026Fire-Resistant Penetrations and JointsEric Sheffieldspecial
04/17/2026Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
04/16/2026Tenant Protection Plan ComplianceALEKSANDR LEVINspecial
03/20/2026FinalMax Leeprogress
03/20/2026Mechanical SystemsMax Leespecial
03/19/2026Tenant Protection Plan ComplianceMax Leespecial
03/19/2026FinalMax Leeprogress
03/19/2026Fire-Resistant Penetrations and JointsMax Leespecial
03/19/2026Post-installed AnchorsMax Leespecial
03/02/2026Fire-Resistant Penetrations and JointsEric Sheffieldspecial
03/02/2026Post-installed AnchorsEric Sheffieldspecial
03/02/2026FinalEric Sheffieldprogress
02/17/2026Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
02/02/2026FinalThomas Tsueprogress
Latest 25 of 150.
▾Documents — 3,206 on file (BIS + DOB NOW)
▸Plans & Drawings110
▸DOB NOWPlans/Sketch81
09/03/2026M00495148-I1Request digital key ↗
09/03/2026M00488378-I1Request digital key ↗
09/03/2026M00647492-I1Request digital key ↗
Showing 3 of 81 on file for this type
▸DOB NOWPlans/Sketch - Plumbing18
09/05/2026M00250741-I1Request digital key ↗
09/04/2026M00204861-I1Request digital key ↗
09/04/2026M00204861-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems10
09/03/2026M00392954-P1Request digital key ↗
09/03/2026M00392954-P2Request digital key ↗
09/03/2026M00346681-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00451457-I1Request digital key ↗
▸Applications & Permits601
▸BISPLAN / WORK APPROVAL APPLICATION254
03/15/2024104341749Open ↗
03/15/2024103123308Open ↗
03/15/2024120239642Open ↗
Showing 3 of 254 on file for this type
▸BISWORK PERMIT APPLICATION252
05/21/2024104546172Open ↗
05/21/2024103949239Open ↗
05/21/2024101326575Open ↗
Showing 3 of 252 on file for this type
▸DOB NOWLPC Approval/Permit95
09/04/2026M00204861-I1Open ↗
09/04/2026M00204861-P1Open ↗
09/04/2026M00435447-I1Open ↗
Showing 3 of 95 on file for this type
▸Seals & Professional Certifications569
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION259
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 259 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature109
09/05/2026M00250741-I1Open ↗
09/04/2026M00204861-P1Open ↗
09/04/2026M00204861-I1Open ↗
Showing 3 of 109 on file for this type
▸DOB NOWProgress Inspector Seal & Signature69
09/25/2026M01088677-I1Open ↗
09/21/2026M00451510-I1Open ↗
09/02/2026M01175548-I1Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature68
09/28/2026M00792557-P1Open ↗
09/25/2026M00355577-P1Open ↗
09/25/2026M01088677-I1Open ↗
Showing 3 of 68 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Trade Schedules & Equipment217
▸BISSELF-CERT PLUMBING NOTICE81
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 81 on file for this type
▸BISSCHEDULE B - PLUMBING69
04/04/2022123578164Open ↗
Showing 1 of 69 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸BISEQUIPMENT USE PERMITS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Safety & Tenant Protection232
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist105
09/04/2026M00204861-I1Open ↗
09/04/2026M00204861-P1Open ↗
09/04/2026M00435447-I1Open ↗
Showing 3 of 105 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST62
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 62 on file for this type
▸BISTenant Protection Plan and Notes27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸DOB NOWTenant Protection Plan22
09/04/2026M00204861-I1Open ↗
09/04/2026M00204861-P1Open ↗
09/04/2026M00435447-I1Open ↗
Showing 3 of 22 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Environmental & Asbestos204
▸DOB NOWDEP ACP-5: Asbestos Assessment Report88
09/05/2026M00250741-I1Open ↗
09/04/2026M00204861-P1Open ↗
09/04/2026M00204861-I1Open ↗
Showing 3 of 88 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)58
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 58 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance171
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS88
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 88 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISTR8: Energy Code Progress Inspections12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
12/06/2021140900087Open ↗
Showing 1 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
12/21/2023120830208Open ↗
12/06/2021140900087Open ↗
Showing 2 of 3 on file for this type
▸Inspections & Test Reports99
▸BISTECHNICAL REPORT: RESPONSIBILITY72
02/15/2022140224040Open ↗
02/15/2022104357072Open ↗
02/15/2022103426623Open ↗
Showing 3 of 72 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 197518
12/21/2023103949239Open ↗
12/21/2023103949239Open ↗
12/21/2023103949239Open ↗
Showing 3 of 18 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)6
12/21/2023120830208Open ↗
12/21/2023120830208Open ↗
05/04/2022140955063Open ↗
Showing 3 of 6 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS3
05/04/2022140955063Open ↗
03/02/2022140224040Open ↗
Showing 2 of 3 on file for this type
▸Approvals, Objections & Sign-offs376
▸BISLANDMARKS APPROVAL132
06/05/2024101326575Open ↗
06/05/2024100687945Open ↗
03/07/2022100364945Open ↗
Showing 3 of 132 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST113
06/14/2024100687945Open ↗
03/29/2024103123308Open ↗
05/04/2022140955063Open ↗
Showing 3 of 113 on file for this type
▸BISADMINISTRATIVE OBJECTIONS50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISLANDMARKS SIGNOFF20
06/06/2024120830208Open ↗
06/06/2024104546172Open ↗
06/06/2024103949239Open ↗
Showing 3 of 20 on file for this type
▸BISSUPERSEDING LETTER12
05/21/2024104546172Open ↗
05/21/2024103949239Open ↗
05/21/2024101326575Open ↗
Showing 3 of 12 on file for this type
▸BISFINAL8
12/21/2023120830208Open ↗
12/21/2023120830208Open ↗
12/21/2023120239642Open ↗
Showing 3 of 8 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWLandmark Approval4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Cost, Insurance & Ownership243
▸BISCOST AFFIDAVIT214
04/02/2024103949239Open ↗
04/02/2024120239642Open ↗
03/08/2022102322210Open ↗
Showing 3 of 214 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW312
06/04/2024120239642Open ↗
06/04/2024103949239Open ↗
04/02/2024120830208Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms254
▸BISEFILING COVER SHEET95
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 95 on file for this type
▸BISADDITIONAL INFORMATION84
04/07/2022123578164Open ↗
01/31/2022123786554Open ↗
Showing 2 of 84 on file for this type
▸BISBOROUGH INTAKE FORM43
05/21/2024104546172Open ↗
05/21/2024103949239Open ↗
05/21/2024101326575Open ↗
Showing 3 of 43 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Other Documents73
▸DOB NOWProof of Historic Building25
09/02/2026M00729565-I1Open ↗
09/02/2026M00760420-P1Open ↗
Showing 2 of 25 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BIS* FIRE STOPS 27-3459
12/21/2023104546172Open ↗
12/21/2023104546172Open ↗
12/21/2023100369076Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWManufacturer's Specifications6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWCalculations6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWWaiver Document4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type