← Back
BuildNYC
Elevator apt, semi-fireproof without stores
884 WEST END AVENUE
MANHATTAN · BIN 1056560
💬 Discuss this project
1920Year Built
13Stories
D1Building Class
R8Zoning
94,328 sfGross Floor Area
66Units
LL97 CoveredRent Stabilized2 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: 884 Westend Owner · 9,939 sf lot · 9.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofExterior Restoration ProjectUnder Construction13p · 3 filings · 19 docs
Site & exteriorYmy ManagementUnder Construction22p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
884 Westend803/22/2026
EL-Rean Realty403/21/2026
Acuity Capital Partners303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
George J. Xerakias, PE106/16/2026
Richard Koenigsberg106/12/2026
SRL Associates104/15/2024
Ashraf106/23/2023
Philip Toscano Architects105/19/2022
Baileys Engineering112/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio203/21/2026
AE Design Solution203/21/2026
AK Consulting Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold1108/11/2026
Modern Services SolutionsGeneral Contractor404/09/2026
Igh Restorationspecialty_contractor207/08/2026
HNSGeneral Contractor207/08/2026
Everest ScaffoldingScaffold203/21/2026
Paolino FrankElectrical103/21/2026
247 ElectricalElectrical103/21/2026
Illuminous ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Koenigsberg Engineering2247106/12/2026
Sandeep Gunnala Engineering8482106/12/2026
AA Building & Inspection1519104/15/2024
Frame Design and Construction7971104/15/2024
Philip Toscano, Architect2474105/19/2022
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
11/08/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
M00894738-I1-SH
09/23/2026
At the time of inspection of a 13-story existing building with facade alteration, site foreman was present. Upon request, the rigger foreman failed…
ECB violation · open
09/01/2026
Elevator Category 1 inspection report filed
08/10/2026
Permit renewed — Sidewalk Shed
Renewed without changes
M00894738-I1-SH
257 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY08/10/2026
DOB NOWGeneral ConstructionPermit IssuedIgh Restoration07/06/2026
DOB NOWSuspended ScaffoldPermit IssuedIgh Restoration07/02/2026
DOB NOWGeneral ConstructionPermit IssuedIgh Restoration07/01/2026
DOB NOWSuspended ScaffoldPermit IssuedIgh Restoration07/01/2026
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY05/18/2026
DOB NOWGeneral ConstructionPermit IssuedModern Services Solutions05/21/2025
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY05/19/2025
DOB NOWSuspended ScaffoldPermit IssuedRSG Construction02/27/2025
DOB NOWGeneral ConstructionPermit IssuedModern Services Solutions06/04/2024
DOB NOWSuspended ScaffoldPermit IssuedRSG Construction06/03/2024
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY05/21/2024
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY06/24/2023
DOB NOWGeneral ConstructionSigned-offHNS04/04/2023
DOB NOWGeneral ConstructionSigned-offHNS10/24/2022
DOB NOWSidewalk ShedSigned-offEverest Scaffolding12/06/2018
BISSPISSUEDGo Greener Plumbing06/17/2019
BISOTISSUEDArtisan Preservation10/12/2018
BISOTISSUEDJaj Proactive Contracting11/10/2017
BISEQISSUEDEverest Scaffolding05/09/2017
BISOTISSUEDJaj Proactive Contracting05/02/2017
BISOTISSUEDArtisan Preservation02/17/2017
BISEQISSUEDEverest Scaffolding05/26/2016
BISOTISSUEDArtisan Preservation03/15/2016
BISOTISSUEDBig Z Builders06/12/2015
BISEQISSUEDEverest Scaffolding06/10/2015
BISEQISSUEDSpring Scaffolding04/22/2015
BISOTISSUEDSkyline Restoration04/20/2015
BISOTISSUEDAY Realty02/06/2014
BISOTISSUEDBasonas Construction03/30/2011
BISEQISSUEDOutdoor Installations02/01/2011
BISOTISSUEDBasonas Construction12/03/2010
BISEQISSUEDOutdoor Installations02/23/2010
BISEQISSUEDOutdoor Installations03/12/2009
BISEQISSUEDOutdoor Installations04/29/2008
BISEQISSUEDCity Scaffolding02/28/2000
BISOTISSUEDPLN Contracting09/14/1999
BISEQISSUEDCity Scaffolding07/16/1999
BISEQISSUEDAtlantic Scaffolding03/18/1997
5 projects · most recent 11/03/2026
Boiler Controls General Wiring
FiledStatusContractorScope
11/03/2026Permit IssuedCounty Electrical Contractor IBoiler Controls
06/22/2023Permit IssuedIlluminous ElectricGeneral Wiring
07/08/2022Complete247 Electrical—
12/03/2018CompleteBorowide Elect'l Contractors—
09/07/2018Permit IssuedStar Electrical Contractors—
1 project · most recent 06/23/2023
Sidewalk Shed
FiledStatusContractorScope
06/23/2023Permit IssuedPlatinum Services NYSidewalk Shed
2 projects · most recent 06/16/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/16/2026Permit IssuedIgh RestorationSuspended Scaffold (SC)
05/14/2024Permit IssuedRSG ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/15/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/16/2026Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
04/27/2026Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
04/27/2026MasonryRICHARD KOENIGSBERGspecial
04/27/2026Post-installed AnchorsRICHARD KOENIGSBERGspecial
04/27/2026Tenant Protection Plan ComplianceSandeep Gunnalaspecial
04/27/2026FinalRICHARD KOENIGSBERGprogress
04/12/2024Structural Stability – Alterations of existing buildingsSURESH WARRENspecial
04/12/2024Tenant Protection Plan ComplianceYounes Abouyaalaspecial
04/12/2024MasonrySURESH WARRENspecial
04/12/2024FinalSean Lenahanprogress
05/18/2022Concrete - Cast-In-PlacePHILIP TOSCANOspecial
05/18/2022Structural Stability – Alterations of existing buildingsPHILIP TOSCANOspecial
187 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account